PROGRESS IN CONSTRUCTION OF STALIN STEELWORKS AND OTHER INDUSTRIAL PLANTS IN HUNGARY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700110175-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 14, 2011
Sequence Number: 
175
Case Number: 
Publication Date: 
May 15, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700110175-4.pdf99.45 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110175-4 r- CLASSIFICATION COta'IDEhPLAL SECURITY ILiFORM(1TION CENTRAL INTELLIGENCE AGENCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS REPORT CD NO. DATE OF COUNTRY Hungary SUBJECT Economic - Metallurgy, building industry, chemi- '~ cal construction W IBLISHED TE BLISHED Budapest 21 Nov 1952 - 12 Jan 1953 rx a . x .exr . , . .,, x x.r~ x. re,rxrr r1rxc uxrtm s ?ne..rtx~x rxcauxuacvxn nc n, rccn axa ire .xe n?, or r?e ru.. coot. ?r ?xwom. in u??rxn mox ox .cva? c?n ox or nr caxnxn ro a rucvr n x ? ? u,ro r sow u . u?ma u saxirnen e. u.. ... ....,,.,,.... _.. .. ..... ____ ._ DATE DIST. /J~i~$y 1953 SUPPLEMENT TO REPORT NO. Newspapers as indicated. PROGRESS IN CONSTR[R;TIGN OF STALIN Si'EEIWORKS AND OTHER INDUSTRIAL PLANTS IN HUNGARY WILL COMPLETE NEW UNTIS OF STALIN STEELWORKS -- Budapest, Nepszava, 1 Jan 53 The major units of the Sztalin Vasmu (Stalin Steelworks) are to be completed 1n 1953. These will include the first 704-cubic-meter blast furnsce, two epen- hearth furnaces, and the steelworks ~i~, The shed of the steelworks is large enough to coTrtain 25 six-story houses. The rolling mills will be laid out i.n iyi3? There will be txo rolling mills, each large enough to accommodate two buildings, each the size o? the Budapest parliament building, The harbor, power plant, 1,200 new apartments, and the palace of culture will also be finished by the end of the year, The palace of culture ~ii11 have an o,uditerium with a stage and motion pic- ture screen, a ballroom, library, reading room, and lounge. CEMENT WORKS NEAR COMPLETION -- Budapest, Magyar Nemzet, 21 Nov 52 The Dunai Cementmu (Danubian Cement Plant) now under construction At Va: will have two 150-meter klinker furnaces, The furI]aCP.B will be housed i_n a 330-meter long building, The cement works will provide the Sztalin Vasmu (Stalin Steel;vrf~) with limestone, and barges from the Sztalin Vasmu will bring foundry al:~g to the cement works, The furnaces and cableway for the T)nnni r ?>o>,+m? ,;;,, ,,,,,,,,, r..__ BUILD CHEFfICAL WORKS AT KAZINCHARCIKA -- Budapest, Nepszava, 1 Jan 53 Construction of the Borsodi Vegyimuvek (Borsod Chemical rr7orks) is ex~cte:? tc increase the population of the village of Kazincbarcika to 16,000, STATE ARMY CLASSIFICATION NSRB Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIARDP80-00809A000700110175-4 Declassified in Part -Sanitized Copy Approved for Release 2012/02/08 :CIA-RDP80-00809A000700110175-4 The new chemical xorks x111 utilize the brown coal of Borsod Megye. The new coal grader, xhich rill begin operating in 1953, will supply coal to the power pleat and to the cokery, The power plant x311 supply energy to the entire industrial regim of Borao3 Sid to the IIungarian plains, The cokerywill represent ';he first attempt at converting Hungarian brown coal itrto metallurgical coke. COMPLETE STOREHOUSE AT KAZINCBARCIKA _.. Budapest, S~abad Nep, 12 Jan 53 The storehouse of the ICe.zincbarcilrai Kombinat (Kazincbarcika Combine) xas completed on 10 January 1953? The storehouse is 126 meters long, 28 meters high, and nearly 50 meters aide. It was assembled from 707 prefabricated reinforced concrete units hav- ing atotal weight of 31000 tone. A single pair of arches weighs 80 tons, and each roof unit xeighs 2-g tone, It took 3 months for a construction crew of 21 members to assemble the building, TC BUILD NEW TUBING PLANT -- Budapest, Magyar Nemzet, 27 Dec 52 A aev tubing plant x111 be built between Soroksar and Dunaharaszti near Budapest, The new plairt rill help manufacture the enormous tubes required Por the Budapest Subway, COMPLETE NEW DIAINTENANCE GARAGE __ Budapest, Nepszava, 4 Dec 52 A garage and repair shop capable of housing and servicing 50 motor vehiclF-. has been completed for the TEFU, NV, (Teherfuvarozo Nemzeti Vallai.at, Na- tional FYeight Trucking Enterprise) in Nyiregyha~a, AL1 the washing, lubricat- ing, and servicing equipment is completely automatic. Declassified in Part -Sanitized Copy Approved for Release 2012/02/08 :CIA-RDP80-00809A000700110175-4