ECONOMIC - MACHINERY AND MACHINE-TOOL INDUSTRY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600240327-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
July 6, 2011
Sequence Number:
327
Case Number:
Publication Date:
July 15, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 140.27 KB |
Body:
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240327-2
1
COUNTRY
SUBJECT
HOW
PUBLISHED
WHERE
,PUBLISHED
DATE
CLASSIF TION
INFORMATION FROM
rvnciL i'4vv~ i~mtia I O,e nr~u Ci DKUiiULA i j ~,U IVU:
to iy
PUBLISHED 7 - 18 Jua 1949
LANGUAGE Russian
TN13 000ONINT CONTAINS INSOINATION AIIICNNS TIES NATIONAL MERGE
01 THE SAKES STATES WIMN TN! 54151110 OF [[TONA[[ ACT SO
N. A. C.. SI ANO S[. AI 0115010. ITS TNM[NIKIOI Se:1N^ A[T[IANge
OP ITS CONTENTS I! ANT MANN[[ TO AM IYIIIT 0111750 ICNKN:5 ISO
NINTH" !T LAS. [IINCOOCTION or TNtl SON. IS MONINITOA.
SOURCE Newspapers as, indicated.
DATE DIST. dJul 1949
NO. OF PAGES 2
SUPPLEMENT TO
REPORT NO.
MACELI'ERY AND MAC113 TOOL PLANS
pRODTJC, NBW EQUIPMENT
RUSTAVI PLANT TO CRT ROLLING KILL -- Zarya Vostoka, No 112, 10 Jun 49
The Novo-Mramatorsk Machine-Building Plant Is now engaged in building a p!pe-
roiiing mill for Fustavi metallurgists. This machine will be installei< in a
20,000-square-meter area. Plant engineers prepared more than 3,000 different
plane in designing this machine. The plant is also building a holding furnace
for nolten pig iron for the Transeaucasus Metallurgical Plant,
"IT'3I RT]$` PLANT BUTLTIS MT MAC3FSN;RY -- Sovetskaya Batoaiya, No 135, 10 Jun 49
In May the I'll 'marina" Y b1ne-Baildin& Plan; asaemble4 ?A'P rollers for Estonian
peat fields. The plant is also working cr the FTS peat-collecting m,,ujae.
IRNIBGRAD PLANTS MAf MW POWER EQUIPI NT -- Sovetskaya Lltva, No 134, 9 Jun 49
The Metal Plant imam Stalin in Leningrad has tested a new 25,000-kilowatt
high-pressure steam turbine. The new machine is very sconamtical and highly
'!teUnt P rte of 1%c new u b5.ue ace etamardized with the parts of turbines
previously produced by the plant. In addition, new orignial elements of steam
distribution and control are applied in-the new turbine.
Pravda Ukrainy, No 142, 16 Jun 49
The "Kinap" (motion-picture equipment) Plant in Leningrad is producing
portabla electric power unite for movable motion-picture equipment.
- 1 -
CLASSIFICATION ET
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240327-2
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240327-2
CT 50X1-HUM
C12I1 )ING, SCRAPIH NiCA0.TIIZEL AT AYTOM7A'I' PTATIT -- lseningradskaya Pravda, No 132,
7 Jun 4g
Vasiliy Odintuov, a gauge make., at the Avtomat Plant iii Leningrad, had
devised a method of grinding rh p=: cnrr,.c,zrs on a machine tool, This involved
designing a special radial cuttar anc an attachment to make possible elliptical
,:..Another new attachment on the P11 ,rPnte-vrin,ii,, -1,4-
n i,t,.a
wheels,
wheels, ousting, soldering, and grinding the parts of a spline gauge on ,a surface
Ee also aevise~i ae, ne of mork_ng, hammer.inE out the semicircle drawing the
1e much higher. He bas now jxtended the'procesc to eoraping three prisms at
once on the case machine. This machining can be done by a semiskilled worker.
to scrape a center piiem for an autoinatic machine-tool support in 2 ho'n'e 5
minutes instead of the 7 hours re4utred by the handproaeas. The precision
'Adapting a ti face-grinding tcachine to scraping the; Surface of a machine-
tool headstock is another of O1inteo7's innovations which willsoon be in
NEW MACHINE TOOTS JJEVELOPSD -- Leningradakaya Pravda, No 135, 10 Jun 49
Workers of the Machine Tool Plant imeni Ordzhonikidze in cooperation w~th
workers of the Central Scientific Research Institute of Heavy-Machine Building
(T8RI'1c.sh) have successfully complatedtests on highly porous abrasive wheels
for high-speed grinding. The high tar-Twee porosity of these wheels acccunts
for a 40 - 70 percent increase in productivity.
Sovetskaya Beloruaeiya, No 114, to Jun 49
The Minsk Machine-Tool Building Plant has developed a new vertical broaching
machine, the 7-A-710,
tl'lC, IERI' 1'1ANT3 iqIPT:L P AN:i -i-:oyaya `.ioskva, No 141, 15 Jun 49
The "3ra6naya Yresnya" Co.et: ;:o.e Plant has fulfilled the half-year
plan. It has deposited =50,000 rtib_cs in the State bank. Profits during 4
months amounted to 1.3 million rubles..
Praveda Ukrainy, No 134, 9 Jun 49
Wnrkw*?a At the Rhe-krv "Sr t. ehnkhtern" Plant . prod.nan above the ?i..,
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240327-2