LOADING OPERATIONS IN DESSAU

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002100860011-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 15, 2016
Document Release Date: 
July 26, 2002
Sequence Number: 
11
Case Number: 
Publication Date: 
July 21, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002100860011-2.pdf82.85 KB
Body: 
Ft b ,A,RroXe R '(4RALqaseAQ3/4/1.?:, CIA-RDP80 r00810AQQ08f 001 ~=2 25X1A ., seat %e OUK14i x?~,~at __-AREPORT NO,.., Loading Operations in _Dossam TOPIC 25X1A DATE OF" CO NTEN1 DATE OBTAINED REFERENCES PAGES- I 25X1A ..:.DATE PREPARED- -- 21 Ju3y 1953 ENCLOSURES (NO. & TYPE).._.__ REMARKS.........-._, _ -- SOURCE 25XIX 25.X1 B On 3 July 1953, 23 'trucks including truck Q carrying pontoons and lumber 25X1 B 25X1 B and 1 motorboats and personnel' and billeting equipment from the be Camp were loaded onto an undeternd.ned number of flatcars and 13 boxcars at the Dessau railroad station. Involved in the loading operation were 25X1 B 25X1 B The train left toward_ Bitteifeld at 7 p.m. At 3:45 ps,m. on 4 July., carrying pontoon and lumber.. about 18 assault boats of various types and, at 8:30 poms9 29 trucks with pontoons and lumber and 3 motorboat and personnel were loaded onto an undetermJ_nnri number of flatcars and 15 boxcars and were dispatched in the same direction Truck 25X1 B 0 stood at the loading ramp. The loading operation apparently continued. 25X1 A ui+ engineer units of the Eighth Guards Army. The direction of travel indicates re urn to posts or training grounds 25X1 in Thuringia. CLASSIFICATION Approved For Release 2003/04/18 : CIA-RDP80-0081OA002100860011-2 25 ~ AT1 N_ ,_PLACE OBTAINED