RETRACKING OF TIMISOARA-RADNA RAILROAD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002000360008-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
June 4, 2002
Sequence Number: 
8
Case Number: 
Publication Date: 
August 3, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002000360008-2.pdf87.44 KB
Body: 
F 365 Approved For Release 2002/07/15 : CIA-RDP80-0081OA002000360008-2 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United Btates, within the mann- ing of Title 18, Sections 763 and 764. of the U.B. Gods. as amended. Its transmission or revelation of Its oontan s to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. 25X1 SECRET SECURITY INFORMATSON COUNTRY Rumania 25X1A 25X1A REPORT NO. DATE DISTR. 3 August 1953 NO. OF PAGES REQUIREMENT NO. REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) SOURCE: 25X1 capacity, goods and animal loading platforms, a warehouse with ouu cubic meters capacity. At Rischia station there is one through line, one siding with 80-axle capacity, a warehouse with 800 cubic meters capacity, loading platform still under construction. At Zabrani station there is one through line, a passing line with 80- axle capacity, an animal loading ramp, a goods loading ramp, a ware- house with about 700 cubic meters capacity, At Masloc station there is one through line, two sidings with 80-axle SEC 1. The retracking of the Timisoara-Radna railroad line was completed on tanks, three warehouses with about 800 cubic meters capacity each. At Lipova station there is one through line, two sidings, each with 120-axle capacity, two passing sidings of 60 and 80-axle capacity, a new loading ramp for armor and a shop. Russian. type rolling stock. At Radna station there are now two lines and six sidings, each of which can take a 120-axle train; two loading platforms, four water as it was necessary to prepare bridges, viaducts and sidings to take 4e At Satu Nou station there is one through line, one siding with 120- axle capacity, two passing sidings, flanked by loading ramps, a warehouse with 700 cubic meter capacity* ARMY Retracking of Timisoara-Radna Railroad X NAVY F~l Q EV X 25X1A 25X1X 25X1 L-i ate: Washington Distributi n Indicated III "X" Field Distribution By "#".) Approved For F2elease 2002/07/15 : CIA-RDP80-0081OA002000360008-2 Approved For Release 2002/07/15 : CIA-RDP80-0081OA002000360008-2 SECRET/I 25X1A At Iermata-Neagra station there is one through line, three sidings of 120-axle capacity, loading platforms for armor, goods and animals, a siding to the airfield, a warehouse with 800 cubic meters capacity. 9. Work is still in progress on the bridge over the Mures River between Radna and Lipova. This bridge was destroyed during the war, and a temporary bridge has been in use. The new one will be complete in the fall of 1953. Block signals along the whole line are being made automatic. The telephone cables along the line are being placed underground and preparations being made for ultimate electrification. SECRET 25X1 25X1 Approved For Release 2002/07/15 : CIA-RDP80-0081OA002000360008-2