SHIPYARDS AND DANUBE BRIDGES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001700390004-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
January 6, 2010
Sequence Number: 
4
Case Number: 
Publication Date: 
July 17, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001700390004-7.pdf110.44 KB
Body: 
Sanitized Copy Approved for Release 2010/01/06: CIA-RDP80-0081 OA001700390004-7 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- Ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL . U.S. OFFICIALS ONLY SECURITY INFORMATION COUNTRY Hungary SUBJECT Shipyards and Danube Bridges REPORT DATE DISTR. 17 JWy 1953 NO. OF PAGES 2 REQUIREMENT NO. RD REFERENCES This is UNEVALUATED Information THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OP CONTENT IS TENTATIVE, (FOR KEY SEE REVERSE) a. two patrol boats were observed at the o hip repai,r rarer beiong-in o he Hungarian River Forces, situated at the northern tip of the winter harbor of Ujpest Island, near Ujpeet. The vex oels were approximately 15 me in length with low superstructures, and one mounted two machine guns covered with green tarpaulins, be Opposite the ship repair yard, on the Ujpeet river bank, the barracks as being enlarged. Four large buildings with approximately five etorlem and several storehouses are to be seen, Members of the Hungarian River Forces have been observed moving about outside the barracks, 2. -I addition to building floating cranes, river and sea-going craft of 1,200 tone, the yard is engaged on the production of gunoarriagee for 122 nun. 25X1 25X1 Z17Wa'idAarm 174: 1-ai?V . ! 6:tNls.h *s5 a sw war.c..._v??P _ _ 25X1 per month and finished products are taken to Dike r by rail. forty seaworthy vessels had been handed over to the Soviet Delivery omm ee.,on. a. The Kossuth Bridge in Budapest, which was originally a temporary Construc- tion is now being reinforced ae it has been decided to keep it in uses be Work on the northern railway bridge in Budapest is in progress, but as yet, only the arch over Ujpest harbor, immediately north of the Ghiurgiu- Dej shipyard, has been completed. ~~._..-U 4t,_ lw" A ''.44* 4" &iAss"mit wag enAnad for trafficF___] the 25X1 ..m - -I"-- ---- __ .. - roadway foundations have only been completed for half its width. SECRET/OONTROL - U.S. OFFICIALS ONLY (Notes Washington Distribution Indlleat.d By "X" i Field Distribution by "#" .) Sanitized Copy Approved for Release 2010/01/06: CIA-RDP80-0081 OA001700390004-7 Sanitized Copy Approved for Release 2010/01/06: CIA-RDP80-0081 OA001700390004-7 SECRET/CONTROL o U.S. OFFICIALS ONLY d. The work on the widening of the southern railway bridge in Budapest was to be completed e. Initial works preparatory to reconstruction on the Erzs6bet Bridge in Budapest. is being undertaken 25X1 f. In spite of difficulties, work on the Giurgiu Ruse Bridge is proceeding. The central pillar which was washed away last fall has now been replaced; but the bridgehead on the Ruse side has started sliding into the river due to insufficient foundations. The transmitter cable across the river, between the two bridgeheads, has been installed so that vessels passing beneath are obliged to lower their masts. SECRET/CONTROL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/01/06: CIA-RDP80-0081 OA001700390004-7