NEW USSR PETROLEUM, COAL, PEAT MACHINERY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700150387-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
September 13, 2011
Sequence Number:
387
Case Number:
Publication Date:
December 14, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 147.69 KB |
Body:
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
CLASSIFICATION corrPlnElrrlAL
S rnUURRT .. I PQt?i?11\~. ail
CENTRAL Ilvl`~LLIf;~Gc~AGEtvcr
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS
COUNTRY ussR
SUBJECT Economic; Technological - Fuel extraction and
handling equipment
HOW
PUBLISHED Daily newspapers
WHERE
PUBLISHED USSR
DATE
PUBLISHED 12 Apr - 15 Jul 195
LANGUAGE Russian
Ir 1, of . S LOCI, '? ?r r0[O.L it lr?r ...~ .nor ? ? r .
~? ~ r i rllr ll 10 Or I?ILI~?1 ?r .r r? . ?i ? r i
.rO. lio[D I
DATE DfST. ~~ Dec 1953
N0. OF PAGES 3
SUPPLEMENT TO
REPORT N0.
As indicated
IiEW USSR PEPROLEUM COAL. PEAT MACHINERY
NEW UNDERREAMERS, BRAKES -- Baku, Bakinskiy Rabochiy, 1 May 53
The Haku Kishlinakiy Mactiiae Building Plant, successfully meeting its
production plan, this year produced for the first time the following
items: underreamers for use with turbine drills, single- and double-rotor
hydromatic brakes, a device for securing the dead end of cables under deep
drilling conditions, and other equipment for the petroleum industry. Pro-
duction of light draw works and cf winches for use in electric coring is
being established..
NEW PIPE-LAYING MACHIDIF -- Leningradskaya Pravda, 2 Jul 53
The Leningrad I4achinery Plant of the Ministry of the Petroleum In-
dustry USSR has completed and is testing, machii;ea of a new design for laying
pipelines, including gas mains, transversely under roads or railroads with-
out interrupting traffic..
OIL WELL, PIPELINE EQUIPMENT -- Petrozavodsk, Leninskoye 7.namye, 14 Jul 53
The Moscow Experimental Machinery Plsnt of the Ministry of the Petraletun
Industry USSR has sent to oil fields the first lot of cement mixers for use
in cementing oil wells. These mixers deliver 20 ?ona of cement in 15-20
minutes.
A new design has been worked eut for a rotary ditching machines to be
used in laying main pipelines and gee seine. Also of interest is a new
bulldozer with a ~orizontally~ pivoted blade, which can be used in filling
up trenches after the pipe has been laid.
STATE
ARMY
DISTRIBUTION
~~
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
The Baku Machine Building Plant imeni Sardarov has assembled its first
toxer for extra-deep drilling, and has produced the parts for ten more.
SERIES-PRODUCE OIL-DRILLPdG U27IT __ Moscox,Izvestiya, 15 Jul 53
The verdlovsk Uralmaeh Plant imeni Ordzhonikidze has established
aeries production of the Uralmash-5D oil-drilling unit.
TOWERS FOR EI{'TRA_DEEP DRILLING -- Baku, Bakinekiy Rabochiy, 23 May 53
MODIFY WAIXIIlG EXCAVATOR -- MJBCOw, Komeomol'ekaya Pravda, 31 May 53
At the Sverdlovsk Urelmash Plant, it has been decided to equip a
xaiking excavator, nox being assembled, xith a bucket of 20-cubic-meter
capacity. Designers are also xorking on an excavator xith a 35-cubic-meter
bucket capacity and a 100-meter boom
Moscox, Izvestiya, 1 Jul 53
The SverdlovsY. Uralmash Plant has completed a walking excavator xith a
bucket capacity of 20 cubic meters and a 65_meter boom. The nex machine is
a development of former models xith bucket capacities of 10 and 14 cubic
meters. The boom and winches have been modified.
The excavator is to be used in open-pit coal mining.
Dloecow, Vechernyaya hfoskva, 1 Jul 53
Use of the 20-cubic-meter bucket raises the productivity of the
Sverdlovsk Uralmash Plant's nca walking excavator 30 percent over that.
of previous models.
bloecow, PravP~, 1 Jul 53
The Sverdlovsk Uz?sLnash Plant's new excavator is designated the
ESh-20/ti5 .
WORK WITH MODIFIED COhIDINE -- Tashkent, Pravda Vostoka, 15 May 53
The GorlovY.a Plant imeni Kirov and engineers of the "Aleksandr_zapad"
mine have modified a UKMG combine for xork on thin, steep-pitching seams.
The combine has extracted its first tcuie of coking coal from such a seam.
SERIES PRODUCE MINE E;LEVpTORS -- Leningradskaya Pravda, 2 Jul 53
The Novo-Kramatorsk Plant imeni Stalin has established series pro-
duction of electric mine elevators,
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
50X1-HUM
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
Sanitized Copy Approved for Release 2011/09/13: CIA-RDP80-00809A000700150387-5
PRODUCE PEAT MACA~iERy __ Minsk, Sovetskaya Belorussiya, 12 Apr 53
The Ivanoro Peat Machinery Plant has sent the Karinskiy enterprise of
the Kirov Peat Trust ari electric, self-propelled machine designated the
UPF-2, Yor gathering and transferring milled pest. The new machine can
gather and lay out 900 cubic meters of peat per hour. Despite its great
size, the machine is highly maneuverable, and requires cnly tr+o operators.
Since the beginning of the year, the plant has shipped 24 peat-
gathering machines, a large number of excavator attachmAnts for breaking
frozen earth, high-pressure peat pampa, and spare parts to the peat enter-
prieee of Moskmrekaya, Leningradakaya, and Kalininekaya oblasta and to the
Belorussian and Lithuanian SSRso
Moacorr, Trud, 2 Jul 53
The Ivanovo Peat Machinery Plant has constructed a new machine for
clearing timber from peat fields and ataci:ing it. The machine is
essentially an excavator with the boom and shovel replaced by a disk
Barr and a stacking device. It is designated the ESL-4.
RAISE PRODUCTNTPY OF PEAT MACRINES __ Tashkent, Prav3a Vostoka,
10 Jul 53
The Leningrad Lentorfmash Plant has completed 30 new self-propelled
machines for gathering milled peat. Their productivity is three times
that of existing machines.