ECONOMIC - RECLAMATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600250043-6
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 1, 2011
Sequence Number: 
43
Case Number: 
Publication Date: 
August 24, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600250043-6.pdf172.03 KB
Body: 
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250043-6 I --- = -- -`` u easy metnoe wouic navy Deep to lower the level of l..:ke Skads-' by regulating the Bojana and Drim rivers, TI Is would have involved the least expenditure of time and money, and all previous plane for this pro,'ect he-e beoh based on this method. However, th:: ice; tc this method is the net of waterways converging at Shkoder, which _s in Albanian territory. Tho rri, alternative is to drain the Yup,oelav parts of the basin, to build a levee to Protect Yugoslav farmland from floods, and to drain part of the ::ace itself. Thousands of hectares of land would thur be made available Tor the culture of cotton and Mediterranear crops. To do this ,,ithout rais- ing the ie,vel of the lake and thus aggravating flood conditions on the Albanian Side poses grave problems. To solve these problems, a tunnel will. be built to carry the excess water thrbugS the intervening mountain to the Adriatic. &ra>;,'natloe of the terrain and research on this new project began when the Albaaiaa government withdraw from the agreement. The engineers came to the conclusion that building a single level) would result in disastrous f looc:> "song the entire emban}azent in case of an unusual r! se in the water level, ? od I?ult_v,tion could not be unr ertake-n at any po`nt until the entire ?Pvae vtier completed, Instead, a series of four eborter levees will be built. eo.cr. "3 f+.nie::od, .he land protected by it will be ready for cultivation. ~t1~twT~ww CLASSIFICATION 9 TFYs CCUNTRY SUBJECT HOW WHERE DATE LANGUAGE S!FIC ";N GEC RAL ;1.7__IGENCE AGENCY INFIRMATION FHCIXi FOP7IGN DOCUME`i5 OR RA':; 3ROADCASTS ac aa~:c Rt orrr.`-tion D,; i i y -.=.vspapere 3eiiTada "I Jun, 1 Jul 1949 TX I/ 0000N[NT I.ONTAIXY IRIORNA?IOR AIIIC1I** tN[ NATIONAL. OICINI[ 01 TN[ UXIf[0 fTA1CI .:TNIN TN[ NIA.IXY 0I, IICIONAIY ACT CO Y. t. C.. 11 *00 C1. AC A.[NO[0 ITS 711 NI.IIIIC.. ON T.1 N[YIL1fOR O! ITC *0001004,11 RRT YANN[4 YO AX UXAUYNORII[0 ICRCON 11'X40? NIY:T[4 IT LAY. N[XRO-UCTIOX OI tNl[ ION. If IXOFIIIT[O., SOURCE ,?EPORT Cr) NO. .DATE oF DATE DIST.,~yAug 1949 NO. OF PAGES 2 REPORT NO. 1HIS IS UNEVALUATED INFORMATION LAKE SKADAR, BARANJA iTru RMleTiUN PLANS nEVEA.LLD tiYL'.TEi2AI. ? ?7`LAt A7'IO,+ OF LAKE SKADAFc -- Borba, No 154, 30 Jun 49 Although the Albanian government in hhroh 191!9 refused the Yugoslav proposal fL.r the lolut reclamation of the Lase Skadar hesin by the two cot= Aries, with Yugoslavia providing most of the facilities, the 'Yv.l,)alev Federal Planning Coy .sala4 has decreed that Yugoslav reclamation work on ih rrcjcot shall begin bf 1 August. ARMY___ AIR Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250043-6 Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250043-6 reclamation tunnel can also be used for water 'transportation. Titograd-Vir Pazrr-Bar highway. The tunnel from C rmnica Polae under Blount,8021na A total area of over 22,^0', bectar~-,> will be reclaimed for cult Ivetlail 841 workers' housing built, a drinking water supply provided, and machinery and Before the construction of the levee: and the digging of the tunnel begin RECIAM TION IN I the levees, 9,650 hectares of new land vill'be available for cultivation. The project includesthe construction of a 28-kilor'eter protective levee, 7 watchman's buts, a 28-kilometer telephone line, a'76-kilometer drainage canal, 6 concrete bridges, 6 dame, and pumping etacions at Podravlje and Rol,wo. the "Belie" State Farm is the 4laranja,will beglo. After the oonstrastion of Volunteers from the People's Front will build 10 kilometers of levee, 3+J kilometers of which will be finished this year. The reclamation of the Rit will yiold'a large area for growing vegetable crops for the Jeijek market, while Kopacko Jezero (Lake) will provide a year- round source of fish for the city. Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250043-6