NEW EQUIPMENT GOES TO FOUNDERS, METALLURGISTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700040352-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
October 27, 2011
Sequence Number:
352
Case Number:
Publication Date:
February 12, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 90.62 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2011/10/31
CIA-RDP80-00809A000700040352-5
COUNTRY
SUBJECT
HOW
PUBLISHED
WHERE
PUBLISHED
DATE
PUBLISHED
LANGUAGE
CLASSIFICATIbQ JCI ki '- NFORMAT CONFIDENTIAL :ION L
CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO.
Economic; Technological - Heavy machine build-
in^, production
Daily newspapers
USSR
9 Mar - 15 Sep 1951
Tbn e0Ceexxr COSTAIII IIIUIIADOI ArgCrlll lilt ^AOGIAI exnx.x
0/ TMx 0111x0 .nn. WIIDII rxx Iuxu. a Irlel..x Air IO
.. .. c..nAxo A.Anxoxo. nxxauno+ol rxx lxnunol
er m coxnxn a ur IxIIU re a uuurxouxeo nnox n ..
Iumo n ux. xuxeournol OF rxu ron a r.oxurrxn o
DATE OF
INFORMATION ^5
DATE DIST. IL Feb 1952
SUPPLEMENT TO
REPORT NO.
NEW EQUIPMENT GOES TO Fo;'T 'IS METALLUFGiSTS
TURN TO PRODUCTION OF _OI,'VEv_ESS .. rbil:=i, larya Vcstoka, 10 Jun
51
The Tb111st Macair.ery Plant r:ertly completed Its first foundry con-
veyer, which is to gc t-) L.s Otar'r._: Post Plant, The Tbilisi plant is
now working cn a second su c. ccnvcyer f'?r .-.-e Krasncdarak Oktyabr Plant..
MAKES CONSUMEPS GOODS FOP FIRST TIME - Tbilisi, Zarya Voatoka, 15 Sep 51
The Tbillei Ma:oinerv ylac- L );It c,ut third foundry conveyer in
August. Since the beglonino~ t'.-_3 q;ar to-, tr. plant t:as been produc-
ing consumers gods, 1r.tluding nar:?.a:P .,: tt:: fi::i tim=.
PRODUCVS NEW CENTRTFTIAL-CAST! NG MAC INE - Mc,-ow. Ve;herryaya Moskva,
4 Jun 51
The Moscow IC asnaya Preanya Plant na; met its 5-mcntn plan ahead of
time, exceeding the May quota Tie plant _s now completing the assembly
of a new high-d.ity centr!fugal. pipe--astinb ma':t:ne and will soon sutject
it to tests,
The brigade as+igr-cd to assembly of the Type 294 sand stinger is
keeping its work con_i5tently in t-,: "good" and "excellent" class,
PUPS OUT NEW CASTING MACHINE -- Moscow, Moskovakays Pravda, 6 Jul 51
The Moscow Krasnaya P-'ssrya P'an`. has put out a new heavy centri-
fugal-casting me :,ire. A bu:ket automatically pours a measured amount
of molten iron in,o a metal mold which revolves at 740 revolutions per
minute, At the end of 3 minutes, the machine automatically draw; from
the mold a finished section of pipe, several meters in diameter, and de-
posits it on a rack,
The Krasnaya Presrya Plant has recently put out seven new types of
machines..
STATE NAVY
ARMY AIR
? 1 -
CLASSIFICATION CONFIDENTIAL L
NSRB__ DISTRIBUTION
FBI
Declassified in Part - Sanitized Copy Approved for Release 2011/10/31 :
CIA-RDP80-00809A000700040352-5
R
Declassified in Part - Sanitized Copy Approved for Release 2011/10/31
CIA-RDP80-00809A000700040352-5
C (F!tENTIAL
TEST HAMMERS FOR CANAL BUILDERS -- Alma-Ata, Kazakhstanskaya Pravda, 8 Jul 51
The Alma.Ata Foundry and Machinery Plant has developed a new pneumatic
hammer, the VM-75, which replaces the labor of four forgers and four hammer-
men.
The plant is now tasting four hammers which it completed for the build-
ers of the North-Crimean and South-Ukrainian canals.
BUILD NEW ROLLING MILL Tashkent, Pravda. Vostoka, 10 Jun 51
The Staro-Eramatorsk Machine-Building Plant imeni Ordzhonikidze has com-
pleted the assembly of a fear-high rolling mill It can cold-roll a steel
sheet as thin as a newspaper page The metal moves through the rollers at
30-120 meters per minute, subtected to pressures of up to 100 tons. The en-
tire mill weigns 32 tons,
SUPPLY PLANTS WITH MILL PARTS -- 'i.Oscow, Trud, 1 tot
sl
The Lutugino Iron-Founding Flant has begun to turn out rolls for the
rolling mills of the Makeyevka Plant and the Azovstal' Plant.
NEW BLOWER DESIGN SAVES METAL -- Ler,ini:radskaya Pravda, 9 Mar 51
The Leningrad Nevskiy Machine-Building Plant. imeni Lenin has completed
tests on a new exhaust blower for drawing gas from coke ovens. The new
blower has only two rotors, instead of four, as was the case with older mo-
dels. This change has made the machine lighter and will save metal.
CONSTRUCT AUTOCLAVE FROM SAVED MF1'AL -- Vii'nws, Sovetskaya Litva, 6 Jul 51
The Kuybvshe. St.rommashine Plant ha ridged to build four autoclaves
from Paved metal for the Cha.payc-;;;; Si]::.itc Plant One of these autoclaves
has already been conplcac.d
NEW MACHINES WILL KEEP UNIVERSITY 'GOi. -- Mrs;.ow, Vechernyaya Moskva,
14 Jun 51
The Moe >w St to University will be equipped with four 5-E steam-water-
ejector cooling machines which will c :, In. laboratories, lecture halls, and
reading rooms during the hot summer months
Developed by designers M. an
K I. Krvlov of the Moscow
Kompressor Plant each of the rac'r,inas can draw cff 00,000 calories per hour
The water circulated to the various parts of the uni 3versity will have a temper-
ature of 5 degrees centigrade
The first of these machines was put cu, in March and the second in April.
The next two will arrLve at the university in May
Declassified in Part - Sanitized Copy Approved for Release 2011/10/31
CIA-RDP80-00809A000700040352-5