MAHLWINKEL AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A000500390003-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 14, 2016
Document Release Date: 
April 6, 2001
Sequence Number: 
3
Case Number: 
Publication Date: 
February 9, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A000500390003-1.pdf101.75 KB
Body: 
vi COlrllt~t~?r`a..... 1 :lA-RDP80OA@_______________________ EVALUA1' ION.,...._....., -22.1-2211!2_11 ...~ DATE OF CONTENT DATE OBTAINED.. 13 REFERENCE..,., PAGES ---,,,-ENCLOSURES (NO. & TYPE)_ REMARKS -:-.. - 1. On 8 December 1952, 199 construction workers were =deployed at Mahiwinks aa.r ie .c . 25X1X = 2. In 15 December; the eastern portion of the field as rolled and thy:." part o the construction machinery used at the 25X1 25X1X instailatioai had already been removed. 25X1X - that employees of the :Eiauunion an en urg were expected to be withdrawn from the field by 21 December. The utilization of runway ma.ts was not obsrved. No construction material or pierced steel p'.,:.;l .s as used for the construction of temporary runways were observed arriving ;prior to 4 January 1953. 25X1A 3. in early January, only 30 workers were employed at the field for clearing sp work. These workers were allegedly to leave the installation soon. There was no change in the status of the narrow-gauge field railroad track which had been built from, , Tangerhuette to the airfield; However, locomotives and cars used on this track had already been removed. 4. On 15 December, a Soviet construction detail of 80 men was stationed at the 'ield. On 27 D?c-tubers this detail and all its equip::ent was entrained at Mahlwinkel railroad station. six trucks, one of which was 25X1X 4 tracto leveling equipment. 5. On 27 December, P_ah7winkel airfield was unguarded. Only the hunters lodge which had been used-by the' Russians was -card^d by two civilians from Mahlwinkel. 6. In late December, that construction work at the field was ^osnpleted and that a. . the srror ters except a rear detail of 30 men to be employed for clearing-up work were withdrawn. The Soviet construction detail had also been withdrawn from the field in late December 1952.1 1. Co.ssment. The report indicates that construction wort. at Mahlwinkel r .r ield was completed in late 1952. It is noteworthy that the landing field of the installation was only rolled. A temporary runway was not, built. CLASSIFICATION S3,??CB^T, Approved For Release 2001/11/21 : CIA-RDP80-0081OA000500390003-1 25X1A 25X1A TOPIC .~.~.....~._ UA11 Tvi nlcgI A 11. r"i nlr