ECONOMIC - LAND RECLAMATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600240636-9
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 6, 2011
Sequence Number: 
636
Case Number: 
Publication Date: 
August 1, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600240636-9.pdf117.75 KB
Body: 
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240636-9 VM3Jl l d' I avn K A CEN' ',L INTELLIGENCE AGEoCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS COUNTRY '1 o.1oulcva.y SUBJECT Economic -'lend reclamation HOW PUBLISHED Daily newspapers WHERE PUBLISHED Belgrade DATE PUBLISHED 12 - 16 Jun 3.949 LANGUAGE Serbo-Croatian WIN women COOTYU tons""" HTOOIIU TAO UTMOSL NRE1 OF TOC OYTIOI OTOTU VInrC TIM OUOIRM C, ""OWN OCT U O. O. C.. s, InY OO. u ?IIOORMF. m TODU1UMU U TU UTK$TM1 M ITO COORlI IN UT ILTI I TO Y OOLOTOOMUO PROOOI IO. FOO. OIOITCO My UV. UMMOCTMC OF TOn FORM tl FOONOITOO. ~ DATE DIST. / Aug 1949 NO. OF PAGES 2 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION SWAMP DRAINAGE TO BEGIN IN THE BARANJA -- Politika, No 13265, 16 Jun 49 The draining of the Biljeki flit, which extends from the Danube to the Drava along the triangle forming the Baranja, will begin about 1 July. This is one of the major projects of the Five-Year Plan. This vast disease- ridden area near Osijek will be transformed into farm land, with 9,560 heo- tares suitable for cultivation. A levee 28 kilometers lrmg will by built along the right bank of the Danube and the left bank of the Drava, a4d a net of new canals 73 kilometers long will be cut. Electrically operated pumping stations with a total capac- ity of 14,000 liters of water per second will be installed at two strategic points. They will be capable of irrigating 7,000 hectored of land if necessary. The network of canals will control the flow of water into the Danube .w.. the Drava from their tributaries. At first, hemp will probably be the only crop that can be planted in the reclaimed area. If potatoes, for example, can be grown later on the entire 9,560 hectares, the resulting crop of 965,000 metric centners per year will be worth over 197,800,000 dinars annually. MACEDONIAN PROJECT PROG13EB8ING -- Barba, No 138, 12 Jun 49 Tha Pelagonia reclamation project in Macedonia was stated is 1947. .1 vast area of land now under water will be trandfornei into fertSlo A land, tha future gra-iary of Macedonia, by 1951. The cutting of a new bed 60 kilometers long for the Crns River will drain 50,000 hectares, while the building of irrigation canals will render another 50,000 hectares cultivable. So far seven streams have been dredged and over 400,600 cubic meters of earth excavated. The Five-Tear Plan Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240636-9 STAT Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240636-9 provides for a total excavation of about-9 million cubic matere of earth and a total expenditure of 700 million dinars. This year, the bed rf the Crna River Is to be completed fr z Skocivir to the mouth of the.Jelaeka River. This will involve excavation of about 2 million cubic meters of earth and reclamation of 25,000 hectares of land for planting next year. CANAL TO AID RICLAMATION IN SIAVONIA -- Politika, No 1326% 16 Jun 49 Sailors from the Yugoslav Navy are building a canal from Zapolje to Orlaava, one of the most Important reclamation projects in the 31 vonien poije. Irrigation and drainage of swamps will make 28,000 hectares of,land along the Sava available for cultivation. The canal will also be need for flooding a rice field near Orijava. The canal will be 3 - 6 meters deep, enough for shipping asphalt to the Brotherhood and Unity Highway which parallels it. Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240636-9 STAT