SOVROMCONSTRUCTIA, SIBIU

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001100520001-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 15, 2009
Sequence Number: 
1
Case Number: 
Publication Date: 
May 7, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001100520001-1.pdf99.44 KB
Body: 
c Sanitized Copy Approved for Release 2009/12/15: CIA-RDP80-0081 OA001 100520001 -1 CENTRAL INTELL.I.G.ENCE AGENCY INFORMATION REPORT This Document contains Information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - U.S. OFFICIALS ONLY DATE OF INFO. Sovromconstructia, Sibiu REPORT DATE DISTR. 7 May 1953 NO. OF PAGES 2 REQUIREMENT NO. RD REFERENCES This is UNEVALUATED Information THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 1, Sovromconstructia has regional branches in Bucharest (the former Prager building firm), Arad (the former Via building firm), Timisoara, Brad, Sibiu (also the former Via building firm), and Bacau, 2e The Sibiu regional branch has carried out the following work in the Sibiu and Caranseios areap: 3. A concrete halls 40 by 80 meters, was built for the Independenta Factory (formerly the Rio ger Machine Works). This factory, which is located in the lower town of Sibiu (Orasul de Jos) on the Cibinul, employs 1,200 workers. It produces diesel engines (16 ~o 20 h,po), cast iron pipes, threshing machines, and other agricultural machinery, Power is obtained by burning methane gas. b, A transformer to step down 60,000 volts to 2,000 volts for lighting purposes was built at Margineni, near Sibiu* c, The municipal power stationa Sibiu, near the Orasul de Jos station, was repaired. This power station has five large diesel engines,.one of which is a Sulzer 3,,500 h.p with an NGA generator, Two Siemens Maerz steel furnaces, a T, otory hall for steel pipes, and shower rooms for workers were built at the Otelul Rosu Steel Works (formerly Auschnitt) at Ferdinand, The furnaces are supplied with 400 liters of water per second from the reservoir on the Bistra River in the Marul mountains, A pipeline seven kilometers long with a diameter of 60 to 70 cubic centimeters connects the factory to the reservoir, Otelul Rosu employs 8,000 workers, It is reported that thousands of tons of cast iron blocks are stockpiled as was emergency materials in this. factory. A quarry near the Batuta railroad station'on the Mures River supplies building material for the Sibiu regional branch, Forty workers are employed at the quarry, SECRET/CONTROL -. U.S. OFFICIALS ONLY STATE x ARMY X NAVY X AIR FBI J I AEC (Note: Washington Distribution Indicated by "X"; Field Distribution By "#".) 25 YEAR RE-REVIEW Sanitized Copy Approved for Release 2009/12/15: CIA-RDP80-0081 OA001 100520001 -1 Sanitized Copy Approved for Release 2009/12/15: CIA-RDP80-00810A001100520001-1 SECRET/CONTROL - U.S. OFFICIALS ONLY 25X1 The following personalities of Sov romconstructia,Sibiu are known: a. Ariton Titei the general manager, b, Mircea Protopopescu, building site head, SECRET/CONTROL .. U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2009/12/15: CIA-RDP80-00810A001100520001-1