BASHKIRIA REPORTS METHODS OF PETROLEUM EXTRACTION, 1950 ACHIEVEMENTS, 1951 PLEDGES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600390573-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
October 19, 2011
Sequence Number:
573
Case Number:
Publication Date:
June 7, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 192.46 KB |
Body:
Sanitized Copy Approved for Release 2011/10/19 :CIA-RDP80-00809A000600390573-3
"1
INFORMATION FROM
FOREIGN pOCUMENT8 OR RADIO BROADCASTS CD f:0.
CENTRAL INTELLIGENCE AGENCY REPORI~
CLASSIFICATION S-E-C-R-E-T C~TlIR "~
COUNTRY t.;t9R ? 'Easrklr Assn
SUBJECT Ecanomic. -Petroleum
HOW
PUBLISHED L~a11:~ revapapers
WHERE
PUBLISHED Moe'..?"
DATE ,p~ .~._ Mar 195:t
PUBLISHED
LANGUAGE
N yr rrrc/0 rL~al rll111e iwa w ___ .._. __
r. 1. e.. li lrr 11. o ?rnou, in nlrlruuor ow }IIl anrunw
N irs eorara it ?n rlrru 70 ?r Mrlrnromao naor n no?
uNnr n u~. ^rnosrc.?r or tr~n-oar a norlNnr.
GATE OF
INFORMATION
1951
DATE DIST. ~
Jun 1951
N0. OF RAGES
3
SUPPIEM~NT TO
REPORT X10.
THIS IS UNEVALUATED INFORMATION
BpSHKIRIA REPORTS METHOllS VP' YE"~11 Oi,EtJML'XTRACTiOit,
1.950 ACFIIEVEME)!FPSF. 1951 PI~DGEs
LISTS EFFICiE:RCX METHODS -- Moscow, Izveatiys, 31 Mar 51
Fetrbl.ewn ~aorkers of the Bashkir ASSR have assumed new obligations for
1951.. By m~byli.~ing available reserves they have resolved to extract con-
siderably iaore petroleum during the year than previously and to achieve
higher tecYmkcal. progress.
Contoural flooding employed in the Tuymazy oil fields !ass originated
by Boviet ecle:ice. This method makes it possible to extract at the cheapest
rate all pet_*oleum Prom the deposit, not one third to one ha?.P as uaa the
case xhen the old method rasa used. With this new type of exploitation of
petroleum deposits the drilling front is greatly narrowed, drilling time
definitely is decreased, and savings to the State are increased. Production
coats of one ton of petroleum are lowered to one sixth their former rate.
simultaneously with contoural flooding, nee Boviet techniques are spread-
ing widely. In addition to the machines and instruments provided by indus-
try, technical innovations, suggestions of inventors, efficiency experts,
and-oil field workers are being utilized. special scraper dewaxing devices
hwe oven introduced to remove wax which is precipitated on the walls of
comspreseor-pump pipes. These devi~as are lowered and hoisted by electric
winches. The automatic scraper designed by the Ufa Scientific Research Petro-
leum Institute is particularly effective.
Many oil wells hale been provided with automatic liquid-level controls
and?gas-pressure regulator valves. At oil field No 1 of the Tr~ymazaneft'
Tivst a dispatcher system oP control with a block system has been put in
effect in a number of wells. Row, operators can service five to six wells
from one point .
-1- ~,
~,~~~~~~
CLASSIFICATIONV s-P_s-C-R-E-T
STATE w,yy Nsns DISTRIBUTION
~~ ap fel
proved
Sanitized Copy Approved for Release 2011/10/19 :CIA-RDP80-00809A000600390573-3
iFev. ;. .. ; ~;.~ 'r,~gv~ aquzp~!oenr,. nr~?uared by Ural machin!~-bu.tlding plants,
has d,~ublewGtiiN ~spe~~d of oil-wei:i. s7.nking under difficult geological condi-
tiuna.. The une :-f a as?elivs ma~hinc in conjunction raith a movable electz:ic
Bower atetins: bas proved advantageous in exploratory drilling. Drilling
speed has be~c,me tvo to three times as great as it formerly was, and it has
become goaaib::~ to drill ap11.s to a depth of 1,200 meters. The Bashneft'
Asaociati_~r: i preYSrirg an Ufimeta lu?elius machine with whose help it will.
be onnslb'_e ro aC11iP.Ve a depth oP approximately 2,000 meters:
On:> ^f tn., r,~:t.s*_~.~ndi.rg dr'llers of the Tuymazanef't' T~u_t, +.n collabora-
tion witi, the e:,g'.ce.ers, werke~i aut a sy~>tem of turoodr.~ll~ng by a forced
method. Jr,,~ ~:~ :.i'_.e~ achieved a rata of ]..,012 meters per machine-?month, while
anotl:e.~~ aeT, the record `~.r Hasiilti.ria with 1,142 meters. 'Pi,E n,unbar rjf bri-
gades ueiug :,tie i~~r::ed method is increasing but the maximum dissemination of the
metned is ~?.?:rr_ngpnt :ti:on the al:_ocaticn of additional mud pumps to Bashkiria
by the rT!.:z-tr;~ :+f the Petroleum fndustry. The drilling rate +oa1d be stepped
ui, 20-30 percent i* awl brigedes wEre com~erted to this method..
The c.;'r::.>. for' Co;1tn~.ira1 flooding aims at an educaticnai level of ?years
achoai~.ng ~. ?ec~,:,dsrY--sch,_ol trs:.ning ?or each worker Workers may ~tady
is a crh.~,:.~~;.- young workers, at a co_?respondence secondary s..norl, or at
a petrcia?am tekhm,kam. -- S. Kurykin, chief, Bashneft' Asaociatio;~nero of
Socialist ':.aL~:?. D??^.puty to Supreme Soviet USSR
WORKERS Rb'V:~E4i ACHIEVEMENTS, MAID; PI,IDGLS -- Moscow, Pravda; 30 Mar 51
In a'._ett~r t~ Stayin the petroleum workers of the Basldci* ASSR list
their past ac.hi.evements and make pledges for 1951 as follows;
They Etatr, that they completed the postwar live-Fear Yian ahead of
schedule, as vela as the additional pledgee ~rhich they had made for the yearn
They extrar~tect 2.5 tim?:, as much petroleum in 1950 as in 1946, rei'ired twine
se much pet:~ieu^c, carr.ed eat 3.; times as much oil-well drilling and 6.5
times as such construction and assembly ~aorko
During the peat 5 years, petroleum fields and refineries gave the state
117 milling rubles of accumulatlone above-plan The year 150 showed in-
creases over 194y as follews~ for petro].Pum extraction, 30 percent; for
refining, b,5 percent; fc;r drilling, 207 percent; and for construction,
49 ~.5 percent
During the past 5 years, 379,000 square meters of living quart~ra were
constructed and put in use, including 114,000 square meters in 1950. Dozens
of new schools, new clubs, hoap3tsls stores, public eating places, bathe,
kindergartens, and nurseries were conatructed~
The petroleum workers pledge toy
1.. Increase petroleum extraction 22.4 percent above their 1950 achieve-
ment and deliver 1.00,000 tons of petroleum above the plan established for
1951>
2a Complete the p3an for drilling ahead of schedule and increase .tha
speed of drilling 15 percent for exoloitational drilling, 16 percent for
exploratory drilling? and 5 percent for shallow (krelius) drillingo Drill
not lees than 80 percent of the meterage by the turbine method and mechani2e
derrick assembly operations
- 2 -
S-E-C-R-E-T
Sanitized Copy Approved for Release 2011/10/19 :CIA-RDP80-00809A000600390573-3
Sanitized Copy Approved for Release 2011/10/19 :CIA-RDP80-00809A000600390573-3
-1
y.. c`--nr~ete the year program for conatzvctfon and ase,embl.q work being
cas~r?ied cut by the organization il:aelf by 21 December 1951^ Pu.. in use during
1951 by i ~~., ~~~' ~?quare meters o4 r_ew living quarters being built by tr a organi-
zat i C~ZI : t 5 ei.? .
y.: ha;?,~:-e the production costa of one ton of petroleum 2 percent below
the plan a`?.' -?~,.rieve 5 million above-plan rubles a4 gains from their basic
activ~-c' ee
-r,??~:a::a ~ax~?r. pxod!~ctty*_ty 2 percent above the 1951 plan for petro-
].eum ~x:t: e~ tton And. one percent fcr dri:Ll.ing.
6, Pier ~_e d?e.p exri.-;rst:.ry drilling 1n ten areas e.n3 ep=n up one new
petrel.eua, a?p::~1t~
?. ,%r,io and retrain 4,500 ti'~;rkera,
E:ntezpr.iaes >~f the ENshneftez;avody Pssociation pledge to:.
1, Excr.~d the plan for petroleum refining one percent and the plar.for
light-celc_e~i petroleum products 1>c percent.,
2. "u:cease the amount of light-colored petroleum products derived
rrom crude petroleum 0~5 percent above th. plan.
ln~,-voss _Abor pr~durtl,vity 1^5 percent about 1950.
1,, ,. 1..~:-ar industrial lea ass of petroleum and petroleum products 3 percent
above the p.ar_rzed n.nrID..,
5.. Save above the planned norm 2~3 percent of fuel and 3 percent of
electric po+~er., steam and reagents??
~. lsau=-i:ar~xe themselves with new technological processes of petro-
le.mti refining and. start issuing ne?~ types of petroleum products.
7.. Construct and put in use 6,300 square meters of living quarters bung
built by the organization itsel4.
8~ Lever production costa of petroleum products 0.$ percent below the
plan and ac:hfeve above-plan savings oP 4 miilfoa rubles.
The construction organizations pledge toe
1. Complete by 21 December the year plan for construction and assembly
work sad assure ;:ompletiQn of the plan for putting lnduetrial structures into
use.
2. Complete ahead of schedule living quarters and cultural sad public
buildings being built by contract. Put in use in 1951 not leas Phan 91,000
square meters of new living quarters and 20 cultural and public buildings.
3. Completely utilize the capacity of the newly constructed brick planta?
and othe2? local construction-?materiels enterprises, and also take measures for
further lncreasing their capacity and improving the quality of their operations.
4. Intensify work for the complete mechanization of c~~natruction and as-
sembly work, and assure the fulfillment of the established plans for the mechani-
zation of canatructioa- the increase of labor productivity, and the lowering
of production costa.