POSSIBLE ABANDONMENT OF RUGEN PROJECT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A001600970006-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 16, 2016
Document Release Date:
November 4, 2002
Sequence Number:
6
Case Number:
Publication Date:
July 30, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 39.64 KB |
Body:
Approved For Release 2005/08/17 : CIA-RDP80-0081OA001600970006-2
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
25X1
25X1 DATE OF INFO.
30 July 1953
25X1
25X1
25X1
1< The tame and general, the above may be of inters-
STATE Z ARMY
it to considered possible that the project of building amen into a major natal
base will be abandoned in favor of placing the bass at itettia. =ndicatio ^
oiating in this direction are the recall of the Construction staff from an
to 3srlin on March 19530 where they rOosited orders for the limitation of
the work on Z gsal and were told that etettin would receive higher priority.
2. After the return of the staff to Zlpn part of the work on both Zen harbor
and the barracks at Prom was stopped. The laborers on these projects were
taken to ltettin.
25X1
mast Germany
Possible lbandomment of Bogen Project
Z NAVY ~q x
This Document contains information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
REPORT NO.
DATE DISTR.
NO. OF PAGES
REQUIREMENT NO.
REFERENCES
(Nat. Washington oi.t-ibu aprove6 for tefeaseb~lb
ft?01r/1'7*: 1CIA-RDP80-0081 OA001600970006-2
25X1
25X1