MORE COAL DISCOVERED; POWER PLANT IN OPERATION SOON

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600360759-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 21, 2011
Sequence Number: 
759
Case Number: 
Publication Date: 
December 6, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600360759-0.pdf68.52 KB
Body: 
Sanitized Copy Approved for Release 2011/07/22 :CIA-RDP80-00809A000600360759-0 CLASSIFICATION CpNFTDENTIAI, ~'~~FIA~Nj1Al~ CENTRAL INTELLIGENCE AGENCY REPORT 1N FORMATION FROM1' FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. HOW PUBLISHED Daily newspapers VJHERE PUBLISHED ;`ugoalavia DATE PUBLISHED 31 Oct, 4 Nov 1950 THIS 00 CU Y[NT CONTAINS INiORYATION AiiEOTING TN[ NATIONAL 0[i[N][ Oi TN[ UNIT[D STAT[S WITHIN TM[ Y[ANING Oi [l IIO NAG[ ACT !C V. S. C.. ]1 AND l1. AS AY[NDE O, ITS TRANSMISSION OR TN[ R[Y[LATION Ol ITS CONT[N TS IN ANT YANN[R TO AN UNAYTNO RIS[D P[RSOM 1! PRO? MI PIT[D 0Y LAW. R[PRO DU CTION Oi THIS iO RY IS IRO NI[I T[D. DATE OF INFORMATION 1950 DATE DIST. ~ Dec 1y50 SUPPLEMENT TO REPORT NO. Mc_RE coAL DlscovERED; POWER PLANT IN OPERATION SOON MORE COAL DEPOSITS DISCOVERED -~ Pelgrade, Glas, 4 Now 50 Prospecting for coal in the Senj-Reeava basin under the leadership of Engineer Tancic led to the conclusion that the D~inls reeerves amount to at least 30 million tons of brown coal with a calorific value of 4,500 calories. At present the production of ali coal mines in the Senj-F.esava basin amount to two fifths of +,he tota.l brown-coal production in Serbia. Coal mines are being opened this year on Djula Mountain and in the Vodna- Strmostek basin The reserves of the latter are estimated at over 5 million tonsa Transportation facilities in the Senj-Resava basin are inadequate. The Ravna Reka mine is connected with the Senj mine by means of a narrow-gauge railroad. There is no road or industriasl railroad between the Resava mine and the Ravna Reka mine. A 12-kilometer read is being built between the two mines at present, In 1951 the Resava mine will be connected bye standard-gauge line with the main Belgrade-Nis line through Despotovac, Svilajnac, and Markovac. Thus far, 40 kilometers of the 60-kilometer Despotovac-Resavica line have been completed, By the end of 1951 the entire railroed line will be completed and an express train will be able to cover the distance from Belgrade to Resava is 3 hours. TURBINES, GENERATORS INSTALLED -- Ljubljana, Slovenski Porocevalec, 31 Oct 50 Recently the turbines and generators were installed in the hydroelectric power plant at Pesocani rear Ohrid. The plant, which will have a capacity of 2,080 horsepower and will be connected by means of power lines with thermal power plants in Bitolj, Prilep, and Ohrid, will be completed before the end of 1950. In addition to this plant, the plant at Lapuncica near Bitolj and 130 kilo- meters of power lines in Bitolj Oblast xill be completed this year. EQI~f IDEN?TIAL Sanitized Copy Approved for Release 2011/07/22 :CIA-RDP80-00809A000600360759-0