KWANGTUN IRON AND STEEL MACHINERY PLANT NO 1 SEEKS BETTER HIGH-SPEED CUTTING METHODS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700170439-5
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
September 2, 2011
Sequence Number:
439
Case Number:
Publication Date:
April 29, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 79.75 KB |
Body:
Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170439-5
STAT
Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170439-5
Sanitized Copy Approved for Release 2011/09/02 : CIA-RDP80-00809A000700170439-5
KWANGTUNG IRON AMID STEEL MACHINERY PLANT No 1
SAS BE'T HIGH-SPEED CUTTING METHODS
Rua-nan Kung-kung
Canton, Jan 1952
The Kwangtung Iron and Steel Machinery Plant No 1 has been seeking better
high-speed cutting methods. In June 1951, this plant released a report on the
subject of high-speed cutting method which was devoted primarily to: (1) the
performance of high-speed cutting tools under actual conditions as exhibited in
Peiping under the auspices of the Ministry of Heavy Industry, and (2) a report
written by a Soviet specialist on the basic problems of high-speed cutting.
Following this [June 1951] report, the plant undertook to increase its pro-
ductive capacity with available tools. A project was set up to convert the lathe
into a high-speed cutter and also to familiarize the operators with the construction
and capability of a lathe. One of the requirements in the conversion was to
increase the spindle speed. Among the many machine tools available, the all-
geared lathe, being most suitable for the project, was selected to be inspected
and overhauled for the conversion. During the major overhauling, which required
3 weeks, all parts were thoroughly analyzed.
After the successful conversion of this lathe into a high-speed cutter, tests
of its cutting capability were made. The tests revealed that the workers of this
plant did not have any experience in the use of cutting tools. At the same time,
it was discovered that the grinding machines on hand were not adjusted to grind
cutting tools to the appropriate angles. The workers were sent to the Kwangtung
Machinery Plant to examine the machinery at that plant. As a result of their
study, the workers were able to recondition two lathes aad a milling machine at
the Kwangtung Iron and Steel Machinery Plant No 1 so that high-speed cutting can
be undertaken. In the major overhauling of the milling machine, attempt was made
to increase its maximum spindle speed of 420 rpm, but with the available cutters,
this was not deemed possible. In the reconditioning work an all-geared lathe
with a spindle speed of 720 rpm was also overhauled.
As a result of tests made in cutting iron, copper, and manganese steel castings,
it was discovered that the lower the temperature of the materials being worked on
at high speed, the better the result.
The factors which made it difficult for the Kwangtung Iron and Steel Machinery
Plant No 1 to successfully complete its aims in this project were as follows:
1. Since the composition of the hard alloys available on the local market
was unknown, the special characteristics of these metals could not be used to
best advantage.
2. Cutters made by the welding process were not of the best quality.
3. Hard alloys and grinding wheels were difficult to purchase.
4. The production of numerous types of commodities by this plant made it
impossible to take full advantage of the discoveries made in the use of hard-
alloy metals in the mass production of' any single commodity.
5. Since the composition of the cutting gears could not be determined, the
spindle speed could not be increased to any great extent.