1. ROADS AND RAILROADS 2. CLUJ-BUCHAREST GAS PIPELINE 3. TRANSFORMER STATION NEAR SUCEA SEACA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001500270009-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
June 21, 2005
Sequence Number: 
9
Case Number: 
Publication Date: 
June 22, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001500270009-7.pdf111.43 KB
Body: 
Approved For Release 2005/07/13 : CIA-RDP80-0081OA001500270009-7 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.B. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. 25X1 COUNTRY Rumania REPORT NO. 25X1 1. Roads and Railroad DATE DISTR. 22 June 1953 25X1 2. Cluj-Bucharest Gas Pipeline 3. Transformer Station Near Sucea Seaca NO. OF PAGES PLACE A CQUIRED REQUIREMENT N REFERENCES O. 25X1 THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 25X1 Roads 25X1 1. 25X1 25X1 a, The Bucharest4Urziceni-Faurei road which leads to ralia was completed in 1950. Part of this road was two lanes wide and had a concrete surface. Gr. In the Spring of 1951 the road between Braila and Galati, which during World War II was a dirt road, had an all weather surface, possibly asphalts During and before World War II a two-car motor ferry crossed the Siret River between Braila and Galati, 2. the Moldova region was undergoing "serious" highway construction, most o new roads being in northern Moldova, running west over the Carpathians. STATE x 777 -1 1 X AIR # f AEC (Note: Washington Distribution Indicated By "X"; Field Distribution By "#".) Approved For Release 2005/07/13 : CIA-RDP80-0081OA001500270009-7 Approved For Release 2005/07/13 : CIA-RDP80-00810A001500270g09-7 I 25X1 Railroads 25X1 3. the Bucharest newspapers that the standard6.gauge, single- rac raa:~_ line along the Jit.. River had been completed in 1949-19500 25X1 4. broad-gauge rail lines connec n.r Gas Pipeline 25X1 5.1 the CiuJ-Bucharest gas pipeline has been completed,. .During-World war I 1I some gas conduits had been laid in Bucharest; in 1948 25X1 Since 1 Bucharest as been supp ea wirn . apartment houses and homes have converted to gas for heating and 25X1 cooking. the flow of gas was undependa. . e use of methane gas was 25X1 somehow rationed. Transformer. Station near Sucea, Seaca 6. 25X1 25X1 25X1 25X1 25X1 301 25X1 25X1 25X1 25X1 the villa e of Sucea Seaca is located near the town of Tar dvisste k56N-2526E7. 1 ::1 T e station of an oil field and housed two 'Dinano-built 2,500 KVA transformers.. The input was not more than 30,000 V. and the output was 6.Q00 V. This transformer station was connected to several smaller step-down transformers within a radius of five kilometers. the step-down transformers output was 1,000 or 500 V. It seemed to be in turn, connected to e electric motors of the oil drills in the vicinity. some of the oil drills were run by steam power. most of the oii ari.u. electric motors were ore n-ma a same were built by Dinamo, Bucharest. SECRET Approved For Release 2005/07/13 : CIA-RDP80-0081OA001500270009-7