RAILROADS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600230551-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
July 18, 2011
Sequence Number:
551
Case Number:
Publication Date:
June 10, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 148.19 KB |
Body:
Sanitized Copy Approved for Release 2011/07/18 :CIA-RDP80-00809A000600230551-5
REPORT
CO N0.
DATE? OF
DNFORMAT90N i949
iJATE D18T: !~ Jun 1949
5tlPPtEMEP!'r 1'0
REPORT N0.
LATYL-H 88R RAIL Il~'ROVB~l8NT8 -- Gurtiok, No 50, 27 APz' 49
Ths rbstoration of 1,700 kilasrtsrs of railroad track, 56 stations, and 15
derats hoe been completed i.a the Latvian 8811. The pivrvar level of average daily
tsviight hanled~eula of freight oar taraonr?_has;;tiaen eiooNdlld:' last yiar,
"Pyatiletku -- s ~ gads" (31ve-Tear Plan ih_T.our Tsars) railroad^ooL~ntes~vers
oraagsd.~.Today, 140 iocamotivs briesdsa are organised ander'these'ooleniaPia
a]y+dePets. These colonies have rav+edl 3,~5p tom of feel a~ have dslivrf~! to
Sill:$~a~R.P3R,?~ _"~l'a eavatd,in repair asd'ia ass of materials.
Eleotxtr, trains will soon b~ introduced oa Biev suburban railroads. Elec-
trif?cation will began on the Bier-Notovi3.ovka aid Kiev-Darnitas sections.
8l=-oar electric traia~ will run every 5 :niantss. :'he Peurovo Pleu~ has elxeedy
produced tea sash trains, each of which will aerry 900 passengers. The mazimam
speed of as electrio train Se 80 lc?lonetere per hoar. Twenty-nine of these:
trains will operats ?in 1950.
The electrification plan far *.he euhn:>ea transportation sys';a provides
for en increase in the number of train to a total of qJ pairs of trains is
24 hovers. The first electric trains on tte Bisv-Bunxka section w!1.1 stmt to
operate at the eni of this. year.
CHAiIDZHO(T-Et1RGRAD RAILROAD COfiSTRI30TI0h -- Pravda Poetoka, No 84, 29 Apr 49
t'.caetrnction workers on the- Chanizhou-Sungred rai]road line caaploted the
b-month p]an in 4 aunths. ^'he f`xet-quarter p'en Mss fulfiU.ed 175 percent.
Conatr~etior costa bare been loverxt 4.5 percent.
The railroad track hoe been laid tc within, 30 kilometers from the vii]age
of Babekla. The railroad rune 9C kilometers through the Bare E.ffi desert.
INFORMATION FIROIN.
1~OREIGPI DOCi.IMEN'T$ OR RADIO ~~80ADGASTB
ce~sslr~`,rlanl
CAUE~lTRY IISBR
SUB.lEC7 Reisxoada
HOW ,.
PIIBI.ISkIED Daily newapaper?
PUBLISHED
DATE ;
Sanitized Copy Approved for Release 2011/07/18 :CIA-RDP80-00809A000600230551-5
Sanitized Copy Approved for Release 2011/07/18 :CIA-RDP80-00809A000600230551-5
b07Ag0YL DEYfl??P SPEI?8 LUC4,MOTI6E RBPAIR -- Gudok, No 57, 13 gay ~+9
Xa?hing repair of locoa~tivea Sn tho Bologoye Depot. has been epmeded np a
now xrequirea no more than 15 home, instead of the 50 - 64 houxaa Wane?sary a, ydar
The depat has slats installed a now machine far pressing valve ?leovea.
(zolotnikavaya vtulkm) which erneabisa onE man to do in 30 :ainutee ghat used to
take eight men k home to db.
7QC0!(02',I~