ECONOMIC - MACHINE TOOLS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600221062-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 28, 2011
Sequence Number: 
1062
Case Number: 
Publication Date: 
May 16, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600221062-8.pdf133.36 KB
Body: 
Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600221062-8 CLASSIFI^4TIUN SWET CEI"'I RAL INTELLIGENCE AGENCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS DATE PUBLISHED 23 Mar - 9 Apr 1949 LANGUAGE Russian HOW PUBLISHED Daily nevspapers WHERE PUBLISHED USSR COUNTRY USSR SUBJECT Sconom: - :.-chine tools no 10011111 COMM I10O11AT1OI AI01CTIpiYO1 MTOIAL I00111Q OF 110 11%11 1TATM6 117011 7Cr 5"0110 Of UUPl*1011ACT IT i. I. C.. 11 A" 00.11 01111"..% III 71011101100 01010 09111AT10l 0, 191 10/1111/ I1 AR 101101 TO Ai 15 /00/1100 0111100 It PLW 1l01R1 IT CA11? IC01I(g17101 OT 7111 0011 It PMVIl01T00. SOURCE Soviet newspapers as indicated. DATE OF INFORMATION 1948 - 1949 DATE DIST. /(,,May 1949 SUPPLEMENT TO RE'`ORT NO. THIS IS UNEVALUATED INFORMATION MULTIPURPOSE MACE1NE TOOL PRODUCED -- Izvestiya, No 83, 9 Apr 49 The Odessa Plant for Radial Machine Toole has produced a multipurpose radial machine tool of original design. Tests have shown that it is superior to the beat foreign products. The new machine tool consists of 11,000 parts; has a maximam drilling diameter of 75 millimeters; has 24 speeds and 18 feed rates; and can perform stout ten different operations simultaneously. The hydraulin control of the machine is operated by one lever. Upon completion of the operation, the machine tool stcpa automatically. TOOL PLANT CONVN'RTS TO AS8 4BLT-Lm PRQAUCTION -- Vechersyaya Moskva, No 78, 2 Apr 49 The Moscow Tool Plant is converting to assembly-line production which will cut the assembly cyc.e in half. Productivity of labor will be increased 70 percent and 57 workers will be released for other work. In 1949, the plant is planning to install a conveyor, to carry assembled tools from the shop to the -arehouse, and to increece to 400 meters the total length of conveyors in use in the plant. BARING PLANT INCRSLSBS PRODUCTION -- Vechernyaya hoekva, No 77, 1 Apr 49 Workers of the Bearing Plant imeni L. M. Xaganovick, in Moscow are striving to fulfill the Five-Year Plan for production by 1 May 1949. Some of the shops, such as the ball-bearing, precision bearing No 2, and needle bearing shops have already reached the 1950 level of production. STATE MNT CLASSIFICATION Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600221062-8 Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600221062-8 MACHINE--TOOL PLANT SPEEDS UP PRODUCTION -- Sovetskaya Beicrussiya, No fib, 7 Apr 49 Following the example of Moscow factories, the workers -_f the Machine- Tool-Building Plant imeni Komintern in Vitebsk, Belorussian SSR, have pledged to speed up the turnover of working capital by 20 days and to re- leave 400,000rubles during 1949. They have already released tlae first 100,000 rubles of working capital. KUTADSI PLANT EFT'ECTS SAVINC1 -- Zarya Vostoka, No 57, 25 Mar 49 Adoption of more efficient production methods resulted In the saving of 1406,509 rubles Luring 1948 for the "Gornyak" Machine-Building Plant in Kutaisi. SAN MACHhI3$-TOOT, PLANT FULFILLS PLAN -- Kommunist, IYo 77, e+,;r 49 The Plant imeni Dzerzhinakiy, Yerevan, Azarenian SS, ^ulfilled the first quarter plan-for production of machine tools. Production coste de- creased 20 percent over 1948. The plant began production of modernized high-speed machine tools. In honor of 1 May, the foundry has pledged to produce 30 tone of iron castings above the April plan, The assenbly shop has pledged to fulfill the April plan, for basic production 140 percent and to produce five stone-cutting' machine tools above the plan. MAOhine shops No 2 and 3 will produce an additional 20 units of machine-tool, parts in April and will aseint the body-parts shop to produce units of parts for 100 machine tools. Workers of the Yerevan Machine-Building Plant imeni Dzerzhinekiy has pledged to speed up the turnover of working capital by 3 days and to re- lease 250,000 rubles of working capital. Plans call for shortening the parts-production cycle, immediate shipment of finished products to con- signee-, elimination of superfluous stores of raw materials, supplies, and unfinished products. In the foundry a compressor will be installed which will permit trimming of parts to to chan.ed over from hand opera- tions to an hydraulic process. Eight machines will be converted to high- speed metal cutting. ,r- Sanitized Corv Approved for Release 2011/06/28: CIA-RDP80-00809A000600221062-8 1