NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

BIG EXCAVATORS GO TO SOVIET CONSTRUCTION SITES; MULTIPLE-BUCKET MACHINES DIG CABLE, IRRIGATION DITCHES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600400593-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 25, 2011
Sequence Number: 
593
Case Number: 
Publication Date: 
August 6, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600400593-9.pdf180.4 KB
Body: 
Sanitized Copy Approved for Release 2011/08/25 :CIA-RDP80-00809A000600400593-9 "1 CLASSIFICATION S-E-C-R-E-T SECR~t' CENTRAL INTELLIGENCE AGENCY REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD PrO. SUBJECT HOW PUBLISHED WHERE PUBLISHED USSR DATE PUBLISHED 13 Jan - 25 Mar 1951 LANGUAGE THIS OOCUYtNT CONTAINS IN fORYATION A]P[CTING TNl NATIONAL D[it NSt OF TN[ UNIT[D lTAT[S YITNIN TN[ Y[ANING Oi [l PIONAGL A07 t0 Y. !. G.. ]I ANO ]i, A] AYl ND[D. Iii TPANl MISSION OR TNt RIYtLAT10N NIPIT[DOtTTL ~3 I RIPRODU CTIION OS TNIS PORY OISI PRONI [pT[D. I! PRO? Daily newspapers; monthly, weekly periodicals DATE OF INFORMATIOP: 1951 DATE DIST. ~p Aug 1951 NO. OF PAGES 4 SUPPLEMENT TO REPORT N0. THIS IS UNEVALUATED INFORMATION Newspapers and periodicals as indicated. The nex walking dragline, the ES'h 14/05 built 50X1-HUM at the Sverdlovsk Uralmash Plant is perf^rming ?Zighly praduc ive wor on the Volga-Don canal protect. The machine :nas a 65-?metern]]~g,t 1>toom and a 14-cubic- meter bucket which weighs 18 tons> Its op?rating crew consists of 16 men, with five working each shift. Five crew members have ha3 a hi~he.? education; the rest have studied at seconds.ry techni.~a~. sc:nooia :. The machine's productivity is rated at 2`,CI buckets of earth per shift. It is estimated that the dragline is sayable ?af rsplacing tae labor of 7,000 workers. DRAGLINE HAS 16-MAN CREW -- Kiev, Pravda Uec~ainy, 13 Jan 51 Moscow, Ogonek, 11 Mar 51 The designating mark of the ESh 1465 is brok4n down ss follows: Moscow, Literaturnaya Gazeta, 20 Mar 51 'The ESh-1465 walking dragline ie powered by 48 electric motors. BUILD THIRD MCDEL OF WALKING EXCAVATOR -- Vil'nyus, Sovetskaya Litva, 25 Mar 51 The 5verd'lovsk.Ura].maeh P3~nt has begun to build a new heavy Talking exca- vator, the third model of this type of machine to be produced. Its capacity will be lees than that of I:' @is, #~ ilue~Cef~ having s volume of 10 cubic W - BIG EICCAVATORS GO TO SOVIET CONo24tUC'PION S"1'"TES; MULTIPLE-BUCKET MACHINES DIG CABLE, i,L2RICATION DITCHES E Excavator Sh Walking {Shagayushchiy) 14 Volume of bucket (cu m) 65 Length of boom (m) STATE ARMY CLASSIFICATION s:I~-C?-B-E-T - NSRB Q SECRET __`- Sanitized Copy Approved for Release 2011/08/25 :CIA-RDP80-00809A000600400593-9 NAVY AIR Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400593-9 -1 meters. The boom will be 10 meters longer, however, so that the machine will be able to move out earth to a radius of 75 meters. Other heavy-machine-build- ing enterprises are contributing to the construction of the new machine. The excavator', scheduled for completion by the second quarter 1951, wi]1 be sent to one of the big construction pro,~ects. It should have a daily pro- ductivity equivalent to that of 6,000 workers. MOUNT DIGGING UNIT ON TRACTOR -- Moscow, Mekhanizatsiya Stroitel'stva, Feb 51 This year, the Dmitrov Excavator Plant of the Ministry of Construction and Road-Machine Building put out an experimental model of the new ET-121 ditching machine. Designed for use in laying power and communications cables, the machine consists essentially of a multiple-bucket, chain-drive digging unit, mounted on the rear half of an STZ-NATI tractor. Because it is mounted on a standard tractor, and has only a small number of extra parts, the coat of the machine is considerably lower than that of other, types, and 60 percent less labor is requis~ed for its assembly and the manufacture of parts. Spare parts do not constitute a problem, since the machine can use moat of the spare parts for the STZ-NATI tracer. Finally, it is simpler to operate. The machine was put through taste by an interdepartmental committee, running it in clayey soil of average moisture content. Maximum productivity was 93.6 cubic meters per hour, minimum productivity (working in soil of high moisture 'content) was 60 cubic meters per hour. It was found that the machine was running at only 35 horsepower during the testa, although it has a rating of 52 horsepower. Possibilities of increasing the machine's productivity ir. the future are under consideration. On the basis of testa, the committee recommended tre machine for series production, and the plant has accordingly put cut its first series of the ET-121. Specifications are as follows: weight (kg) 7,570 800 4 Overall length, bucket frame raised (mm) , 0 Height in operation (mm) 2'15 4 Maximum height, in traverse (mm) 00 3, Width, in operation (mm) 2,400 Width, in traverse (mm) Rated productivity, working continuous7.y (cu mfhr) 90 Dimensions of trenches dug (mm): 1,200 Maximum depth 500 Width Motor: 1,250 vo .Lions per minute 52 Horsepower Length of bucket frame (mm) 2,550 19 Number of buckets ) ( ~ 0.75 eec m Speed of bucket chain 12 Volume of buckets (liters) 2 0 Speed of discharge conveyer belt (m~sec) Working speed (m~hr): ~ 74-155 Forward (4 speeds) 60 Backward S-E-C-R-E-T ~~c~~~ . __ Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400593-9 Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400593-9 "1 S-E-C-R-E-T Traversing speed (km ): Forward (4 speeds Backward 3.82-8.04 3.12 CANAL DIGGER DOES WELL ON TESTS -- Moscow, Mekhanizatsiya Stroitel'stva, Mar 51 The Kiev Excavator Plant has built an expo-imental model of the new EM-161 multiple-bucket transverse excavator. Designed for digging irrigation ditches, it was built according to a plan submitted by the Leningrad Affiliate of the All-Union Scientific-Research Institute for Construction- and Road-Machine Building and desio ers of the plant. The machine is mounted on crawlers of adjustable span, the body riding di- rectlyc on a main crawler, while the second crawler is attached outrigger-fashion to the end of 'a telescoping tube which houses a transmission shaft. The crawlers can thus move along opposite sides of the irrigation ditch, adjusted to its width. The bucket arm, lowered between the crawler3 into the ditch, is adjust- able in digging angle and length. The machine can dig ditches 3.5 meters wide at the top and 1.5 meters wide at the bottom. At the end of 1950, tests were run~on the EM-161 xitr representatives of the Ministry of Agriculture attending. Working on existing canals, the machine achieved an average productivity of 34 cubic meters per hour, while its average productivity in digging new canals was 29-cubic meters per hour. The over-all performance of the machine was ad,judge3 entirely satisfactory. Spec ificationa are as follows: Weight (kg) 8,000 Length of bucket arm, fitted. with 16?-liter buckets (mm): 3,620 Maximum Minimum 3,270 Length of bucket arm, fitted with 8-liter buckets (mm): Maximum 3,3~ Minimum 3,100 Width of crawlers (arm): 880 Main crawler .Secondary crawler 440 Tread (mm): Transmission tube extended to maximum 4,900 Transmission tube at minimum 1750 Over-all dimensions of machine (mm): Length 6,470 Maximum width 6,325 Minimum width 3,175 Height 5,200 Rated productivity (cu m~hr) 34 Speed of bucket chain (m~aec) 0.6 Working speeds (km~hr): First speed 0.172 Second speed 0.34 Transport speed (km~hr) 1.5 Motor: Type ~ U-2 Rated horsepower 22 Rated .revolutions per minute 1,200 -3- S-E-C-R-E-T Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400593-9 Sanitized Copy Approved for Release 2011/08/25 :CIA-RDP80-00809A000600400593-9 ftEW EXCAVATOR HAS IIQCREASED PRODUCTIVI'T'Y -- Leningradskaya Pravda, 7 Feb 51 In 1950, the Leningrad Excavator Flant, assisted by the Scientific-Research Institute for Construction- and Road-Machine Building built an experimental model of a"neW excavator. The new machine hae a 25-percent highez productivity than existing models. aeries production of the machine will begin this year. -~+- S-E-C-R-E-T Sanitized Copy Approved for Release 2011/08/25 :CIA-RDP80-00809A000600400593-9