NEW POWER EQUIPMENT INSTALLED; REPAIR TIME SHORTENED

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600260070-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 4, 2011
Sequence Number: 
70
Case Number: 
Publication Date: 
October 14, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600260070-5.pdf193.23 KB
Body: 
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5 CLASSIFICATION SECRET HOW PUBLISHED Daily newspapers DATE DIST./L/ Oct 1949 WHERE PUBLISHED USSR DATE PUBLISHED 26 Jul -- 11 Aug 1949 NO. OF PAGES SUPPLEMENT TO REPORT NO. 3 m1 COCVMIMT COMTAi1/ IUFOOATIOM Af:200M1 T.1 "now" Dino" Of TM1 MMIt1M /TLTU 1'ItOIM TM1 MMMIIIM Of MIV11M1I1 AVT 11 /. A. C.. 11 AMM Mt. A< 1011010. n1 TO.......... Al TWA 111MLAIlOM 1l ITS COMTIMIY IM AMT MAMMit 10 AM OMAMt*Ollf11 1MrsOI1 IB MO- M111110 MT LAY. 1MfMOOMOTIOM Of MOM FORM IM MOMIIITIO. THIS IS UNEVALUATED INFORMATION I?EW POWER EQUIPMENT Ii9GPALI D; REPAIR TIME sBORTSNBD STATE ARMY A new heavy-duty high-pressure turbine has been installed and is in operation in the Frunze Heat and Power Plant in Moscow. It was re-ported at a neet'.ng of the presidium of the Ieningred C' L:ot Committee of the Electrin Power Plant Workers' Trade Uniou that the boiler of the First ZS had been repaired in 10 days instead of 20, with a saving of 3,140 mnn-hours, and that the boiler of t::o Eighth CRS had been repaired in 15 deye instead of 35. Turbogenerator No 1 of the Stalinogorsk State Regional P',,rer Plant has been repaired in 4 days instead of the 6 days usually required. The ehor.ened repair rims permitted a saving of 120,000 rubles. LABOR SHORTAGE HITS POWER PLANE CONSTRUCTION -- Tikhookeanskaya Zvezda, No 186, 9 Aug 49 Construction of the Khabarovsk Heat and Power Plant in Stalinskiy Rayon of Khabarovsk was begun just before World War II and was renewed at the begin- ning of this year. The plant will eventually supply the entire poker sheds of the city. The plan for this year calls for improving the praseat temporary inwcallatione, construction of a garage, warehouses, adminletratton building and two houses; construction of the plant itself will begin in 1950. The city's enterprises have given considerable materials and transport facilities with the result that, in a short time, capital repairs were made on the machine and foundry shops, the drier and sawmill were reconrcructed, a:an a large housing area in the wcrkara' s'ttlament put in Rcdar. A railroad -jiding has bean laid up to the construction area in artier to bring in .aaterials. CLASSIFICATION NAW ` MSRD T AIR ~gy E SECRET D1f.rREIUTICN Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5 Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5 uwubera 200, which :L:: entirely insufficient for completion of this year's plan. There are very few experienced foremen and bricklayers. Khabarovsk enterprises, scheduled to send 500 workers to the project, have sent only 80, most of whom are inexperienced '.n construction work. The project also lacks sufficient ma- chinery, such as concrete mixers and conveyors, which should have been provided by the city's enterprises. The project has no telephone communications with the city, although it is 10 kilometers away. $KP'AUST STEAM USED FOR HEATING -- Iivostiya, No 177, 29 Jul 49 In the Ukraine before the war the utilization of waste heat from electric power plants was inaugurated. In Tul'chin, Vinnitse. Oblast, heat from a small 900-horsepower Diesel electric power plant was used to heat and supply hot water to various bbuildinge in the town. In all, 30,000-40,000?rubles were spent to lay the steam pipes and recovery boilers, and during the 1940-41 season more than 1,000 tons of coal were saved. Utilization of the Tul'chin electric power plant was raised from 28 to 76 percent. Similar projects were undertaken at the Chernigov and Beloteerkov electric power plants. For the development of small-scale heating, the production of recovery boilers was organized in the shops of the "Ulrkommunenergostroy" (Ukrainian Commmal Power Construction) Trust. However, the war put a stop to operations. Since the war, erc;all-.scale heating projects have been given to the "0rgkcamaunenergo" (Organization of oiimunal Power) Trust. According to the plan,district heating was to to employed in ten electric power plants, includ- ing plants in Moan', Cherkasey, P..khtyrka, Konctop, Proskurov, and Vinnitea in 1947. However, as yet, operations have been carried out in only three power ,-^}- r.,....,,... The a.iiioiiy ui Cowmuiei Economy uira,.nla*1 ti'JFt Is not exercising con- trol over projects. The "Orgkommunergo" Trust is also not taking the proper measures to implement the program. As formerly, much heat is wasted, and there ere excessive expenditures of fuel and funds. Most enterprises are heated b' expensive imported fuel, live steam, and even electric power. Heating boilcre and furnaces are being built stead of recovery bo-*lers, and evaporators and cooling basins have bean built to dispose of waste steam. In the Proskuro??.electric tower plant a se;oaid evap- orator is being built to cool water from mobile steam engines and Diesels, wheseae this water could be used for heating enterprises and living quarters. In the bast communal steam turbine electric power plants in the Ukraine, utilization is not more than 14 portent, end in the Dieool power plants, not ore t to x0 p::crnt. induatxlal Cu- ae;eu a:e utlilzea rrom :) to 77 percent. Thus, only a mall -,art of the fuel Is used to generate electric power, smelt steel, etc, and the greater part is lost in smoke, gat,, and water. KI>yV POi184 IIB II'UTng ANAOUYGES 4:F.r(NCIYS - . Pravda U!rainy, No 177, 29 Jul 49 The Institute of Heat Power Engineering of the Academy of Sciences Ukrainian S&I announces a ccmpet'.tion to fill the following vacancies; in the division of general problems of power Engineering -- senior scientific associate (doctor or candidate of teeLn.!tai eoienceF); in the industrial hest technology and fuel utilization laboratory -- twn doctors or cend;.,tates of sciences and one engineer; in the gas dynamics laboratory -- senior erientific associate (doctor or candidate of sciences); in the theoretical heat technology laboratory -- junior scientific associate (cmdidate of techn;.cel ;'CieLC..a X. without a aegree . Apply: Kiev, ulitea Chialova, 5j-6, Institute of Heat Power Nagineering.-- 50X1-HUM Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5 Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5 aaKUALTh POWER INal L ATION RKJCRtJT2S TABOR -- Tikhookea nakava ?va,.A. _ Nn IAA ii x.._ r,,, The 'Tal'neft'" (Far ]Cast Petroleum) Associati^n needs the foil" for work on the power train in the city of Okha on Sakhalin; safety eng;nm' chief of the boiler shop, chief of the electric shop, chief of the c emioal shop, senior forexan in the repair shop, senior account technician, phift electricians, control panel attendant, turbine machinist, repair zta1iianics, senior stokers, assistant stokers of steam boilers. Workers will be granted the usual Far North privileges. Apply: Personnel Department, 3rabarcvek, na.itea imeni Gggolya, 28. -- Advertisement 50X1-HUM Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000600260070-5