ECONOMIC - INDUSTRIAL MACHINERY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600230950-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
July 18, 2011
Sequence Number:
950
Case Number:
Publication Date:
June 28, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 125.27 KB |
Body:
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230950-2
COUNTRY
SUBJECT
CUISSIF' .TION
CENTRAL INTELLIGENCE MENCY
INFORMATION FROM '
MOM
Economic - Industrial machinery
PUBLISHED Daily newspapers
WHERE
PUBLISHED . USSR
DATE
PUBLISHED 2 Nov 1948
LANGUAGE
fau DOS~ *NOW WONAO M aaad wa N914. sasiaa
er n" !""R mm "1411 1w aua M 144419 so a
W a. 4It aaa a1:M~ 94.11. en omewa tae u"BN1a114
SOURCE Soviet newspapers as indicated.
DATE OF
INFORMATION 1948
OATS D ST. A f Pan 1949
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
MACHINE-BUILDING PLAARS COMPLETE PLANS
PRODUCE NEW !gyp
TBILIBI NNT PRISIS REPORT SUCCESS -- Zarya Voetoks, No 219, 2 Nov 48
The,Tbiliet Machine-Tool Building Plant iasni Kirov has realisel ante than
1.3 million rubles of profit so far in 1948. The plant is converting to assembly-
line methods the production of parts for the DIP-300 lathe.
The Machine-Building Plant imeni 26 knmisserov has realized more than 2 million
rubles pr fit by extensive mechanization of lobar-?carsaing processes, laporoviag
the toemsology of ,roeeseing nettle, and inpro-i-?g the ouality of production.
Thy "Teentrolit" Plant exceeded the 9-month gross-production plan. The Plant
sad put tour coating machines Into operation this yes.. and has saved more than
500,00 rubles.
The "Stank" Plant exceeded the 9-month plan.
A completely automatic sis.vt pipe nutting-off =China tool of the "9B165"
type vas put Into production in October 1948 it the Tbiliei MsoLine? To1
Building Plant.
GOI1 ' PLANT UPS PEAT-MACR18E OUTPUT -- Sovetskaya Kirgiziya, No 218, 2 Nov 48
The Gomel' "Dvigatel' revolyutsii" Machine-Building Plant of the Ministry of
Local Fuel laduet-y Belorussian SSR cospleted the 1948 gross-production plan
on 20 October 1948. Daring 1948 the plant started production of 24 different
types of machines for the peat indnstyy.
The plant has promised to provide the Bobruysk Machine-Building Plant vith
parts for dredge-elev+??or mmmchines and the necessary technical aid for producing
the maohinea.
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230950-2
CLASSIFICATION
I
Woman
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230950-2
ELECTRIC EXCAVAMOR MAIM IN TOAUATORSTr -- PrevAR Ukreiny, No 260, 2 Nov 48
The Novo- KrammtorakPlant imeni Stalin has just produced its first electric
caterpillar excavator designed for heavy loading work, In cuarries. The exca star
has 20,700 parts and a x-cuUc-meter bucket. It weighs 17`z tons.
ZBAANOV PL.41iT RUCHES PREWAR LEVEL -- Pravda Ukraigy, No 260, 2 Nov 48
The "Ultramarine" Plant in Zhdanov has attained the prewar level of gross-
production output and has pledged to complete the Five-Year Plan by 1 ! j 1949.
NSW DKWICE FOR RMENERATING LUBRICATING OIL -- Sovetskaya KirgiLiya, No 218,
2 Nov 48
The.Osh Motor Repair Plant has produced 20 devices for regenerating used
lubricating oil. Tests have shown that. th regenerates all to just as good as
now oil. The regenerating device was designed to operate on wood and coal, 'but
the heating system has been converted to operate on waste products obtained from
the regeneration of the oil with a wall anentity of petroleum added. The device
will enable NTSe,of Osh Oblast to regenerate up to 80 taus of lubricating oil
peryear and to save nearly 60,000 rubles.
ARTEI. COMPLETES YEAR PLAN -- Sovetskaya Beloruaa1ya, No 218, 2 Nov 48
The "Kiaanyy Metallist" Artel, largest in Bob uyek Oblast, completed the
1948 production plan and produced 2,310,000 rubles worth of goods above
the 1947 level.
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600230950-2