SPEEDING UP SHAFT SINKING IN THE USSR WITH BCH LOADER

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600350138-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 22, 2011
Sequence Number: 
138
Case Number: 
Publication Date: 
October 3, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600350138-0.pdf88.29 KB
Body: 
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0 I CLASSIFICATION CORFIDhRrIAL DDNF~pENT1A! CENTRAL INTELLIGENCE AGENCY REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD N0. COUNTRY., USSR SUBJECT Psconomic - Coal mining HOW PUBLISHED Monthly periodical WHERE PUBLISHED Moscow DATE PUBLISHED Ju11950 LANGUAGE Russian TN13 OOCUY[MT CONTAIN! IN SO RY ATION A,/[CTINL TN[ NATIONAL D[lt NSL Oi TN[ UMIT[D STAT[S MITNIN TNL Y[A MINO 01 [l IIO NAO[ ACT LO Y. S. C.. l1 AND )[. A! AY[NDLO. ITf TRANSN Il SION OR TNL RSV ILAYION Oi Il5 COMT[NTS IN ANT NAN N[R TO AN URAVTNO RIf[D IIRSON If IRO? NI SIT[D LT LAW. R[IRDDY OTIDM 01 TNIE I0.^.R If PRO XILIT[D. Ugol', No 7, 1950. DATE OF INFORMATION 1950 DATE DIST. ~ Oct 1950 NO. OF PAGES 2 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION SPEEDING UP SHAFT SINKING IN THE USSR WITH THE BCh LOADER Since in sinking vertical mine shafts, 60 to 65 percent of the time in- volved is taken up in loading the blasted rock, the mechan'.zation of this process will grentlp epc@d iay Wine sir: iag. At present the use of the BCh-1 loader is being more and more widely adopted in sinking vertical shafts. Either one or two machines m0.Y be used, depending on the size of the section. The best results obtained from the use of one BCh-1 loader were achieved in "Tsentral'no-Zavodskaya" Mine (Donbass), "Prole?+.arskaya-Glubokaya" Mine (Donbass), and Mine No 35 of the Maykudukskiy URSh (Karaganda). In the Pirst case, 40 to 4? meters of completed mine shaft were finished in a month; in the second case, 3t~ meters; in the third case, meters. The best results obtained frost using two machines war.; achieved in? Mine Ro 10 of the Stalinshakhtovosstanovleniye Trust and "Mushketovskaya- Vertikal'naya".l+line (Donbass). In the former case, 42 meters of completed mine shaft were finished in s month, and in the latter case, 30 to 32 meters. The following table indicated time copsumed in the actual operation of the loader: Rama of Mine :..Ave~atze Time. Consumption iiui(z)'_ __ Loath Zock nto Bucket Awaiting ?rrival of with BCh=1 Bucket and Removing Machine - Chain _.~--- 3.4 Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0 Mine Ro 10-bis, Stalinshakhto- vosatanovleniye (Donbass) "Mushketovskaya-Vertikal'nays" Mine; Stalinshakhtostroy Trust (Donbass) "Tsentral'no-Zavodskaya" Mine, Stalinshakhtovosatanovleniye Trust (Donbass) Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0 l CONFI~ENTI ~L Time consumption varied according to the size ~f the bucket used to receive the rock scooped up by the BCh-1 loadex?. These variations are indidated in the following table: ' Bucket capacity (cu m} Loading rock into bucket by BCh~l unchiue Awaiting arrival cf bucket and removing chain Loading rock into bucket by hand 1.0 1.20 1.~0 ~ 2.~ 3.47 4,i6 ' 5.2 ' 6.07. 0 6.95 2.9 6.37 2.21 6.37 1.17 6.37 .30 6.37 - 6.95 9.5 .1.4 14.3 16.6 19.0 CONf~~ENTI~~'`~ ___ ~.~ .. Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0