ECONOMIC - POWER AND FUEL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600250834-8
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 6, 2011
Sequence Number: 
834
Case Number: 
Publication Date: 
October 3, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600250834-8.pdf113.91 KB
Body: 
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8 CLASSIFICATION RNSI?'RCT f3 RESTRICTED CENTRAL INTEL GENCE AGENCY REPORT INFORMATION FROM COUNTRY SUBJECT HOW PUBLISHED WHERE PUBLISHED DATE PUBLISHED LANGUAGE FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. This 0000RRRT l0RTUR1 Iarollmoll A?RCTUT1 TMl 1000001. OPOV11 TUl RRI7I0 1TAT11 UITIIIU till R10R100 01 4RF00001 :ACT ,0 R, 1. 0.. 1t 000 IS. T/ 051100*. IT1 TIARIR11110R 90 T0R R/YlhJ TlOtl OY ITl CVRT15T/ IN OUT 001111 TO 0R U00UTROR000 FI1100 L 000 l1RIri0 1. LATI. R1,0000'1T101 d, 'MIS MR IN 1WU01TI4:, DATE DIST.3 Oct 1949 NO, OF PAGES 2 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION WILL CONTROL viAf YIEVRL ON THE DRATA -- Tehnika Narodu, Jo 33, 17 A::g 49 A lags hydroelectric power plant is being built at Vuzenlaa of the Dravu. A section of the river 160 meters long add 65 meters wide has been walled off by means of a,concrete dam 12 meters high. The ground will have been prepared for the construction of concrete foundations by September 1949? Thsplsnt to expected to begin operations by the end of the Five-Tear Plan. When ready, it rill produce the sane amount of power as the Mariboreki Otok hydroelectric power plant, which VAe put into operation last year. A s stea of hyd_?oelectr1o avower plants will b7 built on the Drava from )aribor to Dravograd., and the Vuzenica power plant, which will have a receraoir of 19 million cubic meters of rater, will regulate the water supply to ail plants downstream and prevent significant changes in the water level. All the plants on the Drava will receive water and produce power steadily, regardless of fluctuations in the water level originating in Austria. BQSOTICAAT Li4TEIC M ft II ROV!D -- Barba, No 197, 20 Aug 49 Preliminary work on enlarging the existing equipment and installing new egniF- ment at the Subotioa thermoelectric power nlalrt is now taking place. At present, the plant uaanot supply its industrial consumers with sufficient power without the help of the 'bnta power plant. A new etean boiler, twice as large as the old one, will be installed. To supply water to the old and new boilers, a large new reservoir has been built. An experimental installation w'itb.moving chain grates has been finished. All controls are now concentrated on one panel. New air pipes have been added in order to increase the burning efficiency of the ftrrnace. As a result, a cheaper quality of coal can be used. STATE 14 NAVY NSRB DIESTRIBUTION ARMY AIR Fe I Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8 Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8 PMCLWM FROM OIL SALE -- Pclitika, No 13313, 11 Aug 49 On 1 Ike;, 1949 the first stream of crude petroleum gushed from the oil-shale- processing installation at Alekoinac. another and mach larger installation f01 processing oil shale 'will soon be built nearby. P141POMM'PSMUCTIONFAR A8EA'D -- sad, No 179, 29 Jul 49 iugoslAvia produced no petroleum until Just before the war, 'when a little capital construction was done and 1,000 tons of crude oil were produced. The Five-Year Plan provides for almost 30 ttmas more petroleum production in 1951 than in 19h6, .to be accomplished by doubling production every year. During the first half of 19' 9, three-quarters of the 1951 goal for petroleum RESTRICTED Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250834-8