1. FUEL ALLOCATIONS IN EAST GERMANY 2. RAIL AND HIGHWAY BRIDGES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001800260005-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 19, 2005
Sequence Number: 
5
Case Number: 
Publication Date: 
August 4, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001800260005-9.pdf211.15 KB
Body: 
ILLEGIB 25X1 ACQUIRED r)ATEf,. I F ATION REPORT ' UNTR~`. E"i8 GSe-r mr7 SUBJECT le Fuel Allocations in East Germ3n77 2a Rail and f1jeh,,aay Bridges ...# ., 25X CLASSIFICATION ti .,.: Gar,, 4 CEN.1 RAL 1"Pd IG AGENCY +r,`, a '*, 25X1 a,~SI-. 1953 _A_ i~z maw, 25X AND 794, OF THE B 4. CODE ra "4$ThDPD. ITS Td C8RWSElOid OE Ro - NTIdR1 ~F fTs COiPTE~1'A TO OR 9[6cE1PT 97 AM dt7M47NORITFO PERSO9 )S PRORI4ITF.D BY LAW TA6 REP'EODUCTIOB OF THIS F9916 IS PRONIE!TBD. 25Xh 25X z_ . Lin tans 153,525 50,95 !don-scheduled 120000 services Die- Freight Traffic 149,520 120,650 bone-scheduled 5,000 services 'a.so ine Freight Traffic 157,766 Sedans }t t ? 70, 000 1r0,OCO 70,9000 5,000 160,000 5,000 ns Power gas 269500 Generator briquettes 5,400 Farikozit (sic) 500 Charcoal 1056 42,580 cubic 2.48,noCC cubic meters 500,000 cubic meters, reters Motor petroleum ?;I_n.SSIFIwAT? N SEC 'T-_ .._r ^r ,~ i rl~vr g DISTRIBUTION THIS IS UNEVALUATED INFORMATION - .. ?a a z thuo a Actual Allocation 25X1 25X1 Planned 1954 Alloca- REPORT NO. CD NO.. DATE. Dt`R: NO, OF PAGES No. OF ENCL_S PPLENT TO. Approved For Release 2005/08/03 . CIA-RDP80-0081OA001800260005-9 Approved For Release 2005/08/03 : CIA-RDP80-0081OA001800260005-9 a general overhaul frog, February 1953, throuf;h Yarch 1952 and their rigidity ,,rav increased by the installation of additional webe z The physical : tatus of the steel superstructure of the bridge is satisfactory. The bridge has a load capacity of 60/15 tons When tests were made with a three --axle trucks which had an axle pressure of 13 tons and a total weight of 39 toass, it was deterv,;ed that mum tensions were exceeded in none of the construction ciements of the bridge. In 1950, a sign indicating that the bridge had a load capacity of 12 tons was set up at the two ends of the bridges ent 90,000 tons of gasoline, 100,000 tons of aese . oil, an 9,000 ons o r otor call. were allocated for 1953.1 71 Cox gent rt This information refers to the rexplacemen:t of tez y, orary bridges _by permanent structures on the Perlin-Stettin autobahn and on ;:Ughw s Nos. 1C7 and 109. 31, omniio xt~, This bridge is scheduled to be reconstructed from 1952 to 3.954 It appears that construction work proceeds according to schedule E. late 1953. the bridge is scheduled to be reconstructed .or e t The reconstruction of this bridge has so far not been included in the 1.953 or 1954 railroad construction progress . But it ray be that the bridge like the one in Guben, is to be rebuilt by the Poles rent This bridge, which crosses the Hoersel River, is on the Dr?esden- aisenach autobahn.. Its reconstruction is to be cor;pleted by 30 December 1953 7._]!~o gnt, 11 C,r~4 This autobahn bridge, also referred to as Rothensee bridge, is on the Berlin"agdeburg-Braunschweig-}Iannover autobahn, which is mainly u6"d .rjjr inter-zonal traffic. The construction drawing of the temporary structure - is transmitted previously. The bridge was scheduled to be replaced by a perranent structure in 1952. How,,rever, as the required 1,500 tons of steel were rot available, the execution of the project had to be post ncd. The bridge in to be po- rebuilt in 1953A9541 y Approved For Release 2005/08/03 : CIA-RDP80-0081OA001800260005-9