CRANES TO BE BUILT DURING 1953 BY KRANBAU EBERSWALDE FOR REPARATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A000500120008-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 14, 2016
Document Release Date: 
May 25, 2001
Sequence Number: 
8
Case Number: 
Publication Date: 
December 1, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A000500120008-5.pdf254.89 KB
Body: 
Approved For Release 2001/08/22 : CIIA-RDP80-0081OA000500120008-5 CLASSIFICATION SECURITY INFORMATION CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. COUNTRY East Germany DATE DISTR. SUBJECT Cranes to be Built during 1953 by Kranbau NO. OF PAGES PLACE Eberswa;lde for Reparations NO. OF ENCLS. ACQUIRED (LISTED BELOW) DATE OF 25X1A SUPPLEMENT TO INFO. REPORT NO. "Narjad"? Number Approximate Number of hrticle Value in Thousands hrticles of D :1. THIS IS UNEVALUATED INFORMATION 25X1X 1,; On 26 November 1952 the Administration for Rep-retions of the SCC (Verwa1_tung fuer Reparationen SK'CD) inforned ?d3US Kranbau hberswalde that it ~tius to construct 34 cranes for reparations in 1953? Specifications for part of the cranes had already been forwarded to rberswalde, The +'+dr:inistration se-t up the_. following delivery schedule for the cranes: P pril Fay June July 5 1-.ugust. 5 S ept: enb er 5 October 4 November 3 2? Kranbau therswa.lde wil actually have to rianufacture 36 cranes for reparations in 1953, since orders for two additional cranes wore already on hand before the Adrinistration's letter of 26 November. As of 4 December 1952 specificat: ons for the fo j_lowing 28 cranes had been turned in to iberswalde: Order Nu1;:ber 52ll6 R '10/30425 2 Gantry cranes 10 tons x 25 rasters (?..ith grab and lifting hook); working temperature: -250C R 70/30421 3 Gantry cranes 10 tons x 32 meters (with grab and lifting hook); working temperature:-250; Probable Deliver Dete 1:,040 20 i~.arch/ 30 f _arch 1953 1,938 25 April/ 5 i::ay/ 15 i%ay. 1953 5 Rotary-tower cranes 2.,5- 6 1i,670 tonsx 32 ? 34 meters (with grab); working Cenpperature: -250C CLASSIFICATION SECRET AIR To Ev r 20 ;-.ay/5 June/ 20 June/5 Jule=-,d 20 July 1953 Approved For,Release 2001/08/22 : CIA-RDP80-0081OA000500120008-5 Approved For Release . j8/22 : CIA-RDP80-0081OA0005001200 5 Ordw umber "Naryad" Numb r Nu ab. r of ll `sa3 112 52L I 512305 5121309 2 5121122 ` , 5M323 7 5121322 `i 5221294 2 5121292 2 App?_-jximate Article Value in Thousands (Z UM. ; Gantry crane 8 =3J0 1?400 tons x 28 ? 8 aneO-Lars (with grab and 1lifting hook) Q working. ~t,e:mpera== sure: 4m? Gantry cranes 115 tons x 1?70t 8 =}0 meters;; working temperatura: ~5?C Gantry crr year; 10 tons x . 1,292 32 rr otera (wilth grab and lifting hook)) wafting temperature: -40?C Gantry crane t - 30 tons x 1,4 30 - 6 met err+ + ((with grab and 'lifting hook);; working s ,Breamerature;,-14 Gantry cranes 10 tones x 4,, 380 ;30 meters ((with grab and lifting hook));; working temperature 00C Gantry crane :10 tons x 640, 3cmeterrs (with grab and lifting hook),; working temperature: - }00C. Gantry cranes 10 tone x la,t40 8 .- 25 meters (with grab and lifting hook); working temperature; ...25?C Probable Deliver Date 22 August 1953 7 Augwst/ 15 August 1953 7 April/ 16 April 1953 30 August 1953 10 June/ 26 May/ 30 June/ 10 Jul yl 15 July/ 25 July/ I. August 1953 30. ,y 1953 5 S ept emberr/ 10 September 1953 Gantry cranes 15 tons x 1700 15 Sept ember// 8 25 meters (with grab 20 September 1953 and lifting hook); working temperature: -259C 3.. The 28 cranes ordered so far will therefore cost approximately 18 million ME:. The 8 cranes for which no specifications had been received as of 4 December 1952 will cost about six million DME? Thus about 24 million DME from Eberswalde wil go exclusively for reparations in 1953. In addition, deliveries for the first quarter for which the raw material is already on hand amount to about 5 million DIE; of this sus about 3?7 million DME are for P 2 deliveries.. For the deliveries for the , first quarter of 1953 kberswalde is relying on the contractual approval (vertraglicher Zusagen) of the ordering party,, Dleichert of SAG Tranvnash,. 4:. An electrically powered bridge crane for Polienex, Warsaw,, worth approximately one million D2E is not included in the deliveries mentioned above, All except 135 tons of the raw material for the bridge crane is on hand at -'berswalde, Very little of the raw material for a second bridge crane for Polimex is on hand,, and it Is probable that the crane will not be delivered to Polimex in 1953y, if at all; Polimex may cancel the order completely since the crane is needed only for the months from Marc, to September each year, Planned K.rynbau :rlerswal.de production (presumably non-=reparations production) .for the first quarter of 1953 is as follows: Artics:.e Purchaser Approximate Value in Thousands of DME 1 Grab,, 0,, 5 cu., m capacity Kunstseidenwerrk Prre nits 4 1 Round timber grab (Rundholz grtieifer) Zellstoffwerkk Merrseberg .7 Parts for crane superst-u, tur?e and substructure for 5 f1?~aatir g 81ed1.;.:c 2 Leipzig 3,710?. cranes 15 toms x 25 getters. Approved For Release 2RQ,%22 : CIA-RDP80-0081OA000500120008-5 Approved For Release 200110 2 : CIA-RDP80-0081OA000500120008-5 Article Purchaser I Bridge crane 15 tons SchiffewerftOdorberg 250 2 Gantry cranes 10 tons Y. 25 meters., spare parts and Soviet Control Commission 90 packing for same b? Thus, the situation at Kranbau 1berswalde is as follows: Plan production (Planauflage) for 1953 24,000,000 DME 1953 Reparations Orders 240001,000 DMA; Deliveries for the firaaat a?ter 1953 5,000,000 DME Preliminary work on the bridge crane for Polimex 1,O00;,000 Du E IKranbau iberswalde will therefore have to withdraw from remaining 1952 contracts amounting to about 9,500,000 DME, T. On 6 November 1952 the Main Administration for Heavy Machine Construction of the Ministry for Machine Construction ordered a:berswaalde to subcontract for direct reparations orders with ABUS Foerderaaanlagen Leipzig=, The suggested amount was three million DME? On 20 November 1952, however, the Main Adminiasatrati a wrote Eberswaalde concerning allocations for the reparations plan and stated that Ebers= walde was to take over the following amounts of structural metal (Metallkonstruktion into its production plan (Planauflage) 0 100 tons from the Ernst- Thaaaelmannwerke l,600 tons from Unruh & Liebig; and 2;,000 tons from Bleichert,, The A erswaalde production plan for 1953 had already been exceeded,, howeverk, and for that reason ?'::e plant director of rberswalde wrote the Fain Administration on 3 December 1952 that his factory could not take over P 2 production. kberswalde has already finished about-1,,5O0 tons of P 2 fabrication for Bleichert in the first quarter of 1953, so the demands for Bleichoat stated in the Main Administration's letter of 20 November have almost been fulfilled The hberswalde plant. director suggested that P 2 production for the Ernst Thaelmaaannwerk and Unruh':,& Liebig plants be transferred to ABUS Foerderanlagen Leipzig,, eapeciae y since the Office for Reparations and'the Soviet Control Comission had forbidden Kranbau Fbers.de to shift fram direct"Irepaa.ratioras orders Eberswalde also requested the Main Administration toythe 9,, 5 million' DICE worth of orders remaining from 1952.. cancel SECRET, Approximate Value in Thousands of ONE Approved For Release 2001/08/22 : CIA-RDP80-0081OA000500120008-5