JOSEF STALIN STATE LOCOMOTIVE AND RAILROAD CAR PLANT IN POZNAN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A000500530006-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 6, 2009
Sequence Number: 
6
Case Number: 
Publication Date: 
April 17, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A000500530006-2.pdf265.52 KB
Body: 
CLASSIFICATION SMRF raavY r~sRa DISTRIBUTION CLASSIFICATION SECRET SLITY IGENCE AGENCY ~~1QN REPORT CENTRAL INTELL IiiFORMAAT1ON REPORT CD NO. COUNTR'Y'' Poland SUE. t.CT JoaO Stalin State Locomotive and Railroad Car Plant in Poznan PLACE ACQUIRED DATE. OF INFO_ SUPPLEMENT TO REPORT NO. THIS IY)C3NEr CONTAI RS INFORNATIOH AFFECTING THE RATIONAL DEFEHSi: OF THE UNITE- STATES. WITHIN THE RCARIR5 OF TITLE 10, 9ECTION& 798 ARD Tf;4. OF "411 U S. CODE. AS AMENDED. ITS TNANSYIESION OR RENEt- ATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON 15 PRO 91&ITED BY LAEI THE R#PRODIrCTIOH OF T419 FORT{ 13 PROHIBITED. DATE DISTR. 17 April 1953 NO. OF PAGES NO. OF ENCLS. (LISTED BELOW) THIS IS UNEVALUATED INFORMATION The .anstwowa Fabryka Paroupozow 3 Wagonow Josef, Stalin (Josef Stalin Nationalized Locomotive and Railroad Car Plant) was located on the main street in Poznan s it 2 km from the railroad station, The plant had a spur track. 1 2. During World War II, the plant was operated under German management as an ammunitions plant. Almost all the ammunitions machinery has, in the mcantime, been dismantled and shipped to the U.S.S.R.. .. The plant consisted of two sections on opposite sides of the main street. The north section was about 1,000 x 800 meters; the south section was somewhat larger. The report is concerned with the north section only. 2 Yost of the machinery dated back to the time when the plant was operated by-the Germans. The plant received its power supply from a power station, with an unidentifi d 3 e capacity, located outside the plant. .. The plant produced locomotives and freight cars rinci ll b t a u addition, a few coaches and express train cars, the desi f th gn o e 15--ton freight car model was probibly ss on the old German typed formerly produced in the planti,since it resembled this model on the outside.. About 275 x 15 ton freight cars were produced in the plant monthly. Monthly production of the plant also included five locomotives, probably of the average type freight loco-ti-e 4 , coaches and express train We were produced only as mode Ii sr~rt~ _ _T ARhlY-_.._I ` Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 6. The total number of workers employed in the north and. south sectio0s of the plant was about 5,000 including about 7CO-Pies who worked as skilled workers and as auxiliary and transportation workers. In the assembly shop there were about 1,000 workers working in three shafts. !Coffin t For location sketch of the ;)lantp see Annex 1. nt The north section is probably the west section of the plant, and the south section the east section of the plant. JaMent, For layout sketch of the plant, see Annex 2. C ent. Other informati reported that the plant was producing wnmo ves annusuy for the USSR:, 25X1 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 SECTIE ) Iocation sketch of the Jo:>ef Stalin Locomotive and jroad Car IlInt in Poznan SECFEt Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 SECRET Lends 1. North section of the Josef Stalin Locomotive and Railroad Car Plant:: 2. South section of the Josef Stalin Locomotive .nd Railroa,1 Car Plant. 3. Main street with streetcar line. The distance from the railroad station to the plant was from 1.5 to 2 km. Spur track to the plant. 5. Lain railroad line. 6. Poznan railroad station. SECRIZ 25X1 25X1 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 SEC RET/ ;Layout sketch of the -Josef Stalin Locomotive and Railroad Car P in Fbznan A smRr Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2 .d SMFETI Le,gendt A. North section of the plant. 1. Pt4 camp surrounded by a barbed-wire fence. The camp consisted of two farmer brick workshop buildings, each about 50 meters long and 18 meters wide. 2. Shed for the storage of riveting hammers and welding apparatus. The rough assembly of railroad care and locomotives was done in front of this shed before being moved into the workshop building; they were moved by two cranes. The shed is a low stone structure, about 60 meters long and 15 meters wide. 3. Assembly shop., a strong steel structure with brick walls and glass roof,. The steel frame was reinforced about every 50 meters by iron pillars,, The workshop was 250 meters long and 150 meters wide,. A spur track passed through the entire workshop leading to the varnishing chop. Side tracks branched from the main spur track; those to the right were used for the assembly of locomotives, ;hose to the left for the assembly of railroad cars. The section of the main spur track within the workshop had four turntables, There were also two travelling cranes in the workshop running above the assembly stands,, It was a double track installation with an alleged carrying capacity of 20 tons. In addition,' the equipment of the workshop included 1 heavy steam hammer, J. medium heavy press, 1 shears, 2 drilling machines, 2 punches$ 1 planing irach:.ne, and 5 lathes including 1 spindle lathe. There was also a power unit wi'ich could operate a total of 20 electrical riveting hammers. The electric welding installations could be connected with an additional power uni', . The workshop was only used for the assembly of locomotives and railroad cars. The parts were supplied from the south section of the plant and from a branch plant located east of Poznaai. The varnishing shop was xiistal.led in the lower part of the workshop separated by a pFrtition wool. In the last months of the observation period the. railroad cars were being sprayed. 4. Work sheds:. See also Item No 2. 25X1 25X1 25X1 25X1 5. Apprentices' workshop building Wpere apprentices were trained as enginners; a two-story stone structure with a wing. It was 350 meters long and 25 me'.ers uride. All machines used in the heavy industry were set up here. This workohcz had no working relationship with other shops. 6. Plant school building, a three story stone building, about 350 x 20 mc?ters. The training of the apprentices in theory was done in this school by exce-.lent specialists. One course lasted for two years. About 350 apprentices participated In each course. The school was founded in 1947. 7. Spur track. 3. Power station, a stone building, 25 meters square. It was used. only u; a switching station. 9. Plant entrance. SDORET, Approved For Release 2009/10/06: CIA-RDP80-0081 OA000500530006-2