ECONOMIC - POWER AND FUEL
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600250834-8
Release Decision:
RIPPUB
Original Classification:
R
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
July 6, 2011
Sequence Number:
834
Case Number:
Publication Date:
October 3, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 113.91 KB |
Body:
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8
CLASSIFICATION RNSI?'RCT f3 RESTRICTED
CENTRAL INTEL GENCE AGENCY REPORT
INFORMATION FROM
COUNTRY
SUBJECT
HOW
PUBLISHED
WHERE
PUBLISHED
DATE
PUBLISHED
LANGUAGE
FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO.
This 0000RRRT l0RTUR1 Iarollmoll A?RCTUT1 TMl 1000001. OPOV11
TUl RRI7I0 1TAT11 UITIIIU till R10R100 01 4RF00001 :ACT ,0
R, 1. 0.. 1t 000 IS. T/ 051100*. IT1 TIARIR11110R 90 T0R R/YlhJ TlOtl
OY ITl CVRT15T/ IN OUT 001111 TO 0R U00UTROR000 FI1100 L 000
l1RIri0 1. LATI. R1,0000'1T101 d, 'MIS MR IN 1WU01TI4:,
DATE DIST.3 Oct 1949
NO, OF PAGES 2
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
WILL CONTROL viAf YIEVRL ON THE DRATA -- Tehnika Narodu, Jo 33, 17 A::g 49
A lags hydroelectric power plant is being built at Vuzenlaa of the Dravu.
A section of the river 160 meters long add 65 meters wide has been walled off by
means of a,concrete dam 12 meters high. The ground will have been prepared for
the construction of concrete foundations by September 1949?
Thsplsnt to expected to begin operations by the end of the Five-Tear Plan.
When ready, it rill produce the sane amount of power as the Mariboreki Otok
hydroelectric power plant, which VAe put into operation last year.
A s stea of hyd_?oelectr1o avower plants will b7 built on the Drava from )aribor
to Dravograd., and the Vuzenica power plant, which will have a receraoir of 19 million
cubic meters of rater, will regulate the water supply to ail plants downstream and
prevent significant changes in the water level. All the plants on the Drava will
receive water and produce power steadily, regardless of fluctuations in the water
level originating in Austria.
BQSOTICAAT Li4TEIC M ft II ROV!D -- Barba, No 197, 20 Aug 49
Preliminary work on enlarging the existing equipment and installing new egniF-
ment at the Subotioa thermoelectric power nlalrt is now taking place. At present,
the plant uaanot supply its industrial consumers with sufficient power without the
help of the 'bnta power plant.
A new etean boiler, twice as large as the old one, will be installed. To
supply water to the old and new boilers, a large new reservoir has been built. An
experimental installation w'itb.moving chain grates has been finished. All controls
are now concentrated on one panel. New air pipes have been added in order to
increase the burning efficiency of the ftrrnace. As a result, a cheaper quality of
coal can be used.
STATE 14 NAVY NSRB DIESTRIBUTION
ARMY AIR Fe I
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8
PMCLWM FROM OIL SALE -- Pclitika, No 13313, 11 Aug 49
On 1 Ike;, 1949 the first stream of crude petroleum gushed from the oil-shale-
processing installation at Alekoinac. another and mach larger installation f01
processing oil shale 'will soon be built nearby.
P141POMM'PSMUCTIONFAR A8EA'D -- sad, No 179, 29 Jul 49
iugoslAvia produced no petroleum until Just before the war, 'when a little
capital construction was done and 1,000 tons of crude oil were produced.
The Five-Year Plan provides for almost 30 ttmas more petroleum production in
1951 than in 19h6, .to be accomplished by doubling production every year.
During the first half of 19' 9, three-quarters of the 1951 goal for petroleum
RESTRICTED