LISTS NEW POWER PLANTS PLANNED, UNDER CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600380088-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 9, 2011
Sequence Number: 
88
Case Number: 
Publication Date: 
February 27, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600380088-3.pdf199.78 KB
Body: 
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3 1 n~"~x~'~F~19AC CLASSIFICATION CONFIDENTIAL COUNTRY Yugoslavia DATE OF INFORMATION 1950 - 1951 INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. CENTRAL INTELLIGENCE AGENCY REPORT SUBJECT HUW PUBLISHED WHERE PUBLISHED DATE PUBLISHED LANGUAGE Economic - Power Daily newspapers LJublJana; Belgrade !y Dec 1950 - 5 Jan 1951 TNIS DOCUY[NT CONTAINS iN IOPYATION Ali[OTINO TN[ NATIONAL OLf[N S[ Ol THE UNItEO ETAT[3 WITNIN TN[ Y[A NING Of [S PIO NAG[ ACT EO U. 3. C.. SI AND 3!. AS AY[XOf ~. Its THAN SYIS SION OR TN[ NLV [LATION NI SI iE DL SY tLI~MS I NEP[ODUCT'ION Of TNIS /D NYN /31 PNO NI BIT[D, I! PNO Newspapers as indicated. DATE DIST.1 Z Feb 1;51 N0. OF PAGES 3 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION LISTS NEW POWER PLANTS PLANNED UNDER CONSTRUCTION PLAN PLANT ON RIJECINA RIVER -- L,jubl~ana, Slovenaki Porocevalec, 5 Jan 51 Recently En3r Mladen Zugal,j of the "Hidroprojekt" Institute in Zagreb de- signed a large hydroelectric power plant to be located on the Ri,jecina River near Ri,jeka< This plant, which will be connected with the plant at Vinoclol, will have almost the same capacity as the plant at Maribosski Otok. Its three turbogenerator units of 17,000 kilowatts each will be able to produce 300 mil- lion kilowatt-hours of power per year. An artificial lake with a capacity of 16 million cubic meters of water is planned to be built at the source of the Ri,jecina River. The dam at the lake will be 35 meters high and 370 meters long. The wa?ber will flow from the lake through a 4.8-kilometer pipeline to a water tower above the city ~i,jeka~. From there, it?will flow through a pressure pipeline with a 280-meter fall to the turbines of the underground plant, which is to be located in the vicinity of the Rijeka Shipyard. The blueprints give another alternative, according to which the plant would be built inside a hill which is in the vicinity of the Rijeka-Susak bridge. The construction coats of the plant are estimated tc be 725, million dinars, while the production coats are estimated to average 22 Para (.22 dinars) per kil- owatt-hour of power., The new plant is scheduled to be built after the completion of the plant at Vinodol~ T.he construction of the new plant will increase the sup- ply of water to Rijeka. TO PRODUCE STEAM TURBINES IN 1951 -- L,jubl3ana, Slovenski Porocevalec, 19 Dec 50 The "Eduard Kardel,j" Steam-Turbine Factory in Karlovac will begin production of steam turbines :.n 1951. The designing office of this factory is located in Znsreb. The temporary workshops of the factory have already succeeded in master- ing *.he production of steam-turbine vanes, which will replace old vanes of tur- bines in thermal power. plants, Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3 CLAS.;IFICATION CONFIDENTIAL r A::e sane DISTRIBUTION ~ IT Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3 1 - 2 - CONFIDEN2IAL Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3 The factory, which will produce steam turbines for tharmo p~yerf =1 ast- and transoceanic ships, will consist of an assembly shop, workaho s are ing parts for assembly, and auxiliary uorkshops. The temporary P already producing parts for assembly, while machinery is being installed in the permanent shop, which is g0 percent completed. Parts for the prototype of the first Yugoslav-made steam turbine are being constructed with some of the machines that have been installed. The designing office in Zagreb is working on the blueprints of the first steam turbine, which is intended for a thermal Power Pla~fter whiech theeengits are expected to be ready by the beginning of February, Aeers of the office will begin to work on the blueprints of a special type of steam turbine for ships. Professor A. Kraft, Dr-Engr, who was the general director is inechargeac- tory in Germany before ,;he war and went to Yugoslavia in 1948, of designing the steam turbines. ,,. ,.nn,mcraFr.Fn -- L.iubl.iana, L~udski Tednik, BUILD ELECTRIC YUW~t PLFtiriS ia. ,?.....~....--__.._ _ - 22 Dec 50 The production of electric power in Montenegro increased 110 percent from 19!}5 to 1949? The thermal power plants in Plevl,ja and Titogrwhichewaswbuiltp eration. The first hydroelectric powut into operationIIe~The Plevl~a Plant will on the Musovica River, was recently p soon install the first high-tension transmissionY8 o y Wider cozistructionat zinc mine at Supl,ja Stena to the ore-processing Gradac. The hydroe"~-ectric power plant at Musovica Rijeka supplies Kolasin and the surrounding territory with electricity. The Musovica plant will soon supply electricity to Mo~kovac xnd the ten factories of the large wood combine under construction in the vicinity. The Slap Zete and Glava Zete hydroelectric powerlplanectricitydto Titograd, tion will soot: be put into operation. 'Phey will supp y _ Nikaic, and the surrounding territory. TheOWe~'~ ltherlandobeinglrecleimed byn struction on the Ci,jevna River will supply p draining Skaaaloko Jezero (Lake Skadar). Construction on the power plant at Belopol~ska Bistrica will soon begin and is scheduled to be completed at the end of the Five-Year2Pkilow ttehours ofelectric poweropenc~apitar plants in Montene- gro to supply 27 OPEP,ATION OF POWER PLANT DELAYED -- L~ubl,jana, Slovenski Porocevalec, 27 Dec 50 The first turbogenerator unit of the hydroelectric power plant at Vinodol ring of 1951 ana will be in operation s th p e in Croatia will be installed during by mid-1951. jlovenski Porocevalec ^f 19 July 1950 (see 00-W-13825u ~tewastin- that the plant would begin operation when its first t gave the stalled in 1950. The same newspaper on 22 August 1950 specific date as 31 December 1950,] ' The machinery for the power plant was ordered in Switzerland severa'1 years ago and is reedy to be installed. Each of the three generators ~ h rseeowera pacity of 35,000 kilovolt-amperes and will be driven by two 19,9 P PPltpn turbines. The power plant will be equipped with three 35,000-kilovolt- ampere trransformers and three lO,oOO-talovol%-nmparc transformers. The three turbogenerator units will be supplied. with water from the artificial lakes Baer, total lengthdof SzLilometerss onnectingtthe threelakesB willraleo beebuiltth a Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3 G~~~~'~Ey~~~~1L MORE POWER PLANTS UNDER CONSTRUCTLON -- Belgrade, Borba, 3 Jan 51 The Ovcar-Kablar hydroelectric power plant on the Western Morava is now under. construe+,ion, Its first turbogenerator unit will be installed and put in`.o operation ir: 1953. The power plant will supply the industrial basin be- tween Uzice and Rankovicevo with power. The installation of the second tur- boganerarer unit 3n the hydroelectric power plant near Zajecar on the Timok River Ls being completed. Together with the thermal power plant at Zvezdan, it will furnisi, power to the Timok basin. The first turbogenerator units of the hydroelectric power plant at Vuzenic.a and at Medvode will hYVe a capacity of 16,500 and 12,000 horsepower respectively. Hoth turbogenerator units are scheduled to be in operation in 1952., The turbogenerator units of the power plant at Jablanica will have a total capacity of 180,000 horsepower. The first unit of 30,000 horsepower is scheduled to be in operation in 1952. TO NAIL HUGE GENERATOR FOR POWER PLANT AT MAVROVO -- Ljubljana, Slovenski Porocevalec, 3 Jan 51 The "R~.de Koncar" Factory recently completed three 24,000-kilovolt-ampere generators for two hydroelectric power plants on the Drava River> Two of these generators are intended for the plant at Mariborski Otok and the third for the plant at Vuzenica. 'Phe factory has already begun the construction of a j0,000- kilovolt-ampere generator for the plant at Zvornik. Recently, the factory be- gan the construction of a generator for the plant at Mavrovo. This generator will have twice the capacity uY the generators for the Drava power plants. PRODUCES RELAYS FOR POWER PLANTS,-- Ljubljana, Slovenski Porocevalec, 20 Dec 50 The "Tela" Factory in Ljubljana, which was established in 1948, produces relays for Yugoslav power plants. Thus far it has furnished relays to the thermal power plants in Trbovlje and Bor, and to the plant of the "Jugovinil" F -;tort' in Kastel Sucurac, as well as to the hydroelectric power plants at Mariborski Otok and Mesici. This year the factory has constructed the prototype of an automatic temper- ature regulator for hatcheries. The factory also plans to produce resistance bridges for measuring distances. CQ~~FI~Fg.~~'~~~ r Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP80-00809A000600380088-3