PLAN FULFILLMENT OF SOVIET AZNEFT' ASSOCIATION FOR FIRST HALF OF 1953

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700160080-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 8, 2011
Sequence Number: 
80
Case Number: 
Publication Date: 
January 13, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700160080-4.pdf186.86 KB
Body: 
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 COUNTRY USSR - Azerbaydzhan SSR DATE OF FOREIGN DOCUMENTS OR RADIO BROADCASTS CD NO. CLASSIFICATION CONFIDENTIAL CENTRAL INTELLIGENCE AGENCY REPORT .-- -- _, ..-....r,.. .o WHERE PI IRI is uGn naoo DATE PUBLISHED 2 Jun-15 Aug 1953 .4.~,,.,, .. ~... ,........,....._ ~.._...__.... PLAN FULFILLhIEt7T OF SOVIF,T AZNEFT' ASSOCIATION FOR rr^IRST fL4I.F OF 1953 On 3 July 1953, Bakinskiy Rabochiy reported that the Azneft' Associa- tion had fulfilled the half-year plan for production of petroleum. The same newspaper reported on 4 August 1953 that the Azneft' Association had ful- filled the gross-production plan for the first half of 1953 by 100.3 percent. According to Bakinskiy Rabochi of 22 July 1953, the directors of the Azneft' Association were content in the knowledge that the petroleum indus- try of the Azerbaydzhan SSR, as a whole, xas fulfilling the state plan, and, as a consequence, had failed to take note oP the lagging sectors of the as- sociation. The newspaper further reported that little was being done to create the necessary conditions for overf ulfillment .,f the plan by each en- terprise, and that it xas not accidental thst xithin the Azneft' Association 3 trusts, 30 oil fields, and 110 brigades had failed to cope xith the half- year assignment. ~he following table gives information from June-August issues of Bakin- skiy Rabochiy and other newspapers on the fulfillment or nonfulfillment of the petroleum production plan for the first 6 months of 1y53 by trusts and oil fields of the Azneft' Association. While no information on some of the apProximat lv 15 trusts, of the association was found in Soviet newspapers fill the plan, and contradictory information is given for one trust. -The~j following source abbreviations are used in the table: BR -- Bakinskiy Ra- bochiy (Baku); SM -- Sovetskaya Moidaviya (Kishinev); Tr -- Trud (Moscow); Iz -- Izvestiya (Moscow)_] STATE ARMY NAW AIR NSRR -i) FBI I Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Oil Fields No 2 and 4 011 Field ido 3 ARTEb1NEFT' TRUST rulfillment of Petroleum Production Plnns for :first Half of 1953 by Tx?usts and Oil Fields of the .,zaeft' Association Fulfillment Data Additional Data Source Failed to cope ::ith half-year aasiCnment. BR, 3 Jul 53 Fulfilled half-,;ear plan L2dote: Contra- ;lumber of operating oil wells in- BR, 1 Jul 53 diets above report Production of creased by 30 LdurinG 1953_j; h2 petroleum decreased recently. oil wells were transferred i'rom the comnre:=ser mei;hod o,' opera- tion to the deep-well pump method. Failed to fulfill plan. Fulfilled plan ahead of schedule. ~Ad,joins This field is one of the oldest in the trust and cmu,ot count much on production to be obtained from new BR, 1 Jul 53 Since the beEinning of 1953, the BR, 30 Jun 53 number of operating wells has in- crcased by 25, and 18 oil wel c have been transferred to the deep- well pump method of operation from the compresses method. Not fulfilling daily assignments. BR, 1 Jul 53 Maintenance of operating xells be- ing neglected. During past months, cost of production per ton of petro- leum has substantially exceeded the plan coat. here Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 LAdjoius page 2 here) Enterprise Fulfillment Data Additional Data Source :'1 Field No 3 First oil field in the Azr~eft' Association to fulfill the half- yeer plan for production of liquid fuel. Oil Field No 4 Failed to fulfill assignment. KIROVNEFT' TRUST Fulfilled plan. Produced unstated amount of petroleum above the plan. Cost of production per ton of petro- BR, 27 Jun 53 leum was 4 percent lower than called for by the plan. Txo sectors under compreaser opera- BR, k Jul 53 tion. Number of operating wells has increased by only one since begin- ning of 1953? Daily production level has decreased by tens of tons. Oil Field No 1 Fulfilled plan ahead of schedule, and produced hundreds of tons of fVel above the plan. Oil Fields No 2, 3, Fulfilled plan ahead of schedule. and 6 LENINNET'P' TRUST Fulfilled the plan because of the outstanding xork of its leading oil fields. Number of operating wells increased by 12 over the January 1953 number. Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 LFd,joins page 3 here) Enterprise Oil Fields No 1, 2, 9, 11, and 13 Oil Field No 8 MOLOTOVNEFT' TRUST Oil Fields No 2, j, and 7 Oil Fields No 1; 3, and 4 Fulfillment Data Failed to f-ulfill the 6-month plan for production of fuel. Fulfilled plan because of the out- standing performance of its lead- ing oil fields. First field in the trust to fulfill the plan. ~No dates Fulfilled plan on 23 June. Fulfilled plan 8 days ahead of schedule. BR, 5 Jul 53 Cost of production per ton of petro- BR, 30 Tun 53 leum xas 2.4 percent loxer than that called for by the plan. Ho.k at many oil fields deteriorated in June. Coat of production per ton of petro- Tr, 19 Jun 53 leum loxered by 5 percent. 11 oil xells converted to the deep-xell pump method of operation since the beginning of 1953? Beginning ir_ M.y, a more marked de- crease in production occurred at these fields. 011 Fields No 1 and 3 lagged moat. Production increased by 14 percent over the beginning of 1952? Number of operating xells increased by lv (during 195? ~djoins page 5 here BR, 15 Aug 53 BR, 24 Jun 53 BR, 24 Jun 53 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 LAd,~oine page 4 here Enterprise Fulfi~.lment Date ORDZROIiIKIDZENEFi' TRUST Fulfilled plan ahead of schedule. Oil Fields No 1, ~~, LNo datJ 6, 8, and Gousanskiy Oil Field Bukhta Il'ich Oil Fulfilled plan on 19 June. Field BR, 24 Jun 53 BR, 30 Jun 53 Iz, 21t Jun 53 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160080-4 Additional Data Source Daily production level increased by BR, 1 Jul 53 1.1 percent; productivity of labor in- creased by 1.5 percent. 27 oil wells were transferred from the compreaser method of operation to the deep-well pump method. Number of operating wells increased by 26 during 1953. Were responsible for the trust's ful- BR, 1 Jul 53 filling the plan ahead of schedule. production per ton of petroleum lowered by 2.5 percent. Daily production level increased by 2.4 percent. Insufficient attention being given to lowering the coat oi' production, which has increased sub- stantially as against the plan.