NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

TEMPERS TOOLS BY NEW SUPER-COLD PROCESS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600310154-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 12, 2011
Sequence Number: 
154
Case Number: 
Publication Date: 
May 10, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600310154-6.pdf106.92 KB
Body: 
Sanitized Copy Approved for Release 2011/08/17: CIA-RDP80-00809A000600310154-6 SUBJECT HOW PUBLISHED WHERE PUBLISHED DATE PUBLISHED LANGUAGE COUNTRY USSR; Poland DATE OF CLASSIFICATION SE CENTRAL INTEU.IGENCE AGENCY REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. Economic; Technological - Machine tools Daily newspapers USSR; Warsaw 17 Nov 1949 - 17 Mar 1950 TN I5 DOCUMENT CONTAINS INPORY ATION AFFECTING THE NATIONAL DEFENSE OF THE UNITED STATES WITHIN THE MEANING OF ESPIONAGE ACT IT U. 5 C . 31 ANO SE. AS AMENDED. ITS TRANSMISSION OR THE REVELATION OF ITS CONTENTS IN ANY MANNER TO AN UM AUTHORIZED PERSON IS PRO. NIDITED DY LAW REPRODUCTION OF THIS FORM IS PRONIDITEO. INFORMATION 1949 - 1950 DATE DIST. /0 May 1950 NO. OF PAGES 2 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION TEMPERS TOOLS BY NEW SUPER-COLD PROCESS PROCESS USED ON 30 TYPES OF TOOLS -- Moskovskiy Bol'shevik, No 270, 17 Nov 49 The Borets Plant is now tempering tools by a new super-cold process in which the tool is subjected to a temperature of minus 85-100 degrees centi- grade. The teeth of a Heller saw treated in this manner last four times as long as previously. High-speed turret-lathe cutting tools likewise last much longer. At present, 30 different types of tools are being tempered by super- cold. HIGH-FREQUENCY UNIT LOWERS COSTS -- Kommunist, No 12, 14 Jan 50 During 1949 the Yerevan Machine-Tool Building Plant imeni Dzerzhinskiy raised the productivity of labor 10.5 percent. A high-frequency surface- tempering unit has cut down expenditure of electricity, raised the quality of tempered parts, and reduced their production cost. NEW TYPE WOODWORKING MACHINE -- Warsaw Zwiazkowiec, No 8, 19 Feb 50 A new type woodworking machine has been designed in the USSR, by B. Nechunaev, a cabinetmaker. This machine takes the place of ten special ma- chincs which up to now were used for various woodworking jobs. The ma- chine's output is almost twice that of the most modern US-made woodworking machine. BOASTS DOUBLED PRODUCTIVITY -- Trud, No 66, 17 Mar 50 The conversion from individual Stakhanovite work to Stakhanovite sec- tions, shops, and enterprises is an important step in increasing production. With the same equipment and the same number of workers at the Kalibr Plant, production increased 2.6 times and labor productivity incressed 2.3 times in comparison with 1940. Sanitized Copy Approved for Release 2011/08/17: CIA-RDP80-00809A000600310154-6 Sanitized Copy Approved for Release 2011/08/17: CIA-RDP80-00809A000600310154-6 PLANT PROMISES NEW PRODUCTS -- Zarya Vostoka, No 8, 12 Jan 50 During the first qua--ter of 1950 the Tbilisi Machine-Tool Building Plant NEW HIGF-PRODUCTION MILLING MACHIN1S --- Kommunist, No 64, 15 Mar 50 Engineers at the Gor'kiy Milling Machine Plant have developed and put into production a group of high-production bracket and heavy milling ma- chines. The cortrols have been mechanized and made automatic to the utmost, permitting one opez,ator to service several machines at the same time. The designers of these machines have been awarded the Stalin Prize. The Moscow Automobile Plant imeni Stalin is installing two production lines for making gear wheels for two-spindle high-duty tooth-milling machines which the plant manufactes. Centralized sharpening of hard alloy-cutting tools still has not been organized at the Riga VHF, REZ, Stars, and Turbine Machinery Plants. Riga enterprises are also backva_rd in seeing to the accurate grading and marking of cutting tools. BEARINGS PLANT FULFILLS PLEDGE -- Moskovskaya Pravda, No 18, 11 Mar 50 The Moscow Second Bearings Plant fulfilled its Election Day pledge ahead of schedule. Several thousand bearings were manufactured above plan. Sanitized Copy Approved for Release 2011/08/17: CIA-RDP80-00809A000600310154-6