IMPROVE VACUUM TUBE PRODUCTION; SAVE LEAD, RUBBER, ALUMINUM, BRASS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600270434-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
September 19, 2011
Sequence Number:
434
Case Number:
Publication Date:
December 15, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 166.6 KB |
Body:
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0
CLASSIFICATION MRET EC EI
CENTRAL INTELLIGENCE AGENCY
INFORMATION FROM
COUNTRY USSR
LANGUAGE
SI;dJECT Economic; Technological. - Electrical industry
HOw
PUBLISHED Daily newspapers; Semimonthly periodical
WHERE
PUBLISHED Ue$R
DATE
PUBLISHED 1 Aug 13 Oct 1949
Y ONIT{D /TAT%1010011 ATI I 0000 N0 u 0! f ulPICNI.O{ DUMB
TR 00
' O 1
I. 0. C.. 11 AID 10.A1 A1111010. ITf TRAN3I11tl0N OR TN{ R{Y{LATION
O! ITf COATIN IR ANT A.... TO AN RAOTWOAIZ^O I8 I.O
T1
1111}lb 1'/ f V. . A{IRODUCT50N 01 1- 1- If 1... 1{I11040
CD NO.
DATE OF
INFORMATION 1949
DATE DIST. /5' Dec 1949
NO. OF PAGES 3
SUPPLEMENT TO
REPORT Nn.
SOURCE Newspapers and periodicals as indicated.
IMPROVE VACUUM TUBE PRODUCTION;
SAVE LEAD, R1BER, ALUl4INLM, BRASS
1=03NIZE VMUUM TUBE, BULB PRODUCTION -- V Pmoshoh' F24K, No 16, Aug 49
The Svetlana Plant in Leningrad has achieved its prewar level of production,
although it has 40 percent fewer personnel than it did in 1940.? Rejects at the
plant have been out 15 percent. Automatic. machine transfer lines for the manu-
facture of light bulbs are now being set up, the spraying of radio vacuum tubes
has been mechanized, and glass elements are now processed entirely by machine.
.)[any shops have been renovated.
Trade union committees have been particularly active in the galvanizing and
metal vacuum tube shops. The committees have speeded up production and improved
working conditions.
NEW MACHINE ATTRACTS WILJ$ INTEREST -- Pravda Ularainy, No 235, 5 Oct 49
The electric-spark unit for plating cutting edges of tools and dies with
hard alloy is in great demand in enterprises of Leningrad and other cities.
Made by the "Elektroeila" Plant, the unit is eagerly studied almost daily
by representatives from Sverdlovsk, %har'kov, Latvia, and Estonia, and by chief
engtfters from many power p..ai.is.
BOOST PRODUCTIVITY OF NIGHT SHIFT -- Pravda Ukrainy, No 22'j, 25 Sep 49
It was noted that labor productivity at the "Elektroinetrument" Plant was
considerably lower during the night shift than during the day shift. Lack of
foremen at same of the shops proved to be the cause. When this fault was
corrected, labor productivity increased 28.4 percent.
- 1 -
CLASSIFICATION arrrulnr
ARMY AIR 1 X ,FBI
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0
Th= "?r.lci troin:ltru o* t" ?'_cm cc---,' ct-d th, FI^c /F:r,v. P'_er in 3 Ye"o, 7
months, and 10 days. It has contributed over 1,500,000 rubles In above-plan
the planned 7.6 percent.
in a yeas.
At present it is supplying Industrial enterprises and builders with electric
hammers of rotary and percussion action, electric shears which out up to 3-
SAVES LEAD, RLiBA&R -- Moekovekiy Somscmolets, No 121, 4 Oct 49
During the current Five-Year Plan the Podol'sk Cable Plan+ has saved over
8,000 tone of lead, 2,000 tons of rubber, and during 1949 has released over one
The assembly shop of the Electric Lighting Equipment Plant, Yerevan, has
increased its output three times over the July figure, and 95 percent of the
products are of perfect quality, as compare? to a former 80-85 percent.
A new stamp has been installed for making bulb bases of iron, rather than
of aluminum and brass, as was done formerly. It turns out 300 bulb bases in
the time it took the old stamp to complete 100.
MORE PLANTS COMPLETE 8-MONTH, FIVE-YEAR PLUS -- Moekovekiy Somsomolets, No 122
6 Oct 49
On 28 September the Podol'ek Cable Plant fulfilled its Five-Year Plan in
3 years, 9 months.
Pravda Vostoka, No 197, 5 Oct 49
The Eokand Electric Machinery Plant has completed planned production for
the last 8 months 106.6 percent, made nearly 900,000 rubles' profit above plan,
and rnleaeed 692,000 rubles in working capital.
%mmunist, No 233, 2 Oct 49
The Yerevan Cable Plant's electric wire shop met its 8-month plan 120 per-
cent. Labor productivity in the plant at a whole has risen 5.3 percent; cost of
production is down 6.5 percent. Completion of the annual production plan 1s
pledged by 7 November,
- 2 -
SECRET EEET
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0
NAM PRODUCTS OF RIGA PLANT -- Sovetskaya Iatviya, No 242, 13 Oct 49
universal dispatching installations, manual and dial city telephone centrals of
large capacity, and intercity centrals.
The "Remmnalenergo" (Reiublic Office for Repair and Maintenance of Power
Nquippent) has pledged to carry out a number of measrres which would aid rural
eleotrificati,fn of the Belorussian SSR. Two hundred electric motors, 20 electric
generators, 1,000 single-phase electric meters, 200 three-phase electric meters,
200 electric measuring instruments, and many other items will undergo capital
repair. In addition, ten experimental power installations will be built at
rural electric stations.
TO SUPPLY GBN BATORS TO MTS -- Sovetskaya Moldaviya, No 185, 14 Sep 49
The Machinery Plant imeni 25 Godovshchina Fszakhetana is ready for caries
production of electric generating unite for MT S, lnrlndina a 30-kilowatt
generator and distributor.
- 3 -
SECRBT
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP80-00809A000600270434-0