STALIN PRIZES FOR INVENTIONS IN TEXTILE MACHINE BUILDING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700070261-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
August 19, 2011
Sequence Number:
261
Case Number:
Publication Date:
July 5, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 120.26 KB |
Body:
? Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261-3
rr'
CLASSIFICATION LMWIDENTIAL
CENTRAL INTEL 1 ENCEO AGENC
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS
COUNTRY USSR
SUBJECT
HOW
PUBLISHED
WHERE
PUBLISHED
DATE
PUBLISHED
Economic; Technological - Textile machines
Daily newspapers
USSR
12 Feb - 17 Apr 1952
"IS 000O.94T CONTAIN. l.IO.11AnO. AO.en.. Ti! NATIONAL o1,1
of To. o.IT.o .TAT1. .ITMI. IN. Iln.u. o....10 AQ AR IS
.. .. C., .1 AN l..4 AY.. o.o. in TI4...L.W.O. TII...Y.LATIO.
OF IT. COOT..T. 1. ANT ISSUES TO Al o.AATOO.I1.o ....O. U ....
MIOTIO .I LAW. ..go.5000. o. T.l..... I. ....I.IT...
CD NO.
DATE OF
DATE DIST. S July 1952
SUPPLEMENT TO
REPORT NO.
STALIN PRIZES FOR INVENTIONS IN TEXTILE MACHINE BUILDING
EQUIP THOUSANDS OF CARDING MACHINES WITH ALL-METAL SAW-TOOTH CARD CLOTHING --
Baku, Bakinskiy Rabochiy, 12 Feb 52
One of the most important operations in the cotton-spinning industry is the
careful carding of cotton before further processing. Carding equipment of many
cotton enterprises is being furnished with all-metal saw-toothed card clothing
according to the method-developed by P. G. Tret'yakov, Stalin Prize winner..
Mass production of this type of clothing has been organized at two plants of
Glavmashdetal' (Main Administration of Machine and Parts Building) of the Min-
istry of Light Industry USSR. The use of such clothing perrt.ts greater produc-
tivity of carding machines and increases their speed.
Mozo than 5,000 carding machines operating at 40 large-scale enterprises of
the cotton industry have been equipped with all-metal aaw-toothed card clothing.
The productivity of these machines has increased 10-20 percent. The cost of pro-
duction has been decreased and the quality of yarn has improved.
In 1952, several thousand more carding machines will be equipped with all-
metal saw-toothed card clothing at enterprises in Moscow, Ivanovo, and a number
of other oblasts.
DESIGN NEW TEXTILE MACHINES -- Moscow, Izvestiya, 12 Mar 52
A group of designers at the Orlov Textile Machine Building Plant, headed
by V. Milovanov, engineer, have developed a new roving frame with suspended
flyer (s podvesnoy rogul'koy). This machine is 40 percent more productive than
ordinary ones.
The plant is beginning series production of braking and picking machines
for new bast fibers. The machines were designed by a group of workers headed
by I. Podlesnyy.
STATE
ARMY
NAW
^I AIR
DISTRIBUTION
7_
-'1 0
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261 33
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261-3
INSTALL NEW CROSS WINDING MACHINE -- Yerevan, Kommunist, 15 Feb 52
A new cross winding machine built by the Klimovsk Machine Building Plant
was installed recently at the Yerevan Fine Wool Combine.
ST6T!_P SERIES PRODUCTION OF SILK LOO. -- Stalinabad, Komsrudet Tadahikistana,
11 Apr 52
The Tbilisi Machine Building Plant imeni 26 Komissary has started series
production of ChGSP-50 small silk looms, for the development and introduction
of which a group of designers and production workers of the Central Scientific
Research?Institute of the Silk Industry has been awarded a Stalin Prize.
Izvesti , 14 March 1952, identifies this group of men at the'institute as
Leonid Trofimovich Ckiereshnev, director of operations, design bureau leader;
Dmitriy Vasil'yevich Glebov, shop chief; Ivan Leonidovich Smirnov, design engi-
neer; Vladimir Sta ovich Khaylo, design engineer; and Sergey Petrovich
Yakovlev, fitter
The new loom generates a speed of up to 180 picks (oborot) per minute, 40
picks more than existing silk looms.
TO MANUFACTURE 700 SILK LOOMS IN 1952 -- Moscow, Izvestiya, 17 Apr 52
Silk-weaving enterprises have received 150 new high-speed silk looms devel-
oped by a group of workers of the silk industry, who received a Stalin Prize for
their work. 'i'nese looms were manufactured by the Ivanovo Shuyskiy Machine
Building Plant imeni Frunze. By the end of 1952, this plant will have produced
700 silk looms of this type.
BUILD NEW MACHINE FOR REPAIR OF LOOM SHUTTLES -- Tashkent, Pravda Vostoka,
24 Mar 52
The Ivanovo Machine Building Plant imeni Korolev has produced a special ma-
chine for checking and repairing loom shuttles.
The new machine was designed by Stalin Prize winner F. D. Levkoyev, chief
of the machinery and repair division, spinning mill of the Kurovskoje Melange
Combine. It is equipped with 12 attachments which make it possible to determine
accurately the dimensions of shuttles to be repaired and to bring them to size.
BEGINS PRODUCTION OF WARP TYING MACHINES -- Moscow, Moskovskaya Pravda,
15 Feb 52
The Kolomna Tekstil'mash.Plant of the Ministry of Machine and Instrument
Building has begun production of portable warp tying machines for the wool in-
dustry.
The new aggregate performs a complex operation automatically. Moving along
the looms, it firmly ties the thread of old and new warp. If even one thread is
missing or breaks, the mechanism stops instantly.
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261-3
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261-3
The scarp tying machine 1s mounted on a small cart. Its productivity is
250 knots per minute.
The,Kolomna Plent is getting ready to produce warp tying machines for the
silk and linen industries.
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070261-3