PRODUCTION OF SOVIET HOIST AND TRANSPORT MACHINERY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700160178-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 8, 2011
Sequence Number: 
178
Case Number: 
Publication Date: 
February 1, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700160178-6.pdf118.32 KB
Body: 
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160178-6 CLASSIFICATION CONFIDENTIAL JJ CENTRAL INTELLIGENCE AGENCY REPORiI INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS CD N0. SUBJECT Economic; Technological - Hoist and transport INFORM.gTION 1953 COUNTRY USSR DATE OF LANGUAGE Russian PUBLISHED 21 Jul _ 13 Sep 1953 WHERE PUBLISHED USSR DATE machinery HOW PUBLISHED Daily newspapers x0 TI[. YI TML Y.I. coo[. 4 u?xpLD. ITI Uu.gIO ILx YT RvL. xT10x 01 Iii LOX TIM TI TL OA L[L[I/T IT Ix yI~YTx011 l1y I[[/Lw It DATE DfST. / Fc-g /9S NO. OF PAGES 2 SUPPLEMENT TO REPORT N0. THIS IS UNEVALUATED INFORMATION PRODIICTION OF SOVIET HOIST AND TRANSPORT MACHINERY TO PRODUCE NEW CRANE __ Minsk, Sovetskaya Belorussiya, 14 Aug 53 For 3 years the Borisov Proletarskiy Molot Plant has been producing Pioner construction cranes. The Pioner, of very simple design, can be disassembled and installed on a special platform on any floor of the building under construction. It can hoist 300 kilograms to a height of 20-22 meters at a speed of 0.25 mete: per second, and can turn through a full circle. The crane is powered by an elec- tric motor. The plant is soon to put into production the KP-3 crane, with a hoisting capacity of 500 kilograms. NEW TOWER CRATE WITH "MICRODRIVE" -- Moscow, Vechernyaya Moskva, 18 Aug 53 The Kuybyshev Construction Machinery Plant has established production of a new tower crane which caT. lift a 5-ton load to a height of 61 meters. The crane ie powered by six 60-kilowatt electric motors. It has a boom 22.5 meters long, and a special "microdrive" for laying large blocks accurately in place. NEW CRANE HAS DOUBLE CAPACITY OF SBK-1 -- Leningradskaya Pravda, 21 Jul 53 The Yasinovataya Machine Building Plant has shipped to Moscow a new SBK-2 mobile tower crane to be used in the construction of tali buildings. The crane is 70 meters high and neighs over 100 tons. It can raise a 5-ton load to a 20- story height at a rate of 35 meters per minute. It has almost double the hoist- ing capacity of the SBK-1. The crane operator's cab, located at a height of 12 stories, is equipped with a radio speaker for communication with the other construction workers. 50X1-HUM STATE ARMY NAW AIR DISTRIBUTION Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160178-6 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160178-6 SHIP OVERHEAD CRANE -- Tbilisi, zarya Vostoka, 13 pug 53 The Leningrad Hoist sad Transport Equipment Plant imen: Kirov has sent an electric overhead traveling crane with a hoisting capacity of 75 tons to the Tbilisi Locomotive Repair Plant. CLAMSHELL CRANES GO TO RIVER PORTS -- Kiev, Pravda Ukx?a1nY, 5 Aug 53 The Riga Machine Building Plant of the Ministry of Maritime and river Fleet has shipped powerful clamshell cranes to Shcherbakov and Comel', and to Irtyah River ports. DELIVER ELEVATOR EQUIPMENT __ Moscow, Vechert~yaya Moskva, 7 Sep 53 In August 1950, when the Moscow 3oko1'aicheskiy Car Repair Pant began producing .cinches and cab frames for elevators, the output was six to eight winches per month. Since then, labor productivity has risen to eight to nine ' times its Former'level. Today, the plant's Technical Control Division received the thousandth set of elevator equipment from the electrical machinery shop. LOWER COST OF REDUCTION UNITS --,Tashkenb, Pravda Vostoka, 13 Sep 53 Reduction units-Produced by the Leningrad Krasnyy Metallist Plant are used in powerful cranes, rolling mills, conveyers, and other machinery. Yesterday, the plant turned out five FM-500 reduction units, on xhich la- bor consumption was more than 20 percent lower than on units produced at the be- ginning oP 1953? Production costs this year have been reduced almost 10 percent, and the plant made a profit of over 3 mi111on.rubles.. . SHIP CONVEYERS FOR CONSTRUCTION WORK --. Vil'nyus, Sovetskaya Litva, 4 Aug 53 The ALma_Ata Machinery Plant of the Ministry of Electric Power Stations and Electrical Industry has sent 15 belt conveyers to the new construction projects of Uzbekistan and the southern Urals. Since the beginning oP 1953, the plant has furnished builders with dozens of conveyers for excavation work and for loading and unloading fuel. 50X1-HUM Sanitized Copy Approved for Release 2011/09/08: CIA-RDP80-00809A000700160178-6