SOVIET LOCOMOTIVE REPAIR NORMS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700110573-2
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 15, 2011
Sequence Number: 
573
Case Number: 
Publication Date: 
June 23, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700110573-2.pdf188.38 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 NAR 1952 S1-YC t CLASSIFICATIOM RESTRICTED SECURITY INFORMATION CENTRAL INTELLIGENCE AGENC:' REPORT INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS C[S~NO. COUNTRY USSR DATE OF INFORMATION 1943 SUBJECT Economic; Technological - Railroad equipment HOW DATE DIST. ~3 Jun 1953 PUBLISHED Book WHERE PUBLISHED Moscow N0. OF PAGES S DATE PUBLISHED 1943 SUPPLEMENT TO LANGUAGE Russian REPORT N0. .,o ,... o ,.~ ~... ~oo~.. .~,~~o.a ~ ...,.~ e, .. . Spravochaik po Remontu Paravozov (Manual for Steam Locomotive Repairs) N.N. Zalit and V.V. Vul'f, Transzheldorizdat, Moscow, 1943. Norma Between Capital and Medium Repairs The run norms between capital repairs of road-service locomotives are 390,000 kilometers and not leas than 4 years in the csae`of switching loco- motives. The run norms between medium repairs or between capital and medium re- pairs, or vice versa, are 130,000 kilometers for road-service locomotives and -not less than 2 yearn for switching locomotives. Norms Between Running Gear Repairs The run norm between running gear repairs is, on an average, 40,000 kilo- meters for all series. This norm is generally the minimum for the entire rail- road network. Specific norms for each locomotive terminal are made by the sys- ?tem's administration, depending on the section, ballast, locomotive series, sad other local operating conditions. Norms Between Washing Repairs The average norm for the railroad network is 5,000 kilometers. The average norm over the different systems varies from 4,500-7,500 kilometers. Specific norms for each terminal are established by the chief of the rail- way system. The norms depend on the quality of water and vary according to the different types of locomotives as follows: Locomotives with condensed steam 7,000-12,000 km Passenger locomotives 6,000-10,000 km Series FD locomotive 4,000-7,000 km Series 'E, S0, other freight locomotives 3,500-6,00o km Switching locomotives 14-15 days STATE NAVY NSRB ApMy AIR FB I STAT Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2~ Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 RESTRICTID Layover Norma During Repairs Type Repairs Locomotive Series Norm Capital, in plant .411 series 12 days Medium, in plant ~i y " Medium; ~3 in terminal " 7_9 " Running gear Washing out FD, IS, M, L 20 hours SOk 16 " E, S0, Su, others 14 " In the case of plants, these norms represent the average time which elapses between placing a locomotive into the stripping stall and delivering it to the inspector. The People's Commissariat of Railways establishes specific norms for each plant, depending on the locomotive series repaired. The norms for medium repairs made at a terminal are the average for the network. Specific norms for individual terminals and particular series of lo- comotives are established by the administration of a particular railway system on the basis of a schedule set up by the People's Commissariat of Railways. This schedule provides 10 days for Series FD and 8 days for Series E in the ease of medium repairs, and 5 days for Series FD and 3~ days for Series E in the case of running-gear repairs. These norms include the entire period of time from the moment the locomotive is placed into the terminal's shop, in the case of medium repairs, or into the stripping stall, in the case of running-gear re- pairs, until it is accepted by the inspector and senior engineer. Washing repair norms start with inspection and end upon acceptance of the locomotive by the inspector and senior engineer. Firebox Overflow Water gauges Spark arresters and extinguishers Safety valves, pressure gauges Every washout; period compulsory for all terminals At least every 3 months; period compulsory for all terminals Every washout; period compulsory for all terminals Same as for water gauges Same as for water gauges Same as for water gauges STAT ~ - Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Reducing valve Main cutoff valve on 3eriee FD and IS ' Main rod mechanism, including removal Lubricator compressors and valves, including removal Wash out water tank on tender; control valve; strainer Cleaa boiler elements without removing them from boiler Automatic Braking Equipment Periodic Inspection Compressors Simple and tandem- type locomotives Compound-type loco- motive Brake equipment parts Examination Compressors Simple and tandem- type locomotives Every washout; period compulsory for all '.erminale Series FD, IS, Ms 12,000-15,~ ~ Othe= road-service locomotives every washout Switching lacomotivess at least every 3 months Section-type rings: 25,~-3~,~ kilometers Plain rings: 1e,5~-15,~0 kilometers Except on Series FD and IS, cylinders on all aeries :.:moved for inspection. On FD and IS, cylinders can be inspected during washout repairs without removing rod from crosshead 12,000-15,~o kilometers. A spotter made of magnifying glass is used tc inspect rods after they are covered with chalking compound 25,000-30,000 Every washout; compulsory for all termi- nals Freights 1j,000-20,000 kilometers Passenger: 20,000-30,000 Freights 8,000-10,000 kilometers Passengers 10,000-15,000 " Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Compound-type loco- motive Pushing, switching, export, other noa- traia locomotives Hydraulic Testing of Air Reservoirs Main and auxilliary Every 3 Yew's reservoirs Special Equipment on Engines Using Condensed Steem flexible connections Feed pump lubricator Wash out water tank Valves: feed, close, reverse, control Clean the shafts and cooler sections 12,000-15,000 20,000-25,000 kilometers; is case of im- pure water due to floods or heavy rains, every washing out period Every washing out period 12,000-15,000 kilometers As soon as s11me is detected in lubricant Special Equipment on Engines Using Water Heaters Filter Every washing out period Hot-water cutoff Supply valve Water-level indicator Water feed pump Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Declassified in Part - Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2 Steam chest, steam effector, reverse valve By-pnea valve Clean out cold-water cut- off, cutoff valve, and relief valve Throttle and 11ve steam connections RffiTRICTED Declassified in Part _ Sanitized Copy Approved for Release 2012/02/08: CIA-RDP80-00809A000700110573-2~