CONSTRUCTION OF TUGS IN ODER SHIPYARDS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A000400630005-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 21, 2016
Document Release Date: 
February 3, 2009
Sequence Number: 
5
Case Number: 
Publication Date: 
March 11, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A000400630005-6.pdf42.74 KB
Body: 
Approved For Release 2009/02/03: CIA-RDP80-0081 OA000400630005-6 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SECRET/CONTROL U.S. SECURITY INFORMATION Poland This Document contains Information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.B. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person 1s prohibited by law. The reproduction of this form Is prohibited. REPORT DATE DISTR. 11 Nlerch 1953 SUBJECT Constructtion of Tugs in Oder Shipyards DATE OF INFO. PLACE ACQUIRED NO. OF PAGES 1 REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. 1. The Ministry of Shipping instructed the shipyards of the Oder River to construct tugs strictly in accordance with Soviet models and technical documentation. 2. These tugs have steam engines,, with coal as fuel, of 200 hp, and 400 hp,, and twin screws. The following are the dimensions of the tugs: Type 200 ' otal length 47.8 meters Total beam 15.3 meters jzaught when loaded with 40 tons of fuel .8 meters Tae I+00 hp. 57.9 meters 17.5 meters w1 n loaded with 70 tons of fuel 1.05 meters --~ ---?~--may - ~.u. vrr.LUlxi.`T U1VLY STATE X ARMY NAVY : X JAIR IX FBI _7 EC E A :Note: Washington Distribution Indicated By "Xj'1 Field Distribution By Approved For Release 2009/02/03: CIA-RDP80-0081 OA000400630005-6 25X1