UNDERCARRIAGES FOR EXTRA-HEAVY FREIGHT CARS MANFACTURED IN EAST GERMANY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001200760009-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 21, 2016
Document Release Date: 
March 31, 2009
Sequence Number: 
9
Case Number: 
Publication Date: 
May 19, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001200760009-6.pdf70.84 KB
Body: 
Approved For Release 2009/03/31: CIA-RDP80-0081 OA001200760009-6 CENTRAL INTELLIGENCE AGENCY This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as INFORMATION REPORT amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - U.S. OFFICIALS ONLY SECURITY INFORMATION COUNTRY East Germany SUBJECT Undercarriages for Extra-Heavy Freight Cars Manufactured in East Germany DATE OF INFO. REPORT DATE DISTR. NO. OF PAGES REQUIREMENT NO. REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 25X1 I... The working drawings for the assembly. of the parts of undercarriages for extra.- heav frei h f- y g t ears o changeable. gauge are delivered by the technical construction office of the VEB Schwermaschinenbau "Heinrich Rau" VVB Gus, Wildau, Since the spring of 1952, the undercarriages have been assembled by Lowa Lokomotivbau Karl ,Marx Babelsberg VEB. At this plant the parts are welded and are painted with an anticorrosive paint. There are three welding groups on each shift; 15 to 18 v'blet assemblies are put together by each group on each shift. Work is occasionally delayed by shortages of materials. There are two types of aseckblies. The assemblies-ma eked with the Russian B - 77,,12 are 5.8 m. long,, with a loading space of 5.2 m. The ones designated-1ith the Russian B - 71,,12 are 4438 m. long. Both types have double bottoms to accommodate the alteration in the gauge; The final assembly takes place at Goerlitz-Niesky;l Up to,-100-of these undercarriages are produced monthly. Completed cars go to Wildpark-West near 'East Berlin,, exchange depot for the Russian Army. Comment: aggonbau Goerlitz a es y VEB. 25 YEAR RE-REVIEW JuAIt I XIARMY I X (NAVY I X LAIR probably Lowa FBI AEC ORR Ev X (Note: Washington Distribution Indicated By "X"; Field Distribution By 11*'111 Approved For Release 2009/03/31: CIA-RDP80-0081 OA001200760009-6 19 May 1963 1 RD 25X1 25X1