JOCKSDORF AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001000190006-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 21, 2016
Document Release Date: 
February 23, 2009
Sequence Number: 
6
Case Number: 
Publication Date: 
March 24, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001000190006-4.pdf138.27 KB
Body: 
}q~`/.~.,?-? a j-Tp _ ~( SECFiET tsron.. Approved For Release 2009/02/23: CIA-RDP80-0081 OA001000190006-4 >OJNN'NTRY Tip e'C Jockadorf Airfield _,,.,.,:...._..,..~,,.,.,,....~._..~._~.W....w........,~., EVALUATION- DATE OF CONTENT DATE OBTAINED REFER ENUES 24 March 1953 PACiES_._- ..ENCLOSURES (NO. & TYPE) 1. In late January 1953, the airfield construction ? ;aroject at Jocksdorf had the-designation "Object No 1015". The area was located between the forner glider field and a ocksdorf, and A few kilometers fro the Polish border. Sauunion South had the contract. for the work which was to be performed by 2,000 to 3,000 workers in the spring of 1953. The laborers were quartered in temporary buildings whose number was increased to about 40 in 'ebruary'? Construction superintendent was Graduate Engineer Horn (fnu) a A railroad siding was under construction between Si.Tr:iersdorf and Jocksdorf. ? 2. In February, grading work was being done south of the auto in near Ba, a eusel ? Apparently, an airfield was under construction not far from the Neisse Fiver, 3. In February, I the new railroad embankment terrsi.nated in the woods southeast of Sirersdorf. . The new railroad siding branched off from the railroad line south of" Sirmersdorf and extended in a curve to the east. In the extension of the embankment, a lane had been out into the woods toward the village of Preschen? Heavy caterpillar tractors were used for uprooting o A few meters of standard-gauge rails 'had been laid fro" the point where the siding branched off, while narrow-gauge field rails sti7l lay on the other section of the embankments 4s A number of low wooden bu-!ldings, which had the same size as the buildings of the former Reich Labor service., were observed in a corner of the woods about 800 meters north of Jocksdorf. CLASSIFICAT]ON SWIM 25X1 25X1 25X1 Approved For Release 2009/02/23: CIA-RDP80-0081 OA001000190006-4 Approved For Release 2009/02/23: CIA-RDP80-0081 OA001000190006-4 cv r.d OF,) r7, Ineuw the sire of construction as no large scale -ading work was observed? it was ?urored among the pvpu1a Lion that srnrunition dumps wore to be esit' L'; ishod On 24 February, a conference was held in a Trade Organization (110) stoma in r oisswasser . Two Soviet colon.o1s, 1 lieutea ant colonel. 1 major and 2 VP colonels, 2 VP lieutenant colonels and 2 VP majors participated,, The officers arrived in eight VP sedtLns andg subsequently, left in the direction of Nprem"berg-Got bus. The conference was probably held in connection with the construction of an airfield near Sirinersdorf., 7 ? On 25 ?e ruery? construction work on the spur tarac : south of Sir. nersdorf was generally completed,, Large quantities of crushed v tong a were stored in S:L::~z^,ersdorf or m n t The stater-outs do not contain new infor;ation. The statement c n the course of the railroad orbankment does not apree with a sketch reviowl forwarded Further Inforratlon is required for clan?ification 25X1 25X1 25X1 Approved For Release 2009/02/23: CIA-RDP80-0081 OA001000190006-4