PARCHIM AIRFIELD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A002400590003-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 19, 2016
Document Release Date:
January 25, 2006
Sequence Number:
3
Case Number:
Publication Date:
September 9, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 105.28 KB |
Body:
. --'XpproVed"FU Rdtns"08M#. 4
CLASSIFICATION- t~: 0rrxIiOL u4!- OFF 101
OIU-X
REPORT NO._.,...-.__j
DATE OF CONTEhT..J
97
GATE PREPARED--- 9 September =9
P, GES.R~.,_ ~ ENCLOSURES (NO. & TYPE).
25X1
25X1
la On 18 July, J-95), the Soviet construction headquarters at Wercler again reviset the
plans for the 4ireraft revetments at Parchta airfield. The Soviets ordered "'wit
only the 12 saEtern reve ie: to be cozngpleted, while all work on the remaining 2I8
revetments had to be suspended. The surplus earth >i'esu:Lting from. the con, 'ruction
of the conneettr lanes a n d the widening of the to xiway was to be u s e d for the
leveling of :the fields Senior Lieutenant; Lieryaicoy (fnu) ordered that th e
estimated cost for the 12 sircraft revetments to be built would to. be aukbtted n
two sections.9 one covering the coat for the concrete surfaces the other for the
protecting wa~1:s.
2. On 18 July, .Sekgior Id eutenant Lisryakov in Werder signed new plans whit, :
related to the requirements cof concrete for the runwwy at the - airfie; d o The
plans a ee9--ar sat a correction in the previous planss necessary because cuing
the course of ;?nivtruction work it was discovered that, the leveling; roference
Points end the terrain had been determined inaccurateJ.y. On these plans the
o -t-Ugit numl,ors in parentheses represent the height of the old a away over
J evvJ s , rhi l.ft they four.-digit .figures. above the figures in
the height of new runway surface. The figure to the left of these hesthese tw wcz group
of figure : repres )nt the quantity of new concrete required in cubic ,re fars
ULr, Of the 40 aircraft revetments originally scheduled .to be built
zrcltixn airfield only 12 trill be built for the time being,pr abably for econor.` c
reasons. Senior Liettenant ,snyrkov is reported for the first 'time,; For
pl u?:Aagrap'.:9 of recor:is related to the concrete req emonts for the runty see
Annex : attachment. 2 sets of construction plans oofFarchim a r ric~ld,, (a v
CLASSIR-ATION -" kt r,GONPROL - I1uS,., OWI{?IC14L ONLY
Approved For Release 2006/01/31 : CIA-RDP80-0081OA002400590003-8