RAILROADS TO BEGIN WINTER SCHEDULE; REPORT PROGRESS WITH PLANS, CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600290386-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 28, 2011
Sequence Number: 
386
Case Number: 
Publication Date: 
March 9, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600290386-2.pdf123.51 KB
Body: 
Sanitized Copy Approved for Release 2011/09/28: CIA-RDP80-00809A000600290386-2 SECREr CENTRAL INTELLIGENCE AGENCY REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. SUBJECT HOW PUBLISHED WHERE PUBLISHED DATE PUBLISHEC LANGUAGE DATE OF INF(1R MATI(1N ,nLn ,nrn -__-r..-...,....... - a,aiu uuauo Daily nevapapers USSR 15 ftov 1949 - 7 Tan 1950 rxn oacunxr caxdm uroro?nox uncnxe rxr ~?noxu orrun or rxr u nrn ~nxn rxr ?uxixe or urmwr ?a re r. r c xn n. ?o uuore m nuuun~ . o. rxr mrunox or m 6o'.nxn n ? uno r no uuno n u~. nnoeuinoi or ixn con ~r nox~nno u DATE DIST. 9 Mar 1950 N0. OF PAGES 3 SUPPLE~dENT TO REPORT NU. RAILROADS TO BSGIA WIIPISR SCHEilULR; REPORT PROGRESS WITR PLAftS. COASTRUCTIOA SCHEDULE EFFECTIVE 29 ftOVEMBER -- Gudok, Ao 143, 27 Aov 49 The winter schedule for train traffic will go into effect oa the fJ88R rail- road network on the night of 29 November. During the winter months many rail- road systems will keep the operating indexes used during the summer months, a practice initiated in 1948, and on some systems the winter operating norms viii be higher than those established by the summer schedule. The weight of ell south-bound trains on the Turkestan-Siberian Railroad System has been increased by 900 tone. Traffic. will be increased by several pairs of trains per day on the Balashov route between the Donets Basin and the Volga area. The winter schedule calla for an Sncrease on the network as s whole of average speed including stops, aversge speed excluding stops, and the level of freight handling, in comparison not only xith the corresponding period of last year but also with the summer schedule. To Insure the effective implementation of the winter program, the state has given the railroad systems large amounts of additional equipment, in- cluding rails, crushed atone ballast, and sex locomotives. Advanced methods for handling trains and Por station operations x111 be used. MOSCOW RR CERTER TO EXPAND ELECTRIC RUAS -- Moskovskiy Bolshevik, fto 308, 31 Deg 49 Electric train traffic will be opened on the Moscow-Vnukovo section of the Moscow-Kiev Railroad System and on the Moscow-Kryukovo section of the October Railroad System. These will be the first electrified sections of these railroad systems. On the Western Railroad System it is planned to complete the construc- tion of the Goliteyno-Zvenigorod section. Ci ecclrlrenOn; (STATE I~NAVY NSRB T (ARMY AIR F61 sECR~r Sanitized Copy Approved for Release 2011/09/28: CIA-RDP80-00809A000600290386-2 Sanitized Copy Approved for Release 2011/09/28: CIA-RDP80-00809A000600290386-2 SEC~E? It is planned to increase the speed of electric trains, In addition, nine- car trains xill replace the six-car trains used formerly. A large amount of work is planned for the f1u'ther automatization of traction substations and for the introduction of control by telecommunications. REF/ ELECTRIFICATION U1?ER WAY IN LATVIA -- Sovetskaya Latviya, No 6, T Jan 50 Workers of transport enterprises of Latvian SSR have pledged in a letter to Stalin to complete the 1950 year plan for the construction of the Riga- Kemeri electrified railroad line sad to put electric trains into operation on the Riga coast by 5 August 1950. TASffiSENT SYSTEM COMPLETES YEAR CARLOADING PLAN - Pravda Voatoka, No 255, 28 Dec 49 The Tashkent Railroad System completed the 1949 carloadiag plan 100.2 percent on 27 December, The carloading plan for most oP the mayor types oY freight vas exceeded, with the plan for petroleum produ~cs being completed 104.4 percent, ferrous metals 145.7 percent, Poreat troducta 123.4 percent, rev cot- ton, 120.8 percent, and cotton seeds 108.6 percent. The year plan for unloading was completed 102.9 percent. KIROV SYSTEM COMPLETES YEAR PLAN __ Leninskoye Zna~ya, No 1, 1 Jau 50 The Kirov Railroad System completed the 1$49 plan for loading 108.1 per- cent sad the plan for unloading 107.2 percent. NCW STATION FOR MOSCOW-RYAZAlP' SYSTEM -- Vechernyays Moskva, Na 307, 29 Dec 49 A new railroad station, called Elektrozavodekaya, has been built in Stalinekiy Rayon oP Moscow City for the Mnacow-ayaz~, Rail ~^ station is located not far from the vestibule of the "Slektrozavodekaya" sub- way station. The new station has s 220-meter stone platform with metal lamp- poats. The new station will permit workers living outside the city and working in enterprises of 3talinskiy and Pervomayslci