PLAN FULFILLMENT OF SOVIET AZNEFT' ASSOCIATION FOR FIRST HALF OF 1953
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700160080-4
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
5
Document Creation Date:
December 22, 2016
Document Release Date:
September 8, 2011
Sequence Number:
80
Case Number:
Publication Date:
January 13, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 186.86 KB |
Body:
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
COUNTRY USSR - Azerbaydzhan SSR DATE OF
FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO.
CLASSIFICATION CONFIDENTIAL
CENTRAL INTELLIGENCE AGENCY REPORT
.-- -- _, ..-....r,.. .o
WHERE
PI IRI is uGn naoo
DATE
PUBLISHED 2 Jun-15 Aug 1953
.4.~,,.,, .. ~... ,........,....._ ~.._...__....
PLAN FULFILLhIEt7T OF SOVIF,T AZNEFT' ASSOCIATION
FOR rr^IRST fL4I.F OF 1953
On 3 July 1953, Bakinskiy Rabochiy reported that the Azneft' Associa-
tion had fulfilled the half-year plan for production of petroleum. The same
newspaper reported on 4 August 1953 that the Azneft' Association had ful-
filled the gross-production plan for the first half of 1953 by 100.3 percent.
According to Bakinskiy Rabochi of 22 July 1953, the directors of the
Azneft' Association were content in the knowledge that the petroleum indus-
try of the Azerbaydzhan SSR, as a whole, xas fulfilling the state plan, and,
as a consequence, had failed to take note oP the lagging sectors of the as-
sociation. The newspaper further reported that little was being done to
create the necessary conditions for overf ulfillment .,f the plan by each en-
terprise, and that it xas not accidental thst xithin the Azneft' Association
3 trusts, 30 oil fields, and 110 brigades had failed to cope xith the half-
year assignment.
~he following table gives information from June-August issues of Bakin-
skiy Rabochiy and other newspapers on the fulfillment or nonfulfillment of
the petroleum production plan for the first 6 months of 1y53 by trusts and
oil fields of the Azneft' Association. While no information on some of the
apProximat lv 15 trusts, of the association was found in Soviet newspapers
fill the plan, and contradictory information is given for one trust. -The~j
following source abbreviations are used in the table: BR -- Bakinskiy Ra-
bochiy (Baku); SM -- Sovetskaya Moidaviya (Kishinev); Tr -- Trud (Moscow);
Iz -- Izvestiya (Moscow)_]
STATE
ARMY
NAW
AIR
NSRR -i)
FBI I
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Oil Fields No 2
and 4
011 Field ido 3
ARTEb1NEFT' TRUST
rulfillment of Petroleum Production Plnns for :first Half of 1953
by Tx?usts and Oil Fields of the .,zaeft' Association
Fulfillment Data Additional Data Source
Failed to cope ::ith half-year aasiCnment. BR, 3 Jul 53
Fulfilled half-,;ear plan L2dote: Contra- ;lumber of operating oil wells in- BR, 1 Jul 53
diets above report Production of creased by 30 LdurinG 1953_j; h2
petroleum decreased recently. oil wells were transferred i'rom
the comnre:=ser mei;hod o,' opera-
tion to the deep-well pump method.
Failed to fulfill plan.
Fulfilled plan ahead of schedule.
~Ad,joins
This field is one of the oldest in
the trust and cmu,ot count much on
production to be obtained from new
BR, 1 Jul 53
Since the beEinning of 1953, the BR, 30 Jun 53
number of operating wells has in-
crcased by 25, and 18 oil wel c
have been transferred to the deep-
well pump method of operation from
the compresses method.
Not fulfilling daily assignments. BR, 1 Jul 53
Maintenance of operating xells be-
ing neglected. During past months,
cost of production per ton of petro-
leum has substantially exceeded the
plan coat.
here
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
LAdjoius page 2 here)
Enterprise Fulfillment Data Additional Data Source
:'1 Field No 3 First oil field in the Azr~eft'
Association to fulfill the half-
yeer plan for production of
liquid fuel.
Oil Field No 4 Failed to fulfill assignment.
KIROVNEFT' TRUST Fulfilled plan. Produced unstated
amount of petroleum above the plan.
Cost of production per ton of petro- BR, 27 Jun 53
leum was 4 percent lower than called
for by the plan.
Txo sectors under compreaser opera- BR, k Jul 53
tion. Number of operating wells has
increased by only one since begin-
ning of 1953? Daily production level
has decreased by tens of tons.
Oil Field No 1 Fulfilled plan ahead of schedule,
and produced hundreds of tons of
fVel above the plan.
Oil Fields No 2, 3, Fulfilled plan ahead of schedule.
and 6
LENINNET'P' TRUST Fulfilled the plan because of the
outstanding xork of its leading oil
fields.
Number of operating wells increased
by 12 over the January 1953 number.
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
LFd,joins page 3 here)
Enterprise
Oil Fields No 1, 2, 9,
11, and 13
Oil Field No 8
MOLOTOVNEFT' TRUST
Oil Fields No 2, j,
and 7
Oil Fields No 1; 3,
and 4
Fulfillment Data
Failed to f-ulfill the 6-month plan
for production of fuel.
Fulfilled plan because of the out-
standing performance of its lead-
ing oil fields.
First field in the trust to fulfill
the plan.
~No dates
Fulfilled plan on 23 June.
Fulfilled plan 8 days ahead of
schedule.
BR, 5 Jul 53
Cost of production per ton of petro- BR, 30 Tun 53
leum xas 2.4 percent loxer than that
called for by the plan. Ho.k at
many oil fields deteriorated in June.
Coat of production per ton of petro- Tr, 19 Jun 53
leum loxered by 5 percent. 11 oil
xells converted to the deep-xell
pump method of operation since the
beginning of 1953?
Beginning ir_ M.y, a more marked de-
crease in production occurred at
these fields. 011 Fields No 1 and
3 lagged moat.
Production increased by 14 percent
over the beginning of 1952? Number
of operating xells increased by lv
(during 195?
~djoins page 5 here
BR, 15 Aug 53
BR, 24 Jun 53
BR, 24 Jun 53
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
LAd,~oine page 4 here
Enterprise Fulfi~.lment Date
ORDZROIiIKIDZENEFi' TRUST Fulfilled plan ahead of schedule.
Oil Fields No 1, ~~, LNo datJ
6, 8, and Gousanskiy
Oil Field
Bukhta Il'ich Oil Fulfilled plan on 19 June.
Field
BR, 24 Jun 53
BR, 30 Jun 53
Iz, 21t Jun 53
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4
Additional Data Source
Daily production level increased by BR, 1 Jul 53
1.1 percent; productivity of labor in-
creased by 1.5 percent. 27 oil wells
were transferred from the compreaser
method of operation to the deep-well
pump method. Number of operating wells
increased by 26 during 1953.
Were responsible for the trust's ful- BR, 1 Jul 53
filling the plan ahead of schedule.
production per ton of petroleum
lowered by 2.5 percent.
Daily production level increased by
2.4 percent. Insufficient attention
being given to lowering the coat oi'
production, which has increased sub-
stantially as against the plan.