ECONOMIC - TRANSFORMERS, POWER STATIONS, BIOGRAPHIC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700220176-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 15, 2016
Document Release Date:
August 12, 2003
Sequence Number:
176
Case Number:
Publication Date:
April 9, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 95.38 KB |
Body:
Approved For Release 2003/09/03 : CIA-RDP80-00809A000700220176-8
MAR 1952 '-L-D1'
25X1
25X1
25X1
25X1
CLASSIFICATION CONFIDENTIAL
CENTRAL ---._-..,,_ ,,,;",,,,
COUNTRY Bulgaria
SUBJECT Economic - Transformers, power stations,
biographic
HOW
PUBLI^HED Biweekly newspaper; monthly periodical
WHERE
PUBLISHED Berlin; Sofia
DATE
PUBLISHED Aug - Sep 1952
LANGUAGE German; Bulgarian
O, ,-1 u., CCO.. I .Y--. .., ...>a.-- O. .uf.
l ?O> .1 ,.. CO..In,C ,ry C' 7.. ..... I1
..............,.. --- - ..,.on., C1,1?,
DATE DIST. 9 Apr 1953
NO. OF PAGES 2
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
CONSTRUCTION OF RESERVOIR., POWER STATIONS,
TRANSFORMER FRODTJCTION AT BULGARIAN PLANT
TWO NEW ffYDROELECTRIC STATIONS JNDER CONSTRUCTION -- Berl_n, Aussenhandels-
Nachrichten, '3 Sep 52
A large reservoir, called Rostroy, is being built or. the middle reaches
of the RcSitsa River in northern Bulgaria, The reservoir_ Is 18 kilometers
it w_,11 ht-e rrr, area of 800 square k.14.,r;te.r [sip, (_nd .:i].1 .tore 220
ici ... ,.cn cubic rrei rr-, of water. T?wa hydro Nle t: _c
power _tatlon, are being
uiIt at thi= ,~ ,- vols. When completed, they will Y Ili groc,a?:o ;:O mili'cr k1]o-
'.r 1t-hour annc&]iy? The wate- frog the reserv
- cis will rigate !h :-xteas;ve
iowla d_ 1-set ,;f the Yartra River, therety making 35C, 1 brctare_ of '_and ara.de.
Construction of the reservoir is proceeding rapidly. The dam, with a
length of 320 meters, has already been built. One of the two Dower plants
has already begun partial operation and is furnishing electric current for
the construction project and for neighboring villages. Provision fcr the
inhabitants of two flooded villages is being made in new eettlemen.s at the
foot of the Iaibar Mountain below the dam.
Construction of the dam and the entire irrigation system Niii be completed
oy the end of 953
R'JELDS 1:,500-KaovOLT-AMPERE TRANSFORMER -- Sofia, Elektroenergiya, Aug - Sep 52
lfriform&tion or. graphics material is I,ppended..7
At the beginning of 1952, the "Vasil Kolarov" Plant of the "Elprom"
(Eiecr,rical Industry LEnterpris ]) produced the first 5,600-kilovolt-ampere
transformer, operating at voltas-s of 66,000 and 6,300 volts Later, trans-
1ormere with the same kilovolt-ami.~re rating, but operating at 110,000 and
35,000 volts, wer,, produced, In Apr.1 1952, the plant was ordered to produce
between 1 May and 9 September 1952 a 12,500-kilovolt-ampere transformer oper-
ating at 121,000 and 63,000 volts. This transformer was completed on 31 August
195., 9 days before the deadline. Workers of the plant will soon begin the
or,z?t r is ;:ion of a cO,000-kilovolt-ampere transformer.
CLASSIFICATION CONFIDENTIAL
LgrATC NAVY ~, NStafi
_..DISTRIBUTION
II Rid?li AIH I....._. ____
Approved For Release 2003/09/03 : CIA-RDP80-00809A000700220176-8
Approved For Release 2003/09/03 : CIA-RDP80-00809A000700220176-8
25X1
Taring 1952, the Plovdiv, Kurdzhali, and Konski dol Substation=_ have begun
operation,
The 110,000-volt power line between Dimitrovgrad, Kurdzhal.i, and Konski dol
was completed before the deadline, The power line was produced in Bulgaria, and
most of the equipment of"the substations is also of Bulgarian make.
During 1952, the machines of the following power stations were exceptionally
well repaired (obraztsov r?emont): "Mezdra" VETS (Hydroelectric Power Station)
Lin b zd.r7, "Petrovo" VETS `bn Petrov27, and "Yanko Kostov" TETe Steam-Heat and
Electric Power Station)-
The enco-.:.ragement of Georgi Todorcv, in charge of production ard. payments
for the Central Committee of the Electri.al Workers Union: and active mem*.ez of
the "Vasil Kolarov" Plant trade union committee, caused Engineer Nicho Todorov,
chief tecanologiet at the plant, Engineer Lukov, and Soviet spec.alist Serogin,
ale.> at the place, to no out,tar,dtog work during 1952
25X1
25X1
Requests for copes of, or further information or., the photograph
1"~- c rlbe3 r.= re.n shoui _ Ge udc e,s~ I to Graphi: e Fe 1Fte_ ,
i==v t c _pc_ t: n,~mber g t_A, by re-
:.d te:m numhe r
Lo- atior, B'a~ar_a, Sofia, "Vatell Kolaroy" Plant
Lact.cr, & rd of transformer /
-~.-:>?o:t ampere traneforme
r completed at the play or.
Photograpm Dee_rlptior, S:ze, 3 x 143 inches, .fa._,
I Elek-rcener,,iy, Sofia, Augue;t - September '`9;2, 7