1950 WATER CONSERVATION PROJECTS ON THE CH'I HO AND THE SHU HO IN NORTH KIANGSU

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700170359-4
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 2, 2011
Sequence Number: 
359
Case Number: 
Publication Date: 
April 22, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700170359-4.pdf53.32 KB
Body: 
Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170359-4 STAT Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170359-4 Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170359-4 STAT 1950 WATER CONSERVATION PROJECTS ON THE CH 1 110 AND THE END HO .331 NORTH IS.:IiGSU Kung-ch'eng Chien-she Shanghai, 1 July 1950 Conservation of the waters of the Ch'i Ho and the Shu Ifo is one of the important projects undertaken in North Kian- . The flow of water of the Ch'i H. is 6,000 meters per minute. The highest f'o?,w of water of the Tsao-ho-chen Central Canal is 2,500 meters per minute, and it !s hoped that the flo., of water can be controlled to 1,160 meters per minute. A temporary contracting dike was constructed at Tsao-ho-chen to control the water. After the first period of water conservation work on the Ch'i Ho and Shu Ho, the drainage was contro'-._ed as follows: Chung-chin, new Ch'i Ifo drainer 710 meters per minute Shu Ho drainage 2,5'%') mc?Os per minute Total Liu-t'ang Ho drainage 600 meters per minute Tsao-ho-chen Central Canal dr;,ina~e 1.,21+0 [:ac 1 meter:; per minute Following completion of the dike at neu Chi iio, to 1,350 meters per minute in the mid-stream. The ?.;atertheledveralisn aofge ithnecrteasedempo_ r:a?y reservoirs at Huang-tun Hu and to-m:: flu -.wore lowered. The drainage of Tsao-ho-chen Contracting DIP- was controlled to 1,2110 meters per minute. The drainage was controlled as follows- Chang-shan, new Ch'i 110 drainage Shu 110 drainage Tot+:1 Central Canal drainage Liu-t'ang Ho drainage Total ir_50 meters per minut'= 500 meters per min w.e. 3,350 meters per minute 730 meters per minute 5110 meters per minute I,2i0 me-tors per minute STAT Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170359-4