ECONOMIC - FOUNDRY EQUIPMENT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600250922-0
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 6, 2011
Sequence Number: 
922
Case Number: 
Publication Date: 
October 6, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600250922-0.pdf116.91 KB
Body: 
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250922-0 CLASSIFICATION SsTRICTZCDPES RICTED INFORMATION FROM SUBJECT Yugoslavia Belgrade TN IS COCUICNT CONTHINf.INYORNATtlN AIIICTIN. TN[ NATIONAL OTYINII OF 1X1 ONiTIO STATII WITHIN TNI SIANIM. or IIYIOXAAI ACT $0 L: ?. E 'ANO'1?. A...OI0 ITS [i A.fN NSION YN[.RIY iLATION ANT .....I 10 AN UNAU[XOQIANC PARNON IP OY Ii? 00001 NIf It. NifIT4Q IT LA.. I[ONOOUCTION OF THIN FO.! ti fi0Xl SIT[0. SOURCE DATE DIST. 0 Oct 1949 NO. OF PAGES REPORT NO. THIS IS UNEVALUATED INFORMATION Ljubljrna -- The Litoatroj factory is equippod with cranes which art able to lift parts weighing 20 ions or more. A large new steal foundry In now being com- pleted there. :ie Litostroj factory ran produce the largest eatar turbines. .Ue lraagb assembly roam is divided into tHz a pshrto mat has no supporting rill.s:a. More are two large cupola furri+oes, esck able to produce 6 tons of iron assembly eocti= has two large installati'n pits, also calle3 cellar okam bers where turbines are assembled. The workers can resoh to turbt;:es through special passages which are built on the aide. The room is l40a eaougb to ountain two seven-story apartment hones. There aft two orenee, one'7lbove the other, which can oar.ry material to dll sections of the room. The processing eaption is both tm.a A 4ad'91ba" gioimd. The pert situated above ground has a turret lathe for processing trbine,stators, s M hire for processing heavy axles, and various other lathed and drills Next to them, there is an entire series of semifinished turbines: four Pelt= tu~Disee for the Baroion power plant (each blade can support a weight of 11 torsi), other turbines destined for l4ontene 'o and Iltadedonia, Francis turbines for Zenifla etc. There are also parts of large Up- lea to binea_ Nine e*tora far Kaplan turbine already have been cast. The entire factors is Rill of undergrouna passage ihioh furnish water, steam, electric power, and compressed air to the slabhiner7. Tba channels are so large that One can ride through them on a bicycle. All the instillations are easily accessible. Since povrr is obtained from below, a machine ea1t be installed in any 2 square meters ef.ihere in the processing section. The navy processing section is epeoially constructed sad o1 sicij of two large rooms, both built in two parts. Sach room has two cranes flat ned to ceiling beams NAVY AIR NSRB FBI -1- FrsT11cm l ESTRIGT DISTRIBUTION [~~ Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250922-0 -M=i Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250922-0 RESTRICTED which are unsupported by pillars. This represents a load of 70 tone at one y"a and was accomplished by the so-called suspended construction, which has been in- stalled in the roof. electric power plant near Vlasenica. Turbine blades, able to support a load of 43 kilograms per square milli-Ater and having minima expansibility, have been built Vlasenlca.plant: two turbine regulators, two globe vlatas, end two intake pipes. All this equipment was subjected topresaws:of30 etttospboree, while the greatest presaure at, tb- plant is: only 16 ataosphes. The turbines will antes 300 rev*luti ? TheLitoetroj factory Is to build 1,6O0 tons of hydraulic machinery by the and of 19.51:. RESTRICTED Sanitized Copy Approved for Release 2011/07/06: CIA-RDP80-00809A000600250922-0