NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

SHIPBUILDING AND TRADE ON THE DANUBE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001300430003-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 10, 2009
Sequence Number: 
3
Case Number: 
Publication Date: 
May 26, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001300430003-7.pdf117.95 KB
Body: 
Sanitized Copy Approved for Release 2009/12/10: CIA-RDP80-0081 OA001300430003-7 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of Its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SWRET/CO RAL - U.B. OFFICIALS ONLY SECURITY INFORMATION COUNTRY Hungary/Bulgari a /USSR Shipbuilding and Trade on the Danube REPORT DATE DISTR. 26 Wy 1953 NO. OF PAGES 2 REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 1. The K 1ta Ckennel The Russians have tried-to dredge the Kilia channel to a navigable depth and had reached a depth. of 1,2.1 '. feet but this has now silted up to 6-7 feet. 2 The traffic in Russian iron ore (pyrites) was stopped during the.summer of 1952 but has been resumed and.has increased in volume, Bulgarian iron ore is: a1iipped from Somovit and. Sviehti v to Hhtxigarye Hungarian bauxite is shipped: dowel the river to Izmaii,_ and sane Russian timber up the river to Hungary. The electric. lamp and tube factory esii.lt Izz.a is now proauei a aratue to Ballow the flight of shells (radar and television receiversQ at a lass to explain this as, there is no television transmission in Hungary. 25X1 The Ganz ' Shipyard of Hungary is to deliver the. 37th .and 36th ships of Its contract sittb the Soviets Work on the passenger vessel for Poland has been suspended owing to lack of raw ptaterials Since October 19'52 foreign vessels are not followed by launches between Braila and Sulina as they isrrmrly , Mc(tre t of'_ Hungarian Yeaaels;d the TI,SZk carried 1,100 t+ of hmgar an sugar froiii SEED carried' 300 tans of H returned with a full Barg i bff cotton for Czechoslavakiad. THe DEBRMEN ;carried 400 tons of scrap iron for lungary. 25 YEAR RE-REVIEW SECRST/CDN 40L - U.9. OFFICIALS ONLY NAVY AIR F IaC FBI AEC (Notes Washington Distribution Indiented By "X". Fi.!4 rat,+.tbu+Inn 11L OIT x ORR Ev Sanitized Copy Approved for Release 2009/12/10: CIA-RDP80-0081 OA001300430003-7 Sanitized Copy Approved for Release 2009/12/10: CIA-RDP80-0081 OA001300430003-7 SELRE /COP ROL -{ U. S. OFFICIALS ONLY The TTSZk was to, continue -tprk. in the Ifear east during the winter of 1952-19 3 but the Z1WD,, the BAP, ES acid the D :3R EN, refit in Budapest.. The 11$7A wa,s to refit for three weeks in during the winger. All ships were to be ready by the end of February 1953. ..Z t (Hungarian'-Soviet Navigation Coo) complained of the dela in its a n d of the difficult,, of ahi ing scrap iron the: 1SZA: renamed for two weeks trying to collect e._ tons that had been contracted, but eventually sailed with only 350 tons. SECS''/CONTROL .. U.S. OFFICI ONLY Sanitized Copy Approved for Release 2009/12/10: CIA-RDP80-0081 OA001300430003-7