TRANSPORTATION-RAILROADS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600230852-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 18, 2011
Sequence Number: 
852
Case Number: 
Publication Date: 
June 23, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600230852-1.pdf143.28 KB
Body: 
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230852-1 COUNTRY SUBJECT . NOW PUBLISHED WHERE PUBLISHED DATE PUSUSHED LANGUAGE INFORMATION FROM FOREIGN DOCUMENTS OR RADIO I3ROADCA$TS CD NO. DATE 01ST. ~3 Jun ? 1949 NO. OF PAGES 2 . SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION =710 MW WAIS AND LOADING PRWXVMB The loading of wheat front last year's crop now stored in warehouses of stations of the Odessa Railroad Systoa is far behind soheoule. The progrsa rewires all storehouse% to be enty by 1 June, but only SO pax cent of the boa can loaded daily are being loaded v!.th wheat, while the rest are being used for less important cargoes. In many oases freight cars are 'mnecesaa:- ily being laid up for repairs. revs DATE OF INFORMATION 1949 Transportation - Railroads Daily newspapers TIM 20 May - 1 dun 1949 CLASSIFICA" CENTRAL INTECLIGENCE AGENCY REPORt RXFAIR V= TUMI 02 VMS DQISTS SIIITJD( -- Oudok, to 63, 27 May 49 Repair work an the Worth Donets Railroad Systea is being hindsrsd by improper use of railroad repair egaipismt. IYny sections of trd!?systea eaWed the winter in poor ocmdition. Teats showed thattthe nvi of is- foots along the Rodakovo Section had doubled since December, aid the number of defects along the Ohistyakovo Section had increased 300 percent. Serious defects were disoorered in the Ycroshilo-grad and Shterowka sections. However, such of the road-repair machinery is lying idle beam.. Rsin- tenaaco workers regard it with oouteMlpt. The machines are sent from station to station and then left idle on eidia . The system's'velding;ta-ia.: lgt 183 siohine-skifts during the first qu?rt of this year. Of 13 movable alee- trio power plants on the tiklto-~8q on, only two ale being need. A road- levelling aaohine, fc* which the: t demand in all swtions of the system, lies idle on a siding in Eupyanak. N Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230852-1 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230852-1 Fret ht car delay in ho Gorlovka Railroad $taticn has been out 20 hours in cctpariecn ,i" January 1949. COELQYIA STATION CUTS CA1 DEI1Y -- Cudok, 1Q- Oh, 29 !,Ay 49 Nc1t less than 35 percent of the freight handling .one by the station is Section, who is more concerned with achieving record runs by a few individual and Chertkovo 1,727 locomotives were delayed 2,358 hours above the norm. The proportions. During 5 months of 1949, 695 locomotives were delayed pa total Delay of locomotives on the Rcasosh' Railroad Section has reached serious RCSSOSB' LOCOMOTIVE DELAY SEL'IOUS; STEPS TASEN -- Gudok, No 64,,29 May 49 Steps have been taken to improve conditions reported in Gudok for 29 May 1949. Workers of the Roseosh' Section have entered into oom{petition to improve operations, and delay has been out considerably in the foesosh!, Sa?uny, and other stations. RAILROAD, PORT WORMS COMPNTL -- Sovetskaya Litva, No 124, 28 May 49 Workers of Saunas railroad terminal and of the Nemn River Steamship Line have entLlo. into competition and made mutual agreements. Railroad workers have agreed to send the port wo:.kere railroad care in good condi- tion for loading freight and on time. Port workers have determined to ex- ceed the year plaa for loading and unloading operations by 7 peroer4. AZ BBAYDZHAN FREIGHT CAR TURNOVER SPEEDED -- Bakinskiy Rabcchiy, No 97, 20 May 49 In 1948, freight car turnover on the Azerbaydzhaa Railroad System was accelerated 12.2 hours over the 1947 figure. Th- 1949 plan cello for speed- ing freight car turnover another 15.4 hours. An enormous carriage to used to carry boilers from the boiler shop to the as- sembly shop. A device called a tractor is used in connection with automatic welding. A large washing machine is used to wash all parts of dismantled locomotives. Valve sleeves and valve cylinders are mode with a centrifugal casting ssoohine; spoilage on this mchine is only 2} percent. During 1946 the plant expended 9,=00 man-hours on capital repair of loco- motives. During the first quarter 1949, 6,500-6,700 man-hours were expended on capital repair of locomotives. POLTAVA RXPAIR PLANT USLC4 n W )WTEODS -- Oudok, No 64, 29 May 49 Nary new innovations are being used in the Poltava Loocmotive-Repair Plant. NEW STATION BUIZDING IN ZDOLBUNOV -- Cudok, No 65, 1 Jun 49 A nev station building has been put into use at the Zdolbunov Railroad Sta- tion. The building has rooms for mothers and children, waiting rc'oms, and s restaurant. Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230852-1 I 50X1-HUM