CENTRAL GOVERNEMNT DIRECTIVE ON CHING CHIANG FLOOD DIVERSION PROJECT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700070290-1
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 18, 2011
Sequence Number: 
290
Case Number: 
Publication Date: 
July 8, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700070290-1.pdf97.72 KB
Body: 
Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070290-1 COUNTRY SUBJECT HOW PUBLISHED WHERE PUBLISHED DATE PUBLISHED LANGUAGE CLASSIFICATION RESTRICTED SECURITY INFORMATION CENTRAL INTELLIGENCE AGENCY INFORMATION FROM FOREIGN DVCUMENTS OR RADIO BROADCASTS China Economic - Agriculture, water conservancy Daily newspaper K'ai-feng 5 Apr 1952 n15 DOCYN[NT CONTAIN$ INIOINATIOI AFFECTING TN[ NATIONAL ONnNN[ 01 fM[ YNIT[O /TAT[[ WInIN TNN YGNINN OI I. I..... ACT IO Y. I. C.. NI ANI NI. ANY MAN[O. ITN T,ANOU.IO1 GN TN[ NCT1UnON NI1IT.D NT LAW. I IVMCYCTIOINI TO /NIL ION- II Rio INI001. IN 1110 SOURCE Honan Jih-pao. DATE DIST. $ Jul1952 NO. OF PAGES 2 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION CENTRAL GOVERNMENT DIRECTIVE ON CHING CHIANG FLOOD DIVERSION PROJECT On 31 March 1952, the Government Administration Council of the Central People's Government issued a directive on the Ching Chiang Flood Diversion Project. The directive called for completion of the oasic control features of the project, including the massive strengthen- ing of the north dike of the river and construction of locks and di- version dikes by the beginning of the flood season. An Engineering Committee and an Engineering General Headquarters were ordered to be established with members drawn from various govern- ing organs of the Central-South China Region. Labor forces, materials supply, and technical personnel were to be supplied from sources in the same regions with the possibility of aid from the Central Government if they proved inadequate. Peiping, 3 April '?lain-hue) -- To reduce the destructive effects of extra-high flood waters in the Yantze River in the area between Sha-shih and Hankow and reduce the strain on the dikes of-the Tung-ting Hu the Government Administration Coun- cil, on 31 March, issued the following directive concerning the Ching Chiang Flood Diversion Project. fC-hing Chiang is the local name of the section of the Yangtze between Sha-shih and Rankov7, 1. The central feature of the 1952 operation, is large-scale strengthening of the big dike of the Ching Chiang to insure that it will not be breached by floods. The required funds may be increased following consultation. The actual detailed working plans and the budget statistics will be provided by the Yangtze Rll-er,Water Conservancy Committee in coordination with the Hupeh People's Govern- ment. They will also decide upon the termination date of the work. 2. Before the flood season of 1952 the dike on the south bank of the., diversion basin and the flood inlet lock and control lock ;seat be completed together with related works. The quality of the engineering must be raised. The responsibility for providing the labor force rests with the provinces of Hupeh and Hunan and the military. CLASSIFICATION n~ LIC ED STATE NAVY NSRB DII'SjTRIRIBU~TION __ _ ARMY AIR Fel 1 I Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070290-1 Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070290-1 3. Under ordinary circumstances t"e new diversion basin will not be used for flood diversion during 1952. Should a specially high flood arise in the Yangtze River and seriously threaten the big Ching Chiang dike, and if the work on the diversion project has been finished, the matter of diverting the flood maybe taken under advisement. However, the Government Administration Council must first receive and approve an appeal from the Central-South China Military and Administrative Committee before the diversion basin may be used.' 4. The removal of the population of the diversion basin area should be carried out uy the Hupeh'government before the beginning of the flood season. 5. As for retention basins on the north side of the Yangtze River investiga- tions and surveys may be begun; however, no policy should be decided upon until other basic control plans have been considered and compared with the retention basin plan. 6. To assure the completion of the basic engineering phases of the Ching Chiang project in 1952 the Central-South China Military and Administrative Committee shall set up a strong, able Ching Chiang Flood Diversion Committee and an Engineering General Headquarters organization. Members of these organizations shall be drawn from the members of the Yangtze River Water Conservancy Committee, members of the People's Governments of Hupeh and Hunan provinces, and representa- tives of the military forces involved in the project. Strong cadres of the Central-South China Military and Administrative Committee shall be assigned as chairmen and vice-chairmen. The administrative and technical personnel of the Engineering General Headquarters shall be drawn from the personnel of the various military units concerned. Since time is all-important in the completion of this project, the above measures must be effected with all speed. Should the labor, materials, and technical resources of the CentrrlSouth China Region be insufficient, specific requests should be submitted to the Government Administration Council of the Central People's Government for action. Sanitized Copy Approved for Release 2011/08/19: CIA-RDP80-00809A000700070290-1