SPEEDING UP SHAFT SINKING IN THE USSR WITH BCH LOADER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600350138-0
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
August 22, 2011
Sequence Number:
138
Case Number:
Publication Date:
October 3, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 88.29 KB |
Body:
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0
I
CLASSIFICATION CORFIDhRrIAL DDNF~pENT1A!
CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS CD N0.
COUNTRY., USSR
SUBJECT Psconomic - Coal mining
HOW
PUBLISHED Monthly periodical
WHERE
PUBLISHED Moscow
DATE
PUBLISHED Ju11950
LANGUAGE Russian
TN13 OOCUY[MT CONTAIN! IN SO RY ATION A,/[CTINL TN[ NATIONAL D[lt NSL
Oi TN[ UMIT[D STAT[S MITNIN TNL Y[A MINO 01 [l IIO NAO[ ACT LO
Y. S. C.. l1 AND )[. A! AY[NDLO. ITf TRANSN Il SION OR TNL RSV ILAYION
Oi Il5 COMT[NTS IN ANT NAN N[R TO AN URAVTNO RIf[D IIRSON If IRO?
NI SIT[D LT LAW. R[IRDDY OTIDM 01 TNIE I0.^.R If PRO XILIT[D.
Ugol', No 7, 1950.
DATE OF
INFORMATION 1950
DATE DIST. ~ Oct 1950
NO. OF PAGES 2
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
SPEEDING UP SHAFT SINKING IN THE USSR WITH THE BCh LOADER
Since in sinking vertical mine shafts, 60 to 65 percent of the time in-
volved is taken up in loading the blasted rock, the mechan'.zation of this
process will grentlp epc@d iay Wine sir: iag.
At present the use of the BCh-1 loader is being more and more widely
adopted in sinking vertical shafts. Either one or two machines m0.Y be used,
depending on the size of the section. The best results obtained from the use
of one BCh-1 loader were achieved in "Tsentral'no-Zavodskaya" Mine (Donbass),
"Prole?+.arskaya-Glubokaya" Mine (Donbass), and Mine No 35 of the Maykudukskiy
URSh (Karaganda). In the Pirst case, 40 to 4? meters of completed mine shaft
were finished in a month; in the second case, 3t~ meters; in the third case,
meters. The best results obtained frost using two machines war.; achieved in?
Mine Ro 10 of the Stalinshakhtovosstanovleniye Trust and "Mushketovskaya-
Vertikal'naya".l+line (Donbass). In the former case, 42 meters of completed mine
shaft were finished in s month, and in the latter case, 30 to 32 meters.
The following table indicated time copsumed in the actual operation of the
loader:
Rama of Mine :..Ave~atze Time. Consumption iiui(z)'_ __
Loath Zock
nto Bucket Awaiting ?rrival of
with BCh=1 Bucket and Removing
Machine - Chain
_.~---
3.4
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0
Mine Ro 10-bis, Stalinshakhto-
vosatanovleniye (Donbass)
"Mushketovskaya-Vertikal'nays"
Mine; Stalinshakhtostroy Trust
(Donbass)
"Tsentral'no-Zavodskaya" Mine,
Stalinshakhtovosatanovleniye
Trust (Donbass)
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0
l
CONFI~ENTI ~L
Time consumption varied according to the size ~f the bucket used to receive
the rock scooped up by the BCh-1 loadex?. These variations are indidated in the
following table: '
Bucket capacity (cu m}
Loading rock into bucket by
BCh~l unchiue
Awaiting arrival cf bucket and
removing chain
Loading rock into bucket
by hand
1.0
1.20
1.~0
~
2.~
3.47
4,i6
'
5.2
'
6.07.
0
6.95
2.9
6.37
2.21
6.37
1.17
6.37
.30
6.37
-
6.95
9.5
.1.4
14.3
16.6
19.0
CONf~~ENTI~~'`~
___
~.~ ..
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600350138-0