RAILROAD CONSTRUCTION PROJECTS; BRIESELANG STATION; JUETERBOG-LUDWIGSFELDE LINE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A001500410001-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
December 11, 2009
Sequence Number:
1
Case Number:
Publication Date:
June 26, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 79.81 KB |
Body:
Sanitized Copy Approved for Release 2009/12/11: CIA-RDP80-0081 OA001500410001-9
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains information affecting the No-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form ie prohibited.
SECRET/CONTEtOLmU0 S. OFFICIALS ONLY
COUNTRY East Germany
SUBJECT Railroad Construction Projects;
Briiso ang Station; Jueterbog
Ludwigsfflde Line
DATE DISTR. 26 June 1953
NO. OF PAGES 2
REQUIREMENT NO. RD
REFERENCES
[This is UNEVALUATED Information
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
2. Construotion at the Brieselang railroad station comprises the following projects
as numbered on the enclosed sketch.
Since 26 March 1953, only about 200 meters have been laid of the second track.on
the Jueterbog-Ludwigsfeld linen It now extends approximately 800 meters from the
T,hyrow to Trebbin. The sections of the second track which have been laid,are not
as yet in use.
-.?;, Extension of building site, sand embankment about 1 in. high and 15 m,wide.
a. Culvert about 1,8 m. high and 2 m. wide. Drainage work is in progress.
d. New track bad about 25 m. wide and 3 to 4 km. long. The site is being cleared.
New track bed about 25 m. wide and 800 to 900 m. long. Grading with sand
;,and leveling is now being done.
Old construction site. No work is in progress at present.
g. New reinforced concrete bridge which is almost completed. It is about 25 m.
long and carried on two piers.
Building site where two excavators are in use excavating sand for walling
operations. Sand is,transported by steam or diesel operated field railroads.
SECRET/CONTROL - U. S. OFFICIALS ONLY
(Not.n Washington Distribution Indicated By 'X"i Field Distribution By "#",)
Sanitized Copy Approved for Release 2009/12/11: CIA-RDP80-0081 OA001500410001-9
Sanitized Copy Approved for Release 2009/12/11: CIA-RDP80-00810A001500410001-9
SECRET/CONTROL -- U. S. OFFICIALS ONLY
4'
l~ ' RA, lkoa:d a , o
Fakcfrse- e -
woo
~'~ _, X3ri cS IAN RA ~Raa~ia~
I'
I
_
vyf4
SECRET/CONTROL, - U. S. CF7ICIALS ONLY
Sanitized Copy Approved for Release 2009/12/11: CIA-RDP80-00810A001500410001-9