MILITARY INSTALLATIONS IN PECS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A001200450004-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
11
Document Creation Date:
December 22, 2016
Document Release Date:
July 28, 2009
Sequence Number:
4
Case Number:
Publication Date:
June 4, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 467.77 KB |
Body:
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
SECRET
SECURITY INFORMATION
COUNTRY Hungary
Military Installations in P6cs
This Document contains Information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
4 June 1953
military installations in an aro and Pe jF~05N-~ g~ ~1 /
See Overlay and
Sketches attached as Annexes A B C D and E, which include with the
legend on these installations,,,,/
ANNEXES:
Pecs, Hungary - Pinpoint Location of
Sketch of Dozsa Gyorgy Infantry Officers" School in Pecs.
Sketch of Kertvaros Barr
acks in Pecs,
STATE #X ARMY # C NAVY
#x AIR
C
FBI I AEC
(Note: Washington Distribution Indicated By "X"; Field Distribution By "#".)
USAF review completed.
litary Installations in Pecs,
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
25X1
25X1
25X1
j
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
aF, ~RET/SECURITY INFORMATION
-2-
D. I (Sketch of Alsomalom Ut Barracks.
E. I (Sketch of the Hadaprod Infantry Officers' School near Pecs.
25X1
SECRET
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
SECT /SECURITY I FORMATION
ANNEX:
A _3-
Q n LocBtton t~f.M~.lita Pecs, Hungary - 56O5N-18138.
ry-!installations in Pecs.
* Horizontal and Vertical Grid Lines
SECRET
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
SE.RET/SECURITY INFORMATION
ANNEX: A- (C ONT' D )
LEGEND
1. Dozsa G orgy Infantry Officers-' School. Lee Annex. B., this
report
2. Road. Cobblestone, drainage ditches on both sides, eight meters
wide.
3. Kertvaros Barracks. /See Ahik. C .P this report
Road. Cobblestone, a ght meters wide.
Alsoma],om 'ut Barracks. Zffee Sex.. D , this report.]
Firing Range. Small arms, rifle, and hand grenades. Area
250 x 300 m.
7. Hadaprod Infantry Officers' School. Lee Annex. E.., this report .]
Road. Dirt and gravel, five meters w de, shallow drainage dita es
10. Firing Ranger Small arms, hand grenade, mortar firing. Used,:'by
250 m. Small'wooden,shack for.. target material. Dirt road foite .
on each side.
Piring Ranges Carbine,. rifle, machine gun 30 cal:, Area 3OO;=m ... g
meters'wide".leading into area:from. highway .
the students.from Hadaprod School for demonstrations and practice.
Several small wooden shacks for target`-material. Dirt road lead-
ing to area from highway 4j m. wide, shallow drainage ditch on
west side.
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
SE".,'RET/SECURITY INFORMATION
Hungary
Sketch of Dozsa Gyorgy Infantry Officers' School in Pecs,
1. Hq. Building: two stories, brick construction, hipped tiled roof,
20 x 8-x 14 m. Used as battalion headquarters and camp prison-`
2. Sentry, Post #1: equipped with rifle, guard changed every two
hours, sentry posted,at entrance of guard orderly room.
.3. Sentry and Gate, Post #2: same as above, except that post included
checking passes and orders at_.main gate.
4. Barracks:. three stories, brick construction, hipped tiled roof,
24 x 14 x 8 m. Housed approximately 200-225 anti-aircraft stude#s .
5. Class Room and Cultural Building: single story, brick construction$
hipped tiled roof, 24 x 14.x 8 m. Used as class rooms and offices
for education staff.
Class Room Building: single story, brick construction, hipped
tiled roof, 20 x 10 x 8 m.
Students Barracks: three stories, brick construction,?hipped
tile roof, 28 x 8 x 24 m. Half of first floor is dispensary.
Class Room Building: single story, brick construction, hipped
tiled roof, 20 x 10 x 8 m.
9. Class Room Building: single story, brick construction, hipped
tiled roof, 20 x 10 x 8 rn.
10. Class Room Building: single story, brick construction, hipped
tiled roof, 20 x 10 x 8 m.
11. Stud ent,Barracks: three stories, brick construction, hipped
tiled roof, 28 x 8 x 24 m. Half of first floor used as canteen.
12. Sentry, Post #3: equipped with rifle, guard hanged every two
hours. Post included area around building /Point 137.
13, Ammunition Supply Building: single story, rick construction,
hipped tiled, roof, 24 x 10 x 8 m. East side of building used
as horse-drawn ammunition carrier shed.
14. Stable: single story, brick construction, hipped tiled roof,
24 x 6 x 8 m. Used for horses for instruction in horsemanship.
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
SE RET//SECURITY INFORMATION
1^'' AN1b` B (CONT'D)
15. Sentry, post #4: equipped with rifle, guard changed every two
hours: post included around Point 14 this report,
1b. Chemical Warfare Indoctrination Gas Chamber: single story, brick
construction hipped tile roof, 3.6 x 6 x Tp m. Used for indoc-
trination of students to various types gas, (mustard, tear gas)..
Helmet type face piece, model SH M--1 used, Oil skin protective
suit, model 0-8 demonstrated. Much emphasis put on defensive
chemical warfare.
17. Building: .robahly student barracks, see Points 7 and 11j
1 . Fence
CRET
Approved For Release 2009/07/28: CIA-RDP80-00810A001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
SECRET/SECURITY INFORMATION
C - 7
Sketch of Kertvaros Barracks in Pecs, Hungary
1. Sentry Post #2: equipped with rifle, guard changed every two
hours. Post was at gate to check orders and identification
cards.
2. Sentry Post #1: equipped with rifle, guard changed every two
hours, sentry stationed at entrance to guard room at west end
of .building point..
3. Battalion Hq.: two stories, brick construction, hipped tiled
roof, 20 x 14 x 14 m. Battalion CO and Staff offices. West
end of building used for guard room and cells.
4. Class Rooms: single story, brick construction, hipped tile-
6.
roof, 30 X 14 X 10 M.
Class Rooms: single story, brick construction, hipped tiled
roof, 30 x 14 x 10 M.
Sentry Post #3: equipped with rifle, guard changed every two
hours. post included area east of buildings Points 4 and 5
7
.
7. Stables: single story, brick construction, hipped tiled roof,
24 x 10 x 12 m. Horses used by students for horsemanship
instruction.
8. Troop Barracks: three stories, brick construction, hipped tiled
roof, 30 x 10 x 26 m. First floor, south wing., used as mess-
hall; north wing used as dispensary. Second and third floors
were barracks, housing 125 men.
9. Stable: single story, brick construction, hipped tiled roof,
20 x 16 x 10 m. for 15-20 horses used to haul weapon carriers
and artillery pieces.
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
Sketch of the Alsomalom ut Ba-rrrac..s unary
SSE?'':C ET/SIECUPITY INFOR'1.M'1!)"T
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
Approved For Release 2009/07/28: CIA-RDP80-0081 OA001200450004-5
SFI.1RET/SEcui1TTY TNFORMAT~T'OINI
-.!BO..._
AMEX:,']. D (CONT'D)
LEGEND
1. Class Rooms: two stories, brick consic?ruction, hipped tiled roof,
30 x 14 x 18,m. Building had of i'ic ea n l'1.r t floor for instructors.
2. Sentry Post #4: equipped with rifles, uard every- two
hours. float included area south o:L' bi' l.;atno , Point I.
3. Guard Barracks: two stories, brick. CLn i ructi on, hip; ed tiled
roof, 24 x 10 x 18 m. Building c ontait,.cc c:;i j.((xsar d- and camp
showers.
4. Sentry Post h3: equipped with x if7 _, f ~{