UNIVERSAL TELPHERS, GANTRY CRANES AMONG NEW PRODUCTS OF HOIST-TRANSPORT INDUSTRY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600360135-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 22, 2011
Sequence Number: 
135
Case Number: 
Publication Date: 
November 9, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600360135-2.pdf134.84 KB
Body: 
Sanitized Copy Approved for Release 2011/07/22 : CIA-RDP80-00809A000600360135-2 CLASSIFICATION SECRET ~F~ET CENTRAL INTELLIGENCE AGENCY REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. SUBJECT HOW PUBLISHED WHERE PUBLISHED' DATE PUBLISHED LANGUAGE Economic; Technological - Lift and transport machinery DATE OF INFORMATION 1950 Daily newspapers; monthly periodical DATE DIST. ~ Nov 1950 SUPPLEMENT TO REPORT NO. THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE OF THE UNITED STATES WITHIN THE MEANING OF ESPIONAGE ACT 50 U. S. C.. EI AND SEAS AMENDED. ITS TRANSMISSION OR THE REVELATION OF ITS CONTENTS IN ANY MANNER TO AN UNAUTHORIEEO PERSON IS PRO- M IEITED ST LAW. REPRODUCTION OF THIS FORM IS PROHIBITED. OF HOIST-TRANSPORT INDUSTRY RCfET eEC.REr 01 The Leningrad Hoist- and Transport-Equipment Plant has launched series production of a new gantry crane 45 meters high weighing 120 tons. It is de- signed for loading operations in ports. NEW CRANE MODELS COMPETE BEFORE GOING INTO PRODUCTION -- Vechernyaya Moskva, 2 Aug 50 Experimental models of new cranes are being tested at the All-Union Ex- hibition of Construction Equipment. Participating in the exhibition are tower cranes of 0.5-5 tons lifting capacity, the Pioner 5-ton railroad crane, and a crane-excavator designed for digging ditches and canals. On the basis of per- formance, the best models will be assigned to plants for series production. The Kuybyshev Machinery Plant has begun production of a new tower crane which will be used in construction of high buildings in Leningrad, Moscow, and other cities. The crane has a 33-meter tower, and is 45 meters high with the boom raised. It can lift a weight of 3 tons to a height of 42 meters, making it possible to furnish building materials to a height of 11 stories. The crane weighs 42 tons. With the aid of a special mechanism, the entire crane can move, while its boom sweeps freely about the tower. BUILD NEW LOADER -- Tallin, Sovetskaya Estoniya, 10 Jun 50 The Kherson Port-Equipment Plant imeni Shmidt has built a new loading ma- chine, the UPM-3. It will perform the work of 30 men. Sanitized Copy Approved for Release 2011/07/22 : CIA-RDP80-00809A000600360135-2 Sanitized Copy Approved for Release 2011/07/22 : CIA-RDP80-00809A000600360135-2 I AUTO PLANT MAKES LOADER Yerevan, Kommun- 16 Jun 50 The Minsk Plant of the Ministry of the Automobile and Tractor Industry has begun series production of 3-ton loading machines, powered by GAZ-61 motors. SECRET ~FRRET NEW PORTABLE LOADER LIGHTER THAN OLDER MODELS .4oscow, Mekhanizatsiya Stroitel?- stva, Aug 50 In May 1950, the Dnepropetrovsk Construction-Machinery Plant began series production of the T-125 portable belt loading machine, designed by the All-Union Institute for Construction- and Road-Machine Building.. Built largely from stand- ard units of the older T-80 conveyer, the T-125 is 50 percent lighter than port- able belt -loaders of the older type. The conveyer is 5,780 millimeters long, 610 millimeters wide, and weighs 220 kilograms It is powered by a one-kilowatt electric motor, which moves the belt at 08 meter per second. On tests, it moved 118 tons of goods in one hour on the horizontal, and moved 81 tons per hour when raised to a 24-degree angle The belt is of seamless construction, and should last well. This is impor- tant, as the belt is the costliest and hardest to replace of all parts of a con- veyer. The designers are going to work on the problem of replacing the present metal rollers of the T-125 with plastic ones; this should reduce the weight of the machine another 10 kilograms. TEST HIGH-SPEED ELEVATOR - Vechernyaya Moskva, 16 Jun 50 The. Moscow Pod'yemnik Plant has completed tests on the first model of a high- speed elevator. It can rise 20 floors in 25 seconds, attaining a speed of 3.5 meters per second. The plant will put out 32 of these elevators this year. Participating in the development of the elevator were the Stal?most Plant, the Krasnyy Blok Plant, the Perovo Machine-Building Plant, Furniture Factory No 3, the All-Union Scientific Research Institute for L;ft and Transport Ma- chinery, and other enterprises. The Krasnyy Metallist Plant is now producing adjustable telphers which are capable of holding containers of varying sizes. They are of simpler construction than the old, fixed-size models, and require less metal in their manufacture. They are easily operated, and. can carry loads up to 2 tons. These new telphers are now being used in coal mines, metallurgical plantL, and in the petroleum industry. The Krasnyy Metallist Plant h..s produced 27 electric telphers in excess-of the July plan. i:LACES WINCHES -- Alma-Ata, Kazakhstanskaya Pravda, 13 Aug 50 The assembly shop of the Alias-Ata Heavy-Machine Building Plant is -xceediug its plan, and has begun production of new machines, including heavy power winches. SECRET SECRET Sanitized Copy Approved for Release 2011/07/22 : CIA-RDP80-00809A000600360135-2