DEVELOP NEW HEAVY MACHINE TOOLS; SHIP MACHINE TOOLS TO CONSTRUCTION PROJECTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700060123-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 5, 2011
Sequence Number: 
123
Case Number: 
Publication Date: 
April 24, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700060123-7.pdf145.33 KB
Body: 
Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060123-7 CLASSIFICATION CO&FLi;.i'i':CAL CENTRAL INTELLI~ G~ ~NCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO pROADCASTS COUNTRY USSR SUBJECT Rcoaomlc; Technological ~ Machine tools, HOW coaatruction FroJects PUBLISHED Daily newspapers DATE DIST. 2'f Apr 1952 WHERE PUBLISHED -79SR DATE PUBLISHED ~ 3 Jen .- 9 Feb 1952 LANG~JAGE Russian ma ooeuuaur eoxruxa uroaunoa anarnxa rxa xanaxac Danes or rxa uurtm sum mmx rxa ?uxua or unoxaoa ac, ao u. a. c.. a+ uo u, a axaxoao. m naxansmox oa rwuanunw ar m coxnxn a axr gxxax TO Ax YxaYTN0a+II0 maox a rao~ xunao ar us. nnoournox or rw+a rou a ruoxumo. Aewspapera as indicated. N0. OF PAGES 3 SI;PPLEMENT TO REPORT N0. THIS IS UNEVALUATED INFORMATION DF.V~'?'.,;P .*+~'W 5EA~7 MACHIRE TOOLS; . SHLp~~IlgE TOOLS COl STHIICTIOA FROJEGTS PLfi 0?7r 1PEW u.Ar_g~ ?QOL3 .- Kiev, Pravda Ukrainy, j Jan 52 seating oY a newr3odel 12.90 four..spindle automatic xae complete3 at the Kiev Mar_h:ne-fool ?uildi.-ig Plant 1mea1 Gor'kiy oa 2 3enuary. A group of ape- cieliate, headed by Tereahchenko, leading designer, worked on its development for almost a year, A 25-ton aachine tool, designed for high-speed machining, la the latest achievrmen{. of 9oW_et machine-tool building tecYmlque, It can machine steel YOds ~d Pipes from 70 to 100 millimeters in diameter vltb tnaxlmi? accuracy All processes for mn;ifact,u-iag the parts are ,:ompletely automailc~ ~ 1951, the plant Put oat 12 new types of modern machine tools. AS9II+L9LY TIME OF HEAW MACHINE TOOLS CUT IN HALF -_ Moscow, Pravda, 9 Jan 52 Tnnovatcrs a~t the Kramatorsk Heavy Machine-Tool P~uil3iag Plant have dis- played unusual initiative in increasing the output of products from existing production areaao Instead of successive assembly of Eeparate unite, simul- taacoua parallel assembly of units has been organized, with the use of various attachQenta in the process. This new method of assembly hen cut in half assembly time of complex: ma_ chine tools, For example, the assembly of a heavy lathe new tares 28 days lnsteed oP 5R, Kiev, Pravda Ukrainy, 15 Jan 52 The Kramatorek Heaw Machine~Tool. PuildinR Plant is manufact++-'-- ??~+~,,,. centplex machine tools for large-scale machine building plants, In 1952, it mast ?'TMoet double its machine tool output from existing production as compared STATE ARMY Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060123-7 Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060123-7 with 1951? 'i'he new program specifies the output of lathes arv' boring mschinea up to 500 tans in weight. The assembly of such a machine tnk~s ~+-5 months. rraty- rally, finding s way to shorten assembly time has great impo~rarcc. Innovators decided to change the basic te~.hnology of machine-tool assembly, Experiments were conducted on the assembly of a large centeri~ss lathe, Ordi- narily, this work takes up to 2 months, the assembly of separate ;wits being carried out successively. As the first step in changing the technology, simul- taneous, parallel assembly of units was organized. A very complex and laborious muter Le the mounting and aligning of ways, mounting of ?erriages, and assembling anu running in of speed boxes, According to thz old technology, first the two right ways were aligned, and then the tro left ones, Carriages were mounted in successive order also Now, these oper- ations are parallel, With the new technology, the time for assembling ways hes been shortened from 8 to 3 days, Prcviousl,~, the assembly, mounting, and alignment of carriage centare were done after the alig~ent of ways. The innovators decided to perform these oper- ations on separate stands, before the carriage uas secured on the machine tool, As a result, the total assembly process xas shortened another 3 days. Improvements have also been introduced in the technology of assembling and running In of speed boxes. These operations are now performed 3lrectly on the base of the machine tool being assembled; the running In is done simultaneously with the mounting and aligning of ways. As a result, ono?her three 24-hour days are saved, Changes have also been made in a number of other operatlons, The total technological assembly cycle of a centerl.esa lathe is now 28 days instead of 58. PUT AEW BOLT,-THREADING MACHINE INTO OPERATION -- Frunze, Sovetskaya ~firgizlye, 25 Jan j2 0~ 23 ,Tannary, a unique machine tool for high-speed manufacture of exenvator bolts was put into operation at the Novo-Kramatorsk Plant imeni Stalin. The ma- chine tool was designed and built by the plant's metal-cutting laboratory. Thread 1s formed ?;m the pact by pressure of two rollers. This increases labor productivity ten ti.mea, The manufacture of e bolt ip to E;O millimeters in di- ameter takes only one minute. The new aggregate will free 15 lathes for other operations. BUILD FIRST 5-METFI2 BORING MILL _- Moscow, Moako?:sbsya Pravda, 9 Feb 52 The Kolomna Heavy blacliine??Tool Building Plant has built, the first 5??meter vertical boring mill, The table diameter Sa 9 meters Parts weighing tens of tone will be processed on this machine, The fire*, ma::hine tools will be shipped to plants where hydroturbines for the big constructicr. p:?oJects will be built. ~+ 1951, 23 types of heavy machine tools were developed at the plant. At least 30 machine tools and hydraulic presses will be built in 1952, Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060123-7 CONFIDENTIAL MANITP'ACI4TRE HEAVY LATHES FOR COIQSTA[TCTTOft PROJECTS __ Tbilisi, Zarya Vostoka, 8 Jan 52 cei ~ the first days of41952, Tbilisi machine-tool building plants began ra- ving new orders for meal-cutting machine tools from the big construction projects, In 1951, the Tbilisi Machine-Tool Building Plant imeni Kirov manu- fnetured 18 heavy lathes Por the construction pro~ecte; the Tbilisi Foundry and Mnchiaery plant manufactured 25 screw-cutting lathes for the projects. All orders vere filled ahead of schedule. ~ 1952, the demand for Tbilisi machine tools is growing rapidly. For example, in the Pirat 3 dayr of January, the Plant imeni Kirov received orders for the: manufacture of more t9ea k0 machine tools for the Volga-Don ftavigatioa Canal and the Kuybyshev hydroelectric constructioa projects. Oa 3 January alone, 11 orders for machine tools were received at the pleat. Moscow, Vechernyaya Moskva, 12 Jan 52 The Tbilisi'Machinc-Tool Building Ple.nt imeni Kirov has shipped the first six heavy lathes to the Vglga_Don construction pro3ect ir. 1952. Assembly of the next group of screx-cutting lathes for construction pro~_ acts 1a now under xny. Moscow, Izaroatiya, 3o Jan 52 The Tbilisi Machine-Tool Building Plant ineai Kirov shipped 11 powerful metal-=utting machine tools to the Volga-Don, Stalingrad, and Krybyshev con- struction pro~ecte 2 months ahead of schedule. FIL1. ORD?.RS FOR COHSTRUCTIOft PROJECTS AREAD OF SCHEDULE .-_ Minsk, Sovetskaya Beloruseiya, 6 Jan 52 ~ 1951, the Orsha Krasnyy Boreta Machine-Tool Building Plant shipped more than 200 slotting-milling, pointing, sad vertical drilling machines to the Ktip~byehev, Stalingrad, and Kakhovka GES and the canal projects ahec3 of schedule. 7n a fax days, the plant will eend n consignment of vertical drilling ma- chine to the Volga-Don Navigation Canal. The order for these machine tools xas Placed in the latter part of 1951. The management of the construction project requested their delivery in the first quarter of 1952. -3- COftFIDSNTIpl, Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060123-7