PLANTS PRODUCE TRANSFORMERS, SWITCHES, GENERATORS, MOTORS FOR POWER PROJECTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600400534-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 25, 2011
Sequence Number: 
534
Case Number: 
Publication Date: 
July 31, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600400534-4.pdf110.15 KB
Body: 
Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400534-4 SUBJECT Economic; Technclogic$1 - Electrical machinery HOW PUBLISHED Daily newspapers DATE PUBLISHED 21 Mar - 12 Apr 1951 LHID DOCUMENT CONTAINS INFO NNATION AFFECTING THE NATIONAL DEFENSE THE UNITED STATES WITHIN THE MEANING OF ESPIONAGE ACT SO S. C.. SI AND 3D. AS AMENDED. ITS TRANSMISSION OR THE REVELATION ITS CONTENTS IN ANT MANNER TO AN UNAUTHORIZED PERSON IS PRO' ITED ST LAM. REPRODUCTION OF THIS FORM IS FROHISITED. INITIATES PRODUCTION OF HIGH-POWER TRANSFORMERS -- Baku, Bakinskiy Rabochiy, 21 Mar 51 The Leningrad Elektroapparat Plant has shipped a large consignment of in- door and outdoor disconnecting switches and current trenuforaerrrto the Kuybyshev, Stalingrad, and Volga-Don Canal projects, The plant is now preparing to build high-power transformers, and the first parts have already been made in the current transformer shop. The plant plans to assemble the first high-power transformer by 1 May. Plant experts have developed the design of a high-voltagecdi.stributing appass, ratus. for the type ESh-1075 walking excavator, which has a 14.cubic-meter bucket. The plant has made three sets of distributors, and, will turn out two more by 1 May. The Kharkov Electrical Installation Equipment Plant has constructed and shipped a transformer substation to the Stalingrad Hydroelectric Station site 3 days ahead of time. The plant has started the output of mobile workshops for electrical installation work, and has shipped the first lot of them to the Volga- Don Canal site. The Leningrad Elektrosila Plant imeni S. M. Kirov is working on hydrogener- ators with shafts weighing more than 30 tons for the Tsimlyansk Hydorelectric S. Station. Assembly and welding of hydrogenerator stators has begun. CLASSIFICATION S-E-C-R-E-T CENTRAL INTELLIGENCE AGENCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS REPORT CD NO. DATE OF DATE DIST.. / Jul 1951 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUITED INFORMATION PLANTS PRODUCE TRANSFORMERS, SWITCHES !_F.NG!R ATl1RA MrPPORS I'OP POW R PRf.TRX?.TS STATE ARMY LNSRB FBI DISTRIBUTION 8ECBEI Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400534-4 Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400534-4 SECRET S ?-E -C-R-E-T SEND GENERATORS, MOTORS FOR CONSTRUCTION PROJECTS -- Frunze, Sovetskaya Kirgiziya, 12 Apr 51 The Kharkov Electrical Machinery Plant imeni Stalin has shipped two powerful generators to the builders of the Main Turkmen Canal ahead of time. A large con- signment of hxploaion-proof motors was shipped to the Kuybyshev Hydroelectric Station 2 wee:xs ahead cf time. ASK FOR MORE, BETTER CASTINGS FOR ELECTRIC MOTORS -- Minsk, Sovetskaya Belorussiya, 30 Mar 51 The electric motor shop of the Mogilevsk Metalworking Combine has exceeded its February plan for motor output by 117.1 percent. Electric motors for the Volga-Don Canal were shipped out 1-Iff months ahead of schedule. 'Motors-for'the Novo-Krametorsk Plant imeni Stalin and for road- and construction-machine- building enterprises which assemble equipment for the hydro..lectric projects were also shipped ahead of time. The VoUkovskiy Pig-Iron-Casting Plant, Grodno Oblast, does not supply cast- ings to the Mogilevsk Combine on time, sends very low quality castings, and thus hinders fulfillment of the plan for output of electric motors. -- I. Gorulev, chief of the electric motor shop, Mogi.levak Metalworking Combine CONSTRUCT AEtiCiUE-TIM MOTORS j'FOOR VOLGA-DON CANAL --- Moscow, Moskovskaya Pravda, 3 Apr 51 The Moscow Dinamo Plants coostructe3 30 electric motors above the plan for the Volga-Don Canal duc^ing March 1951. URAL PLANT BUILDS MOTORS FOR PROJECTS --. Moscow, Trud, 6 Apr 51 The Uraleick-t,oappa.:'at Plant makes powerful electric motors for the Kuyby- shev GES and the Volga.-Dcn Canal. MAKES MOTORS FOR KAKEOVKA PROJE~T -- Kiev, Pravda Ukrainy, 11 Apr 51 The Kharkol t,.Lectr:..technical ^lant has shipped dozens of motors to the Kuyby- shev, Stalingrad, and Vo-lga-Don Canal projects, and is now making motors fat the MAKES PARTS FOR F(WFR PROJECTS -- Leningradskaya Pravda, 21 Mar 51 The Leningrad Plant imeni Kcrosomollskaya Pravda makes complex plastic parts for high-voltage electrical equipment, and builds current transformers and re- mote control equipment for the construction projects. LOWERS COST OF ELECFF-ICAL EQUIPMENT -- Moscow, Izvestiya, 6 Apr 51 The Ufa Electrical Equipment Plant has fulfilled the first-quarter plan for 1951 ahead of time and lowered production costs by 12 percent. The plant fills orders for the great construction projects. S-E.-C-R-E-T SECRET Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400534-4