ELECTRICAL INDUSTRY OUTPUT UP; NEW METHODS SAVE METHOD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600270316-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 15, 2011
Sequence Number: 
316
Case Number: 
Publication Date: 
December 9, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600270316-1.pdf190.74 KB
Body: 
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1 COUNTRY SUBJECT NOW PUBLISHED WHERE PUBLISHED DATE PUBLISHED LANGUAGE M''?fECYET REPORT CD NO. CENTRAL INTELLIGENCE AG INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS Economic - Electrical Industry Daily newspapers USSR 4 Sep - 1 Oct 1949 DATE OF INFORMATION 1949 DATE DIST. q Dec 1949 NO. OF PAGES 3 SUPPLEMENT TO REPORT NO. toll OOCOYtNT CONTMNI II,OIIATION AFFIMR. Of "11194" 111`1 It or Tot OMTII 8TATO HTMN VII OONIN or Ur100AII ACT i0 r. J. t.. sl AN/ II. At ANONI11. III TYANINIIMOO O01Nt IITILAnoR Of ITt CONTIOTI IN ANT NANNtr To Al INAITN04II0 ItnAN It IIO. MNTCI IT IAN. ttrt000tnON or t*ii wlIO II IIOIIIITII. New"pers as indicated. ELR'CTRICAL IIWSTBY OUTPUT IIP ? NEW mmm SAVE, 1110.111. :;6PORTS HICK OUTPUT -- Sovetskaya Moldaviya, No 188, 18 Sep 49 Electrical enterprises in Stalinekiy Ryon, City of Moscow, have produced millions of light bulbs and tens of thousands of kilowatt-hours of transformers over plan for the past 7 months. ELECTRODE PLAIT MEETS PLAN -- Vechernyaya Moskva, No 223, 19 Sep 49 The "Metallopy^.stuns e" Plant of the Local Industry Trust and the Metal Electrode Plant in Salininekiy Rayon, City of Moscow, have completed their 1949 plane for release of working capital to the state. SCIENCE, PLANTS COOPERATE -- Pravda, No 262, 19 Sep 49 Armenian scientists are increasing aid to Industrial enterprises. Associates of the Institute of Chemistry of the Academy of Sciences, Armenian 80, in co- operation with the Electric Bulb Plant, have solved the problem of using local rather than imported raw materials. The Eleotroteohnical laboratory of the, Academy of Sciences of Armenia, together with designers and technologists of the Electric 'leasuring Instruments Plant, are now working on a new electrical system far homes. Associates of the institute have recently developed an experimental. machine tool for working `wsalt . MANS GENERATORS FOR IPLEHOZES -- Scmmnist, No 217, 14 Sep 49 Trs Yerevan Machine-Buildi;sg Plant of the Ministry of Local Industry Armenian SSR to ready to beg production of a 25-kilowatt generator. The first 200 unite will pe sentlout for the electrification of kblkhozes and in- cubator stations. - 1 _ r CLASSIFICATION S CRET STAVE NAW NsRe DISTRIBUTION Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1 Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1 SECRET The Yerevan Machine-Building Plant of the Ministry of Local Industry (formerly the Agricultural Equipment Plant), which hoe been in existence only 3 years, has became one of the largest industrial enterprises in the republic. It now produces electrical he.ehinery, including generators. By the sad of 1949, it will be ready to turn out Diesel motors. It bas completed the Five-Year Plan in 3j years. Much remains to be done, however. The technical leader& hare failed to give proper eon_ideration to suggestions for rationalization offered by the plant?e workers. They have also neglected to give serious attenticL to economical utilization of nonferrous metals, Increase of labor prodnetivity, installation of floor circuit outlets, mechanization of lacquering generator stator plates, and many other proposals. RESTORE ESTONIAN PLANTS -- lrsniy Flot, ffio 224, 22 Sep 49 The "Baltic Manufacture" Combine has been restored., and the output of the "Volta" Plant. has increased 13 times. Both are in Tallin. Erasnaya Zvezda, Noi 224, 22 Sep 49 The "Volta" Plant makes heavy electric machinery. SAVES METAL, RUBLES -- Sovetelmya Lstviya, No 222, 20 Sep 49 The "Spoke" Electric Machine-Building Plant, Rilya, has simplified the manufacture of electric sockets. This saved 580 kilograms in press scrape, from which 24,000 additional sockets were made, saving 15,000 rubles. AnotLar uow ma the no. o i tae Y 7 1o.-t 1191 000 rm bZie . PROWCTION WELL ORGANIZED IN MOTOR PIARP -- Moskovskiy Bol'ohevik, No 225, 23 Sep 49 The Plant imeni Vladimir I1'ich bas pledged to carry out this year's norm for the output of electric motors by 7 Noveeaber, thereby completing the Five-Tear Plan in 4 years. At present, the plant Is engaged in the production of three types of high- voltage electric motors. The regularity with which the plant is operating is Indicative of its successes. All the shops release their products In accordance with a strict 10-day schedule. The plant has also made it a rule that not lose than 4 per- cent of the monthly plan be completed daily. " __ _~ ~wnP~n?.m.~w~n "" - 1-u the mvtvY'-`v ui iaiii~y abuvo??y, I.= vw.c jwr.-s far the matore and the other for assemblying the oil-rheostat starters -- are under ai n the shop .. ..w..~ ..-~? construction, in auditiua+ to the aneoruy c....a~ar 1 Within the last 2 months, more than 200 valuable suggestions for rationali- zation have been implemented, which has shortened the production cycle in sass, unite. The machine builders have pledged to increase the productivity of every metal-cutting tool by 25 percent, and this pledge is being carried out. Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1 9 Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1 SECRET speeded up through the use of a compound die, which replaces three separate dies formerly used in the process. As a result, the production of platen has risen from 900 to 1,700 per shift. The plant, had also become a picleer in the chill casting of rotors, re-' ducing the amount of rejects seven and eightfold. Ingenuity in devising speed-up methods is especially'notable in the motor-building shop, where the Five-Year Plan was completed in February. Since then. the output of electric motors in this shop has increased another 28-30 percent. OIL, COAL INBUSTRY TO PAT NEW MOTORS Vecher?yaya Moskva, No 234, 1 Oct 49 The Plant imeni Vladimir Il ioh has put out the first size-13, 24O-kilo- watt electric motor and has pledged the completion of 20 more by 7 November. Coal mines and oil fields will use the motors to run ocapressors, pumps, and various other equigaumt. In one year the plant has produced 800 motors over plan, ocmprieing 20 types. BULB PLANT H &S EXCESS OUTPUT -- Veohernyaya Moskava, No 234, 1 Oct 49 The special bulb shop of the Electric Bulb Plant has produced 550,000 bulbs above the figure set for September. It has released 1,500,000 rubles to the state, and, since the start of 1948,: has released 9 million rubles in working capital. P 0 ,u COiarvuw CABLE -- bioskovskiy Bol' ehevik, No 229, 28 Sep 49 The Podol'ek Cable Plant (director, Farber) fulfilled its Five-Yeas,... Plan for volume of production on 28 September. Gross output was 2.7 times greater than in 1946. Mass production of compound cables and wires for tele- phones, mines, and power transmission is under way. In the first half year 2,430,000 rubles in working capital were re- leased as against the planned amount for the entire year of one million rubles. RADIOS ASSEKUE[) ON CONVIM LINK -- Sovetskaya Belorossiya, No 193, 28 Sep 49 The assembly shop of the Radio Plant imeni Molotov is now producting on a conveyer line basis. IRW GEItNATORS GO TO PONER.STATIONS -- Leningradslmya Pravda, No 232, 1 Oct 49 The 3lektrosila Plant imeni S. N. Kirov has oagsleted two new-type hydro- generators, and has already shipped part3 of them to electric power stations. The lover crosspieces, weighing 70 tone, were machined on a vertical lathe In 6 days; under old methods this took 10-12 days. -END 3 SWEET Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270316-1